MARATHON MONTE CARLO-2
RG-MH-09673 · RERA P51800002662 · Last updated on MahaRERA portal: 13 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON MONTE CARLO-2 is a Residential / Group Housing project by MARATHON REALTY PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002662 on 2 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 2 complaints are on record with the regulator.
At a glance
Project
- NameMARATHON MONTE CARLO-2
- TypeResidential / Group Housing
- Location
- Madan Mohan Malviya Road
- Mulund west
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800002662
- ReraGenie IDRG-MH-09673
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Aug 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed182 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHON MONTE CARLO | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
MARATHON MONTE CARLO: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANTOSH PREMCHAND DUBEY |
| Engineer | URVESH VIRENDRA MEHTA |
| Chartered Accountant | DINESH GANPAT PAI |
| Chartered Accountant | Apurva Shah |
| Chartered Accountant | Vijay Harsukhlal Mehta |
| Partner | Role in project |
|---|---|
| MARATHON REALTY PVT LTD | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| FA/205/2016/2016 | NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION NEW DELHI | FIXED FOR FINAL HEARING AT ADMISSION STAGE |
| FA/530/2016/2016 | NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION NEW DELHI | FIXED FOR FINAL HEARING AT ADMISSION STAGE ALONG WITH CONDONATION OF DELAY |
| FA/1211/2016/2016 | NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION NEW DELHI | FIXED FOR FINAL HEARING AT ADMISSION STAGE |
| FA/205/2016 /2016 | NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION NEW DELHI | PENDING |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056806 | Jyoti Soni | Mayur R. Shah | 01/11/2018 |
| CC12600695 | TUSHAR KANAIYALAL PANDYA | MARATHON REALTY PVT LTD | 06/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Jan 2024
Documents filed182
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 182 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2017-2018)File: Form 2A Carlo 2 Mar 2018.pdf | 13 Feb 2026 |
| Form 2A (FY 2018-2019)File: Form 2A Carlo 2 Mar 2019.pdf | 13 Feb 2026 |
| Form 2A (FY 2019-2020)File: Form 2A Carlo 2 Mar 2020.pdf | 13 Feb 2026 |
| Form 2A (FY 2021-2022)File: Form 2A Monte Carlo 2 Mar 2022.pdf | 13 Feb 2026 |
| Form 2A (FY 2023-2024)File: SIGNEDForm 2A - QAC-MONTE CARLO 2-FY23-24.pdf | 13 Feb 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Monte Carlo-2_2025.pdf | 28 Apr 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_March 2025.pdf | 28 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2 Mar 2025.pdf | 28 Apr 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_March 2022.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Dec 2022.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_June 2021.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Sep 2021.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Sep 2023.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: CARLO PHASE-II CERTI_ DEC 20.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: CARLO PHASE-II CERTI_ MAR 21.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: Monte Carlo Phase - II Rera Certificate As on Dec 2019.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Dec 2022.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Dec 2021.pdf | 11 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Monte Carlo 2 RERA Eng Cert Jun 2023.pdf | 11 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Carlo 2 RERA Eng Cert Dec 2022.pdf | 11 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Carlo 2 Mar 2022.pdf | 11 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Monte Carlo 2 Sep 22.pdf | 11 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2 Sep 2023.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Mar 2020.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Sep 2017.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Dec 2019.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Sep 2019.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Jun 2019.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Mar 2019.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Dec 2018.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Sep 2018.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Jun 2018.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Mar 2018.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Dec 2017.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Carlo 2 Jun 2017.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Carlo 2 Sep 2020.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Carlo 2 Mar 2021.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Carlo 2 Jun 2021.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Carlo 2 Sep 2021.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Carlo 2 Dec 2021.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Monte Carlo 2 Mar 2022.pdf | 11 Mar 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Dec 2024.pdf | 30 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2 Dec 2024.pdf | 30 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Monte Carlo-2_2024.pdf | 14 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Monte Carlo 2.pdf | 29 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Monte Carlo Phase II - signed.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Monte Carlo-2_2024.pdf | 21 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Monte Carlo-2_2024.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo 2_Sep 2024.pdf | 21 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_Carlo 2 June 2024.pdf | 21 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Certificate for Monte Carlo 2_Sep 2024.pdf | 21 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_Carlo 2 Sep 2024.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 Ca Cert Monte Carlo 2 June-24.pdf | 24 Jul 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Mar 2024.pdf | 26 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIGNEDForm 2A - QAC-MONTE CARLO 2-FY23-24.pdf | 27 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Monte Carlo-2_2024.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_Carlo 2 Mar 2024.pdf | 23 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Form-1_Monte Carlo-2_2023.pdf | 30 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2 Dec-2023.pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_Dec 2023.pdf | 30 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 25 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY22-23.pdf | 19 Oct 2023 |
| Certificates of CA (Form 3)File: MRPL RERA_March 2022.pdf | 18 Oct 2023 |
| Certificates of CA (Form 5)File: Form 5 FY21-22.pdf | 18 Oct 2023 |
| Certificates of CA (Form 5)File: Form 5 FY22-23.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ca 18.pdf | 16 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_MOC 2 FY 21-22.pdf | 16 Oct 2023 |
| Proforma of Agreement for saleFile: afs calo.pdf | 16 Oct 2023 |
| Certificates of CA (Form 3)File: RERA Certificate for Monte Carlo-2_March 2022.pdf | 12 Oct 2023 |
| Building plan approvalFile: SANCTION PLAN MONTECARLO 2.pdf | 11 Oct 2023 |
| Building Plan Approval (IOD)File: SANCTION PLAN MONTECARLO 2.pdf | 11 Oct 2023 |
| Certificates of CA (Form 3)File: MONTE CARLO PHASE- II RERA CERTIFICATE AS ON 310319.pdf | 11 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11012019.pdf | 9 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2-Sep 2021.pdf | 9 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2-Dec 2021.pdf | 9 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Carlo 2-Jun 2021.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22.pdf | 9 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 31ST MARCH 2023 CERTOFICATE OF UNDERTAKING.pdf | 9 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sheshraj ventures pvt lt_20231009104334.pdf | 9 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 182 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARATHON MONTE CARLO-2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund west6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 316 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: MARATHON REALTY PVT LTD
MARATHON REALTY PVT LTD has 7 registrations on MahaRERA, including MARATHON MONTE CARLO-2 and MARATHON MONTEPLAZA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that MARATHON MONTE CARLO-2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MARATHON MONTE CARLO-2 is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON MONTE CARLO-2?
The registered promoter entity is MARATHON REALTY PVT LTD, a company as per the filing. Its CIN U70100MH1994PTC084037 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON MONTE CARLO-2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MARATHON MONTE CARLO-2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MARATHON MONTE CARLO-2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHON MONTE CARLO-2?
The professionals named in the filing: Architect: SANTOSH PREMCHAND DUBEY; Engineer: URVESH VIRENDRA MEHTA; Chartered Accountant: DINESH GANPAT PAI; Chartered Accountant: Apurva Shah; Chartered Accountant: Vijay Harsukhlal Mehta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHON MONTE CARLO-2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.