ReraGenieLog inGet a buyer report

Home / Browse projects / MARKUS HARMONY

Registered No litigation declared Commercial project

MARKUS HARMONY

By MARKUS BUILDCON LLP

RG-MH-31621 · RERA P51900079956 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
May 2028Possession promisedmoved 10 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 0%
28 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

MARKUS HARMONY is a Commercial project by MARKUS BUILDCON LLP in MAHIM, 400016, registered with MahaRERA as P51900079956 on 7 Apr 2025. Possession is promised by 30 May 2028. The completion date has moved by 10 months from the original filing. 0 of the 28 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameMARKUS HARMONY
  • TypeCommercial
  • Location
    • AT 78 LADY JAMSHETJI ROAD MAHIM
    • MAHIM
    • 400016
  • Pincode400016
  • RERA no.P51900079956
  • ReraGenie IDRG-MH-31621

Builder

  • NameMARKUS BUILDCON LLP
  • Entity typePartnership

Key dates

this monthRegisteredApr 2025First promiseJul 2027Revised toMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Apr 2025
  • Promised completion30 May 2028
  • Revised completionRevised to 30 May 2028 (originally 31 Jul 2027)
  • Buildings1 building record
  • Documents filed55 files

Current status

0%0 of 28 units booked
24.3%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARKUS HARMONYNA4326228

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

MARKUS HARMONY: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area391 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Dec 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2000.0
Proposed, not sanctioned395 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSTATE BANK OF INDIA, 1ST FLOOR, LANDMARK BUILDING, S.V.ROAD BORIVALI WEST BRANCH MUMBAI 400092
Estimated costRs 12.30 cr
Cost incurredRs 2.99 cr
Work done24.28%
BuildingWingEstimatedIncurred
MARKUS HARMONYNARs 12.30 crRs 2.99 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHUDAWALA&ASSOCIATES
ArchitectCHUDAWALA & ASSOCIATES
EngineerJACOB BASTYAW D SOUZA BASTYAW SOUZA
Engineerjacob dsouza
EngineerCLINT DOS SANTOS
Chartered AccountantN B Sayed & Associates
Chartered AccountantNEHALI DOSHI
PartnerRole in project
MARKUS BUILDCON LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26062621553Jul 2027 → Jan 2028

Reason as filed by the promoterDuring the process of obtaining the Intimation of Disapproval (IOD), it came to our notice that an underground Metro tunnel passes beneath a portion of the project site situated on Lady Jamshetji Marg. Accordingly, it became mandatory to obtain a No Objection Certificate (NOC) from the Metro authorities before commencement of the construction work. However, pursuant to the conditions imposed by the Metro authorities for safeguarding the underground Metro tunnel, the entire structural planning had to be revisited and redesigned. As required by the Metro authorities, the project was redesigned t

P51900079956/WarJul 2027 → May 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 May 2028

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECH CERIFICATE FORM 1 ATR APR JUNE 26.pdf23 Jul 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE FOR QTR APR JUNE 2026.pdf23 Jul 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFIACTE FOR QTR APR JUN 2026.pdf23 Jul 2026
Withdrawal Update Form 1File: form 1.pdf19 May 2026
Withdrawal Update Form 2File: MARKUS ENGINEER CERTIFIACTE FOR QTR MARCH 2026.pdf19 May 2026
Withdrawal Update Form 3File: MARKUS CA CERTIFICATE MARCH QUARTER 2026 (FORM 3).pdf19 May 2026
Form 2A (FY 2025-2026)File: MARKUS FORM 2A QUALITY ASSURANCE CERTIFIACTE 2025-2026.pdf1 May 2026
Withdrawal Update Form 1File: ARCHITECH CERTIFICATE FORM 1 DEC QUARTER.pdf12 Mar 2026
Withdrawal Update Form 2File: MARKUS HARMONY FORM 2 ENGINEER CERTIFICATE DEC 25.pdf12 Mar 2026
Withdrawal Update Form 3File: MARKUS CA CERTIFIATE QUT DEC 25 SIGNED.pdf12 Mar 2026
Withdrawal Update Form 1File: MARKUS ARCHITECH CERTIFICATE 29-09-2025 latest.pdf8 Jan 2026
Withdrawal Update Form 2File: MARKUS ENGINEER CERTIFICATE FORM 2 (1) (1).pdf8 Jan 2026
Withdrawal Update Form 3File: SIGNED CA CERTIFICATE FORM -3 MARKUS HARMONY.pdf8 Jan 2026
Withdrawal Update Form 1File: MARKUS ARCHITECH CERTIFICATE 27-06-2025 latest.pdf31 Dec 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE FORM 2 SIGNED QUATER APRIL TO JUNE.pdf31 Dec 2025
Withdrawal Update Form 3File: SIGNED CA CERTIFICATE FOR JUNE QUARTER.pdf31 Dec 2025
Other - TechnicalFile: Adobe Scan 02-Apr-2025.pdf2 Apr 2025
Other - TechnicalFile: Undertaking for Plot Area under 500 sq mtrs.pdf28 Mar 2025
Other - FinanceFile: Declaration for Rehab units.pdf24 Mar 2025
Other - FinanceFile: 4 Other - Technical (19).pdf20 Mar 2025
Other - TechnicalFile: pg1.pdf1 Mar 2025
Other - TechnicalFile: Drawing -MARKUS Harmony_2-end.pdf1 Mar 2025
Layout approvalFile: Drawing markus (1).pdf6 Jul 2024
Copy of Layout Approval (in case of layout)File: Drawing markus (1).pdf6 Jul 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL (1) (1) (1).pdf6 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate attached (1).pdf6 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 - Markus Harmony.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf6 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 2446846_FirstCC_signed.pdf6 Jul 2024
Other - LegalFile: CONVEYANCE DEED COPY 1-58.pdf6 Jul 2024
Other - LegalFile: CONVEYANCE DEED COPY 59-120.pdf6 Jul 2024
Other - LegalFile: CONVEYANCE DEED COPY 121-end.pdf6 Jul 2024
Declaration about Commencement CertificateFile: FORMAT D RERA.pdf6 Jul 2024
Deviation Report with respect to Allotment letterFile: Allotment No deviation.pdf6 Jul 2024
Other - TechnicalFile: ANNEXURE A ORDER NUMBER 50 .pdf6 Jul 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT DRAFT.pdf6 Jul 2024
Proforma of Agreement for saleFile: MARKUS HARMONY AGREEMENT (MARKED) (1).pdf6 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B .pdf6 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance availed for the project (1).pdf6 Jul 2024
Copy of the legal title reportFile: Legal Title Report.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A HP.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: JAY RAJDA ANNEXURE A (1).pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A ZOHAAN ISANI (1).pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A OM PRAKASH DAGA (1).pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A OM PRAKASH DAGA (1).pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A NDS.pdf18 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A MAYUR THAKKAR (1).pdf18 Jun 2024
Building plan approvalFile: MARKUS IOD.pdf17 Jun 2024
PAN CardFile: MARKUS BUILDCON LLP PAN CARD.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LETTER RERA.pdf17 Jun 2024
Declaration in FORM BFile: FORM B RERA.pdf17 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: MARKUS IOD.pdf17 Jun 2024
CERSAI detailsFile: CERSAI LETTER RERA.pdf17 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A RERA .pdf17 Jun 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LETTER RERA.pdf17 Jun 2024

Keep MARKUS HARMONY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHIM

Builder: MARKUS BUILDCON LLP

MARKUS BUILDCON LLP has 1 registration on MahaRERA, including MARKUS HARMONY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if MARKUS HARMONY is delayed beyond 30 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARKUS HARMONY?

The registered promoter entity is MARKUS BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARKUS HARMONY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARKUS HARMONY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MARKUS HARMONY?

The professionals named in the filing: Architect: CHUDAWALA&ASSOCIATES; Architect: CHUDAWALA & ASSOCIATES; Engineer: JACOB BASTYAW D SOUZA BASTYAW SOUZA; Engineer: jacob dsouza; Engineer: CLINT DOS SANTOS; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MARKUS HARMONY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARKUS HARMONY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARKUS HARMONY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.