Home / Browse projects / Mumbai Suburban, Maharashtra / MARATHON NEOSKIES
MARATHON NEOSKIES
RG-MH-79345 · RERA P51800018106 · Last updated on MahaRERA portal: 28 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 40 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON NEOSKIES is a Residential / Group Housing project by M/S Suyog Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018106 on 10 Oct 2018. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 12 months from the original filing. 40 complaints are on record with the regulator.
At a glance
Project
- NameMARATHON NEOSKIES
- TypeResidential / Group Housing
- Location
- UTTKARSH NAGAR
- BHANDUP WEST
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- RERA no.P51800018106
- ReraGenie IDRG-MH-79345
Builder
- NameM/S Suyog Developers
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Oct 2018
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed146 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHON NEOSKIES 1 | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
MARATHON NEOSKIES 1: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| M/S Suyog Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterdue to delay in approval by authority along with acute shortage of construction Water Supply and other construction raw material
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 6259/2018 | Bombay city civil court | pending for final hearing |
Complaints filed with MahaRERA40
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000428786 | Diptesh Satyawan Kande | Mayur shah | 09/01/2024 |
| CC006000000439702 | Shashank Prabhakar Chavan | M/S, Suyog Developers | 30/05/2024 |
| CC006000000500645 | Sonal Shashank Chavan | M/S Suyog Developers | 31/05/2024 |
| CC12400730 | AMIT VIJAY PAWAR | M/S Suyog Developers | 11/11/2024 |
| CC12400750 | GANESH BABAN PAWAR | M/S Suyog Developers | 12/11/2024 |
| CC12400833 | SHRADDHA VIJAY KANDE | M/S Suyog Developers | 20/11/2024 |
| CC12400840 | POONAM SUKUR BHOIR | M/S Suyog Developers | 21/11/2024 |
| CC12400845 | MILIND MINANATH PARADKAR | M/S Suyog Developers | 21/11/2024 |
| CC12400854 | KALYANI RAHUL CHALKE | M/S Suyog Developers | 22/11/2024 |
| CC12400856 | Prasad Mahadev Bamane | M/S Suyog Developers | 23/11/2024 |
| CC12400876 | Amol Mahadev Sawant | M/S Suyog Developers | 23/11/2024 |
| CC12400879 | ROHAN TUKARAM PANGALE | M/S Suyog Developers | 24/11/2024 |
| CC12400891 | Akshay Sushilkumar Bartakke | M/S Suyog Developers | 26/11/2024 |
| CC12400894 | Sachin Gunaji Dawal | M/S Suyog Developers | 26/11/2024 |
| CC12400902 | Seema Vikrant Patil | M/S Suyog Developers | 27/11/2024 |
| CC12400906 | Kishor Subhash Shirsat | M/S Suyog Developers | 27/11/2024 |
| CC12400933 | Sandeep Ramchandra Sawant | M/S Suyog Developers | 29/11/2024 |
| CC12400940 | ARCHIE SAHADEV CHAUGHULE | M/S Suyog Developers | 30/11/2024 |
| CC12400944 | Purushottam Ravindra Sawant | M/S Suyog Developers | 30/11/2024 |
| CC12400976 | Mangesh Janardan Bandekar | M/S Suyog Developers | 02/12/2024 |
| CC12401075 | Supriya Vijay Sawant | M/S Suyog Developers | 09/12/2024 |
| CC12401076 | ANURADHA ARVIND INGALE | M/S Suyog Developers | 09/12/2024 |
| CC12401079 | Pallavi Kunjar Tirmare | M/S Suyog Developers | 10/12/2024 |
| CC12401108 | Prashant Dewoo Tambe | M/S Suyog Developers | 12/12/2024 |
| CC12401120 | Rohan Ramchandra Jadhav | M/S Suyog Developers | 13/12/2024 |
| CC12401166 | ARATI NAMDEO KANADE | M/S Suyog Developers | 18/12/2024 |
| CC12401157 | Santosh Anant Palvankar | M/S Suyog Developers | 17/12/2024 |
| CC12401173 | Sidhesh Vijaykumar Pawar | M/S Suyog Developers | 18/12/2024 |
| CC12401196 | Suraj Sudhakar Talkar | M/S Suyog Developers | 21/12/2024 |
| CC12401201 | Sanjay Digambar Parab | M/S Suyog Developers | 21/12/2024 |
| CC12401278 | KARUNA SUBHASH POTE | M/S Suyog Developers | 29/12/2024 |
| CC12401284 | Suraj Shrirang Gole | M/S Suyog Developers | 30/12/2024 |
| CC12500364 | Seema Suryakant Shinde | M/S Suyog Developers | 03/02/2025 |
| CC12500691 | Mayur Prakash Raut | M/S Suyog Developers | 27/02/2025 |
| CC12500766 | Pooja Ratnakar Sawant | M/S Suyog Developers | 06/03/2025 |
| CC12500832 | Varada Rajmohan Pillai | M/S Suyog Developers | 11/03/2025 |
| CC12500989 | Sheetal Sachin Bhatose | M/S Suyog Developers | 21/03/2025 |
| CC12501022 | Rushikesh Anant Salunke | M/S Suyog Developers | 26/03/2025 |
| CC12503807 | M/S Suyog Developers | Sandeep Bhausaheb Dighe | 31/10/2025 |
| CC12503808 | M/S Suyog Developers | Sunil Sharad Vinekar | 31/10/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Apr 2024
Documents filed146
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Neoskies_2025.pdf | 28 Apr 2025 |
| Certificates of CA (Form 3)File: Rera Certificate Neoskies March 25.pdf | 28 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_NEOSKIES Mar 2025.pdf | 28 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Neoskies Mar 2022.pdf | 30 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Neoskies Dec 24.pdf | 28 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Cert neoskies Dec 2018.pdf | 28 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_NEOSKIES Dec 2024.pdf | 28 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_NEOSKIES-1-Jun 2020.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Neoskies 2021.pdf | 28 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Neoskies Dec 2018.pdf | 22 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_NEOSKIES-1-Jun 2020.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Neoskies Jun 2021.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Neoskies Sep 2021.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Neoskies Dec 2021.pdf | 21 Jan 2025 |
| Certificates of CA (Form 3)File: Form3 RERA CERTIFICATE Neoskies June 20.pdf | 17 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Neoskies Sep 20.pdf | 15 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Neoskies Dec 20.pdf | 15 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Neoskies Jun 21.pdf | 15 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Neoskies Sep 21.pdf | 15 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 NEOSKIES- 1 RERA CERTIFICATE Mar 2019.pdf | 15 Jan 2025 |
| Certificates of CA (Form 3)File: Neoskies 1_ Rera Certi_As On June 21.pdf | 15 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_NEOSKIES-1-Dec 2021.pdf | 15 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_NEOSKIES-1-Dec 2020.pdf | 15 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Neo Skies FORM 5 FY 2018-19.pdf | 15 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Neoskies_2024.pdf | 14 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_NEOSKIES-1-Sep 2019.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_NEOSKIES-1-Dec2019.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg CertiNEOSKIES-1Mar 2020.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_NEOSKIES-1-SEp 2020.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg Cert NEOSKIES-1March 2021.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENGG CERT NEOSKIES Jun 2021.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engg Certi NEOSKIES 1-Sep 2021.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Neoskies Eng Certificate march-2023.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Certi NEOSKIES-1 Dec 2018.pdf | 20 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg CertiNEOSKIES-1 - March 2019.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neohills Mar 2020.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Dec 2019.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Sep 2019.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Jun 2019.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Mar 2019.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Dec 2018.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Sep 2018.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Jun 2018.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Neoskies Jun 2020.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Neoskies Dec 2020.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Neoskies Dec 2020.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Neoskies Sep 2020.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Neoskies Jun 2020.pdf | 20 Dec 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200332296712_For_Asset_Based_Search_20_12_2024_14_23_48_518.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Neoskies-1.pdf | 20 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Neoskies-1.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Neoskies Sold Unsold Inventory 24.pdf | 19 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: 20241218232804.pdf | 19 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 UT Neoskies.pdf | 17 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Neoskies Arc Cert Form 1 18-19.pdf | 7 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Neoskies Arc Cert Form1 19-20.pdf | 7 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Neoskies Arc Cert Form 1 Q4 19-20.pdf | 7 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Neoskies Arc Cert Form1 20-21.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: Neoskies RERA CERTIFICATE SEP 2018.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: Neoskies Rera June23_CA.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: Neoskies 1 Rera Certificate Dec 22.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: NEOSKIES- 1 RERA CERTI MAR 21.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: Neoskies 1 Rera Certi Dec 21.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: Neoskies 1Rera Certi Sep 21.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: NEOSKIES- 1 RERA CERTI Dec 20.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: NEOSKIES- 1 RERA CERTI SEP 20.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: NEOSKIES 1 RERA CERTIFICATE SEP 2019.pdf | 7 Dec 2024 |
| Certificates of CA (Form 3)File: NEOSKIES RERA CERTIFICATE MAR 2020.pdf | 7 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Neoskies 1 Rera Certi June 21.pdf | 7 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM-4 UT Neoskies.pdf | 6 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 05 RERA CERTIFICATE FY-23-24.pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Cert Neoskies Sep 24.pdf | 23 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_NEOSKIES Sep 2024.pdf | 23 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Neoskies_2024.pdf | 14 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Neoskies_2024.pdf | 25 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_NEOSKIES June 2024.pdf | 25 Jul 2024 |
| Certificates of CA (Form 3)File: Form 03 Neoskies 1 Rera Certificate June 2024.pdf | 25 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A NEOSKIES 1_ MAR-2024.pdf | 27 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Neoskies OC dt 29042024.pdf | 30 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Neoskies_2024.pdf | 15 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- All 146 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MARATHON NEOSKIES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHANDUP WEST6,700+ in Mumbai Suburban
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: M/S Suyog Developers
M/S Suyog Developers has 1 registration on MahaRERA, including MARATHON NEOSKIES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that MARATHON NEOSKIES shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MARATHON NEOSKIES is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON NEOSKIES?
The registered promoter entity is M/S Suyog Developers, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON NEOSKIES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARATHON NEOSKIES?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARATHON NEOSKIES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in MARATHON NEOSKIES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback