Home / Browse projects / Mumbai Suburban, Maharashtra / MARSHAL SRISHTI III
MARSHAL SRISHTI III
RG-MH-05896 · RERA P51800051531 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARSHAL SRISHTI III is a Residential / Group Housing project by MARSHAL CORPORATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051531 on 23 Jun 2023. Possession is promised by 31 Dec 2028. 121 of the 207 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.
At a glance
Project
- NameMARSHAL SRISHTI III
- TypeResidential / Group Housing
- Location
- ATMARAM BHOIR MARG
- BHANDUP WEST
- Bhandup
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800051531
- ReraGenie IDRG-MH-05896
Builder
- NameMARSHAL CORPORATION
- Entity typePartnership
- PartnersKAMLESH HARI THAKUR, ASHOK GOPALDAS KRIPALANI, JAGDISH HARI THAKUR, LAJWANTI HARI THAKUR, NATHAN PROPERTIES PVT LTD, BHARAT KUMAR ACHALCHAND JAIN, BABULAL KANHAYALALJI PALIWAL, ADITYA BHARAT KUMAR JAIN
- Other registrations1 more →
- Completed1 of 2
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jun 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed92 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Marshal Srishti III Wing A | NA | 23 | 23 | 103 | 7 | 110 |
| Marshal Srishti III Wing B | NA | 23 | 23 | 95 | 2 | 97 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 95%.
Marshal Srishti III Wing A80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Marshal Srishti III Wing B80%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 95% |
| Podiums (if any) | 0% |
| Plinth | 95% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities16
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 30% |
| Community Buildings | Yes | 20% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 90% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | Yes | 80% |
| FITNESS CENTRE | Yes | 100% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Marshal Srishti III Wing A | 1 | 1 | 2 |
| Marshal Srishti III Wing B | 1 | 0 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VETURKAR & ASSOCIATES |
| Engineer | JW CONSULTANTS LLP |
| Engineer | H J THAKUR |
| Chartered Accountant | GAJARIA SHAH & ASSOCIATES |
| Chartered Accountant | AKASH G SHAH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MARSHAL CORPORATION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 MARSHAL 3 MARCH 2026.pdf | 20 Apr 2026 |
| Form 2File: RERA FORM 2 Marshal III Mar 2026.pdf | 20 Apr 2026 |
| Form 3File: FORM 3 MARSHAL 3 MARCH 2026.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Marshal Srishti III 31 Mar 2026.pdf | 20 Apr 2026 |
| Form 1File: FORM 1 MARSHAL 3 DEC 2025.pdf | 20 Jan 2026 |
| Form 2File: FORM 2 Marshal III DEC 2025.pdf | 20 Jan 2026 |
| Form 3File: FORM 3 MARSHAL III OCT TO DEC 2025.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory marshal 3 dec 2025.pdf | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 MARSHAL SRISHTI III.pdf | 25 Oct 2025 |
| Form 1File: FORM 1 MARSHAL CORPN SEP 2025.pdf | 24 Oct 2025 |
| Form 2File: FORM 2 MARSHAL CORPN SEP 2025.pdf | 24 Oct 2025 |
| Form 3File: FORM 3 MARSHAL III 30 SEPT 2025.pdf | 24 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY MRSHAL 3 SEP 2025.pdf | 24 Oct 2025 |
| Form 1File: FORM 1 MARSHAL 3Marshal RERA certificate juNe 2025.pdf | 24 Jul 2025 |
| Form 2File: FORM 2 Marshal III JUN 2025.pdf | 24 Jul 2025 |
| Form 3File: FORM 3 MARSHAL III APRIL TO JUNE 2025.pdf | 24 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE Marshal Srishti III Annexure A 30-06-2025.pdf | 24 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 MARSHAL CORPORATION MARCH 2025.pdf | 2 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 Marshal III MAR 2025.pdf | 2 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 MARCH 2025.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 DEC 2024.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 DEC 2024.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 DEC 2024.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 DEC 2024.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 DEC 2024.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 DEC 2024.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 Marshal III DEC 2024.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 Marshal III DEC 2024.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 Marshal III DEC 2024.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Marshal 3 Sep 2024.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Marshal 3 Sep 2024.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Marshal 3 Sep 2024.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 SEPT 2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM Marshal III Sep 2024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 SEPT 2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM Marshal III Sep 2024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 M3 SEPT 2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM Marshal III Sep 2024.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MARSHAL CORPORATION SRISHTI III.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MARSHAL CORPORATION SRISHTI III.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MARSHAL CORPORATION SRISHTI III.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 JUN 2024.pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARSHAL 3 JUN 2024.pdf | 13 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARSHAL 3 JUNE 2024.pdf | 12 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: UPTO 19 FLOOR A WING CC Comp Bldg of Marshal Corporation.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 MAR 2024.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARSHAL 3 MAR 2024.pdf | 10 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARSHAL 3 FORM 3.pdf | 10 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 DEC 2023.pdf | 24 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARSHAL 3 DEC 2023.pdf | 24 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARSHAL 3 DEC 2023.pdf | 18 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARSHAL 3 SEP 2023.pdf | 12 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL 3 SEP 2023.pdf | 10 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARSHAL 3.pdf | 10 Feb 2024 |
| Proforma of Agreement for saleFile: Draft Copy of Agreement for Sale Marshal Srishti III.pdf | 5 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION WRT AGREEMENT MARSHAL 3.pdf | 5 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL DJT DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL JHT DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL KHT DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL RAK DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL RGV DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL RKT DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL SRV DISCLOSURE INTEREST.pdf | 3 Jun 2023 |
| Building plan approvalFile: PLAN.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf | 1 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MARSHAL SRISHTI III MAY 2023 MIN.pdf | 24 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MARSHAL SRISHTI III SRA MAY 2023.pdf | 24 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARSHAL SRISHTI III MAY 2023.pdf | 24 May 2023 |
| Other - TechnicalFile: DECLARATION OF REHAB FLATS AND PARKING.pdf | 24 May 2023 |
| Layout approvalFile: IOA LETTER 7 AUG 2022.pdf | 23 May 2023 |
| Copy of Layout Approval (in case of layout)File: IOA LETTER 7 AUG 2022.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE ADITYA JAIN.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE AGK.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE BABULAL.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE BHARAT.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE JHT.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE KHT.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE LHT.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: NPPL AGK DISCLOSURE INTEREST.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE RGV.pdf | 23 May 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MARSHAL SRISHTIP51800000296 | Kurla, Mumbai Suburban | Jul 2017 | Certificate Signed | Dec 2018 | Jan 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARSHAL SRISHTI III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHANDUP WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 157 registered projects within 2 km.
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: MARSHAL CORPORATION
MARSHAL CORPORATION has 2 registrations on MahaRERA, including MARSHAL SRISHTI and MARSHAL SRISHTI III. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MARSHAL SRISHTI III is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARSHAL SRISHTI III?
The registered promoter entity is MARSHAL CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARSHAL SRISHTI III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MARSHAL SRISHTI III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARSHAL SRISHTI III?
The professionals named in the filing: Architect: VETURKAR & ASSOCIATES; Engineer: JW CONSULTANTS LLP; Engineer: H J THAKUR; Chartered Accountant: GAJARIA SHAH & ASSOCIATES; Chartered Accountant: AKASH G SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARSHAL SRISHTI III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback