Margashirsha Heights
By Margashirsha Constrotech Pvt Ltd
RG-MH-12560 · RERA P52100010490 · Last updated on MahaRERA portal: 4 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Margashirsha Heights is a Residential / Group Housing project by Margashirsha Constrotech Pvt Ltd in DHANORI, 411015, registered with MahaRERA as P52100010490 on 31 Aug 2017. Possession was promised by 29 Dec 2023 and is now 34 months past that date. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameMargashirsha Heights
- TypeResidential / Group Housing
- Location
- DHANORI ROAD
- DHANORI
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100010490
- ReraGenie IDRG-MH-12560
Builder
- NameMargashirsha Constrotech Pvt Ltd
- Entity typeCompany
- CINU45400PN2013PTC148236
- GSTIN27AAICM7444D1ZE
- Managing DirectorRajashree maruti Katke
- ChairpersonHemlata Chandraharsh sawant
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion29 Dec 2023
- Revised completionRevised to 29 Dec 2023 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Margashirsha Heights | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.
Margashirsha Heights: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 4 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 73% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 73% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 73% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashwini Ghonge |
| Architect | AR Anjali Korke Pavan |
| Engineer | Shailesh Dasharath Lokhande |
| Chartered Accountant | Mr Desai |
| Chartered Accountant | Mr Ajinkya Hiran |
| Partner | Role in project |
|---|---|
| Margashirsha Constrotech Pvt Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject is delayed because of- Pandemic, covid-19, Delay in obtaining Airport Authority of INDIA NOC and Heavy Rainfall in season. Pandemic hit us very badly, we have lost most of the assets and work momentum in the bad time. We have suffered financially and Airport NOC process delayed because of process changed by Govt. of India and Pandemic. We request MAHARERA to consider this for the extension under section 6 and grant further extension of 1 year. Airport authority NOC obtaining process got delayed because of covid-19 and central government process transparency issues. They have Survey of
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000177703 | Dinesh Rama Rane | Margashirsha Constrotech Pvt Ltd | 30/10/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jul 2022
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: declaration-DHN_compressed.pdf | 4 Dec 2024 |
| Details of encumbrances concerned to LegalFile: declaration-DHN_compressed.pdf | 4 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2- ENGG 05042023.pdf | 4 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1- ARCH 05042023_compressed.pdf | 18 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2- ENGG 05042023_compressed.pdf | 18 Apr 2023 |
| Certificates of CA (Form 3)File: FORM3 -CA 11042023.pdf | 11 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1- ARCH 10102022.pdf | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2- ENGG 10102022.pdf | 4 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A- ENGG YERLY 2022.pdf | 4 Nov 2022 |
| Certificates of CA (Form 3)File: FORM3 -CA 10102022.pdf | 4 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5 CA AUDIT 2021-22 02112022.pdf | 4 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2- ENGG 07072022.pdf | 21 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1- ARCH 06072022.pdf | 20 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A- ENGG YERLY 2020.pdf | 20 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A- ENGG YERLY 2021.pdf | 20 Jul 2022 |
| Certificates of CA (Form 3)File: FORM3-CA 10072022.pdf | 20 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM5 CA AUDIT 2018-19 26092019.pdf | 20 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5 CA AUDIT 2019-20 05122020.pdf | 20 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM5 CA AUDIT 2020-21 02112021.pdf | 20 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION PMC PART- DHANORI.pdf | 6 Jul 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART COMPLETION ARCH DHN.pdf | 22 Jun 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: DHN- SOCIETY FORMATION NOTICE.pdf | 22 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory-RERA DHN.pdf | 18 Jun 2022 |
| Declaration about Commencement CertificateFile: Declaration about commencement RERA DHN.pdf | 14 Jun 2022 |
| Building plan approvalFile: Revised Sanction2 low size PG1.pdf | 10 Jun 2022 |
| Building plan approvalFile: Revised Sanction2 low size PG2.pdf | 10 Jun 2022 |
| Building Plan Approval (IOD)File: Revised Sanction2 low size PG1.pdf | 10 Jun 2022 |
| Building Plan Approval (IOD)File: Revised Sanction2 low size PG2.pdf | 10 Jun 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200239441248_For_Asset_Based_Search_10_06_2022_13_39_34_727.pdf | 10 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT 3 PMC- Dhanori_compressed (1).pdf | 9 Jun 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Notice for society formation-DHN.pdf | 3 Jun 2022 |
| Status of ConveyanceFile: Notice for society formation-DHN.pdf | 3 Jun 2022 |
| Certificates of CA (Form 3)File: CA FORM3 22032022_compressed (1).pdf | 24 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1- ARCH 10032022.pdf | 20 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2- ENGG 10032022.pdf | 20 Mar 2022 |
| Copy of the legal title reportFile: TITLE SEARCH 16092020low dpi-Dhanori.pdf | 24 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH 20082020.pdf | 24 Sep 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG 20082020.pdf | 24 Sep 2020 |
| Certificates of CA (Form 3)File: FORM 3 CA 20082020.pdf | 24 Sep 2020 |
| Copy of the legal title reportFile: Title search Dhanori 22052019 low dpi RERA.pdf | 22 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCH 11052019.pdf | 20 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENG 11052019.pdf | 20 May 2019 |
| Certificates of CA (Form 3)File: FORM 3 CA 11052019.pdf | 20 May 2019 |
| Certificates of CA (Form 5)File: RERA AUDIT FORM 5 -2017-18.pdf | 11 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 ARCH 270818.pdf | 28 Aug 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 ENG 270818.pdf | 28 Aug 2018 |
| Certificates of CA (Form 3)File: FORM3 CA 270818.pdf | 28 Aug 2018 |
| Certificates of CA (Form 5)File: FORM3 CA 270818.pdf | 28 Aug 2018 |
| Copy of the legal title reportFile: Search report 75dpi-dhanori.pdf | 8 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 15032018.pdf | 15 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 15032018.pdf | 15 Mar 2018 |
| Certificates of CA (Form 3)File: FORM3 150320181.pdf | 15 Mar 2018 |
| Layout approvalFile: NO LAYOUT DECLARATION.pdf | 31 Jul 2017 |
| Details of encumbrancesFile: NO ENCUMBRANCES DECLARATION.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: NO LAYOUT DECLARATION.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: FORMB Declaration-RERA.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1 ARCHITECT-RERA.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 ENGINEER.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: FORM 3 CA RERA.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER PROFORMA MCPL.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: SALE AGREEMENT PROFORMA.pdf | 31 Jul 2017 |
| Building plan approvalFile: Revised Sanction low size PG2.pdf | 28 Jul 2017 |
| Building plan approvalFile: Main sanction low size PG2.pdf | 28 Jul 2017 |
| Building plan approvalFile: Revised Sanction low size PG1.pdf | 28 Jul 2017 |
| Building plan approvalFile: Main sanction low size PG1.pdf | 28 Jul 2017 |
| PAN CardFile: PAN CARD-MS.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title search 30yrs low size.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title search 1yrs low size-1.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title search 1 yrs low size-2.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Main sanction low size PG1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Main sanction low size PG2.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Revised Sanction low size PG1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: Revised Sanction low size PG2.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT 1 PMC lower size- Dhanori.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT 2 PMC lower size- Dhanori.pdf | 28 Jul 2017 |
| OtherFile: NA SANAD lower size -Dhanori.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Margashirsha Heights on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHANORI
Filed coordinates, straight-line distance. 76 registered projects within 2 km.
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: Margashirsha Constrotech Pvt Ltd
Margashirsha Constrotech Pvt Ltd has 1 registration on MahaRERA, including Margashirsha Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that Margashirsha Heights shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Margashirsha Heights is delayed beyond 29 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Margashirsha Heights?
The registered promoter entity is Margashirsha Constrotech Pvt Ltd, a company as per the filing. Its CIN U45400PN2013PTC148236 and GSTIN 27AAICM7444D1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Margashirsha Heights?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Margashirsha Heights?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Margashirsha Heights?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Margashirsha Heights?
The professionals named in the filing: Architect: Ashwini Ghonge; Architect: AR Anjali Korke Pavan; Engineer: Shailesh Dasharath Lokhande; Chartered Accountant: Mr Desai; Chartered Accountant: Mr Ajinkya Hiran. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Margashirsha Heights?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.