Home / Browse projects / Thane, Maharashtra / MARATHON NEXTOWN EMERALD

Completed No litigation declared Residential / Group Housing project

MARATHON NEXTOWN EMERALD

By MARATHON ENER-GEN

RG-MH-09727 · RERA P51700000686 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

MARATHON NEXTOWN EMERALD is a Residential / Group Housing project by MARATHON ENER-GEN in Thane, Maharashtra, registered with MahaRERA as P51700000686 on 20 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2020. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameMARATHON NEXTOWN EMERALD
  • TypeResidential / Group Housing
  • Location
    • DESAI VILLAGE OPP PADLEGAON BUS STOP NEAR SARASWATI SCHOOL
    • OFF KALYAN SHIL ROAD
    • Thane (M Corp.)
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000686
  • ReraGenie IDRG-MH-09727

Builder

  • NameMARATHON ENER-GEN
  • Entity typePartnership
  • Designated PartnersMAYUR RAMNIKLAL SHAH, KAIVALYA CHETAN SHAH
  • Other registrations4 more →
  • Completed3 of 5

Key dates

this monthRegisteredJul 2017First promiseJun 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jul 2017
  • Promised completion29 Dec 2020
  • Revised completionRevised to 29 Dec 2020 (originally 30 Jun 2019)
  • Buildings1 building record
  • Documents filed134 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARATHON NEXTOWN EMERALDNA200000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

MARATHON NEXTOWN EMERALD: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area893 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
MARATHON REALTY PVT LTDKurlaMumbai Suburban
MATESHWARI REALTORSThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10443.35
Proposed, not sanctioned10,243 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRATAN GALAXIE JUNCTION OF J N ROAD AND GOSHALA ROAD MULUND WEST MUMBAI

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
MARATHON ENER-GEN LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700001919Jun 2019 → Jun 2020

Reason as filed by the promoterThe plans for the above mentioned project are sanctioned by the Thane Municipal Corporation (TMC) which is the statutory authority. We commenced the work of Marathon Emerald as per TMC’s Commencement Certificate dated 04.11.2015 bearing reference V.P.No.S11/0014/10TMC/TDD/1544/15 for Ground + Stilt+1st to 15th+16(Part) Floors. Accordingly we have completed the plinth and applied for certification of the plinth to the TMC and same were granted to us on 22.03.2016. Thereafter we had applied for amendment of the plan from 16th (Part) floor to 19th Floor on 29.08.2017 and the same was granted afte

Litigation declared1

CaseCourtStatus
M A 42 OF 2013/2013THANE CITY CIVIL COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Dec 2024

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Emerald_2025.pdf25 Apr 2025
Certificates of CA (Form 3)File: Form 03 Emerald Rera Certificate Mar 2025.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate Emerald Mar 2025.pdf25 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Emrald June-2024.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Emrald Sep-2024.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Emerald Dec 2024.pdf2 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Emerald Dec 2024.pdf18 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Sep 2017.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Dec Mar 2020.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Dec 2019.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Sep 2019.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Jun 2019.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Mar 2019.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Dec 2018.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Sep 2018.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Jun 2018.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Mar 2018.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Dec 2017.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emerald Jun 2017.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Emerald Jun 2020.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Emerald Sep 2020.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Emerald Dec 2020.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Emerald Mar 2021.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Emerald Mar 2022.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Nextown Emerald From 05 Rera Certificate Apr-21-Mar-22.pdf28 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Nextown Emerald From 05 Rera Certificate Apr-21-Mar-22.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nextown Emerald From 05 Rera Certificate Apr-22-Mar-23.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nextown Emerald From 05 Rera Certificate Apr-23-Mar-24.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Jun 2022.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Sep 2022.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Dec 2022.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Mar 2022.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald June 2023.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Sep 2023.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Dec 2023.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Mar 2024.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Jun 2024.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Sep 2024.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Mar 2022.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Dec 2021.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Sep 2021.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Jun 2021.pdf31 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Eng Certificate_Nextown-Emerald Mar-2021.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 03 Emerald Rera Certificate Dec 2024.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_Nextown-Emerald-Sep2020.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate Emerald-Jun 2020.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_Nxt-Emerald-Dec19.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Nextown-Emerald Sep-19.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Nextown-Emerald-Jun19.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Emerald Sep-18.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Nextown-Emerald JN-18.pdf16 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Emerald_2024.pdf14 Jan 2025
Certificates of CA (Form 3)File: MEGL Rera Certificate Emerald Jun 2019.pdf27 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EMERALD.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Emerald Dec 2019.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Emerald_2024.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Emerald_2024.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Emerald Sep 2020.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Emerald Sep 2020.pdf19 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Emerald Sep 2020.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Sep 24.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald June 24.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Coral March 24.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Dec 23.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Sep 23.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald June 23.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald March 23.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Dec 22.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Sep 22.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL June Emerald Jun 22.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Coral March 22.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Dec 21.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald June 21.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Sep 21.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald Dec 20.pdf19 Dec 2024
Certificates of CA (Form 3)File: MEGL Emerald March 21.pdf19 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Emerald Mar 2019.pdf19 Dec 2024
Certificates of CA (Form 3)File: NEXTOWN-EMERALD DEC17.pdf17 Dec 2024
Certificates of CA (Form 3)File: Emerald Rera Certificate Jun 2018.pdf17 Dec 2024
Certificates of CA (Form 3)File: Emerald Rera Certificate Sep 19.pdf17 Dec 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 18 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON NEXTOWN EMERALD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OFF KALYAN SHIL ROAD7,600+ in Thane

2 kmMARATHON NEXTOWN EMERALDCompleted 36Lapsed / revoked 11Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 82 registered projects within 2 km.

Builder: MARATHON ENER-GEN

MARATHON ENER-GEN has 5 registrations on MahaRERA, including MARATHON NEXTOWN EMERALD and MARATHON NEXTOWN CORAL. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MARATHON NEXTOWN EMERALD is delayed beyond 29 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON NEXTOWN EMERALD?

The registered promoter entity is MARATHON ENER-GEN, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON NEXTOWN EMERALD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARATHON NEXTOWN EMERALD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in MARATHON NEXTOWN EMERALD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON NEXTOWN EMERALD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON NEXTOWN EMERALD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.