Home / Browse projects / Mumbai Suburban, Maharashtra / MARATHON MILLENNIUM 2
MARATHON MILLENNIUM 2
RG-MH-04121 · RERA P51800021203 · Last updated on MahaRERA portal: 27 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Rs 150.00 crore secured on the land, in favour of Piramal Enterprises Ltd
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON MILLENNIUM 2 is a Commercial project by TERRAPOLIS ASSETS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021203 on 14 Jun 2019. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 103 of the 298 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameMARATHON MILLENNIUM 2
- TypeCommercial
- Location
- LBS ROAD VILLAGE NAHUR
- NIRMAL LIFE STYEL MALL
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- RERA no.P51800021203
- ReraGenie IDRG-MH-04121
Builder
- NameTERRAPOLIS ASSETS PVT LTD
- Entity typeCompany
- CINU20210MH1993PTC073697
- DirectorsChetan Ramniklal Shah, CHETAN RAMNIKLAL SHAH
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jun 2019
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed129 files
Current status
Figures as on 27 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHON MILLENNIA 2 | NA | 17 | 15 | 0 | 298 | 298 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 84%.
MARATHON MILLENNIA 2: 29% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 84% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 61% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 67% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 47% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 64% |
Progress on shared amenities15
As on 27 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 85% |
| Street Lighting | Yes | 60% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MARATHON MILLENNIA 2 | NA | Rs 45.22 cr | Rs 48.54 cr |
| - | NA | Rs 10.85 cr | Rs 15.62 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANTOSH PREMCHAND DUBEY |
| Engineer | URVESH VIRENDRA MEHTA |
| Chartered Accountant | DINESH GANPAT PAI |
| Chartered Accountant | PREETI SINGH |
| Partner | Role in project |
|---|---|
| TERRAPOLIS ASSETS PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Nov 2023
Documents filed129
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Q3_AC_Form-1_Millennium-2_2025.pdf | 27 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Eng Cert Mill 2 Dec 2025.pdf | 27 Jan 2026 |
| Withdrawal Update Form 3File: RERA Certificate for Millenium_II_Dec 2025.pdf | 27 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 Mill 2 2024-25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 1File: Q2_AC_Form-1_Millennium-2_2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Engineeru0027s Certificate_Millennium 2 Sep 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 CA Cert Mill 2 Sep 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Q2_AC_Form-1_Millennium-2_2025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Engineeru0027s Certificate_Millennium 2 Sep 2025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 CA Cert Mill 2 Sep 2025.pdf | 15 Oct 2025 |
| Withdrawal Update Form 1File: Q1_AC_Form-1_Millennium-2_2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 1File: Q1_AC_Form-1_Millennium-2_2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 1File: Q1_AC_Form-1_Millennium-2_2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: signed-Form 2_Engineeru0027s Certificate_Millennium 2 Jun 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: signed-Form 2_Engineeru0027s Certificate_Millennium 2 Jun 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: signed-Form 2_Engineeru0027s Certificate_Millennium 2 Jun 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: RERA Certificate for Millenium_II_June 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: RERA Certificate for Millenium_II_June 2025.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: RERA Certificate for Millenium_II_June 2025.pdf | 10 Oct 2025 |
| Form 5 (FY 2021-2022)File: Form 5_Millenium_II.pdf | 17 Sep 2025 |
| Form 5 (FY 2022-2023)File: RERA Form 5 for Millenium_II (FY 2022-23).pdf | 17 Sep 2025 |
| Form 5 (FY 2023-2024)File: TAPL_Form 5_Millennium 2_Mar-24.pdf | 17 Sep 2025 |
| Withdrawal Update Form 1File: Q1_AC_Form-1_Millennium-2_2025.pdf | 7 Aug 2025 |
| Withdrawal Update Form 2File: signed-Form 2_Engineeru0027s Certificate_Millennium 2 Jun 2025.pdf | 7 Aug 2025 |
| Withdrawal Update Form 3File: RERA Certificate for Millenium_II_June 2025.pdf | 7 Aug 2025 |
| Form 1File: Q4_AC_Form-1_Millennium-2_2025.pdf | 10 Jul 2025 |
| Form 2File: Form 2_Engineer's Certificate_Millennium 2 Mar 2025.pdf | 10 Jul 2025 |
| Form 3File: RERA Certificate for Millenium_II_March 2025.pdf | 10 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DSUI Millenium_II_March 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 1File: Q4_AC_Form-1_Millennium-2_2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 2File: Form 2_Engineeru0027s Certificate_Millennium 2 Mar 2025.pdf | 10 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 Ca Cert Mill-2 June-24.pdf | 10 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Millennium 2 Mar 2025.pdf | 4 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Millennium-2_2025.pdf | 29 Apr 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_March 2025.pdf | 29 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Millennium 2 Mar 2025.pdf | 29 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Mill 2 Jun 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Mill 2 Sep 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Mill 2 Dec 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Mill 2 Dec 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Foem 2A Millennium 2 Jun 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Foem 2A Millennium 2 Sep 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Foem 2A Millennium 1 Dec 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mill 2 Jun 2021.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mill 2 Sep 2021.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Mill 2 Dec 2021.pdf | 28 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill 2 Sep 2019.pdf | 25 Feb 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_Dec 2024.pdf | 30 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Millennium 2 Dec 2024.pdf | 30 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Mar 2020.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Dec 2020.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Jun 2020.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Sep 2020.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Dec 2021.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Mar 2021.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Jun 2021.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Mill -2 Sep 2021.pdf | 23 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Millennium-2_2024.pdf | 14 Jan 2025 |
| Certificates of CA (Form 3)File: Millennium - II Rera Certi _ DEC 20.pdf | 9 Jan 2025 |
| Certificates of CA (Form 3)File: MILLENNIA-2 RERA CERTIFICATE Mar 2019.pdf | 9 Jan 2025 |
| Certificates of CA (Form 3)File: MILLENNIA-2 RERA CERTIFICATE Mar 2019.pdf | 9 Jan 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_March-2022.pdf | 9 Jan 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_Sep 2023.pdf | 9 Jan 2025 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_June 2023.pdf | 9 Jan 2025 |
| Certificates of CA (Form 3)File: Millennium - II Rera Certi _ DEC 20.pdf | 9 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TAPL_Form 5_Millennium 2_Mar-24.pdf | 6 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: TAPL_Form 5_Millennium 2_Mar-24.pdf | 5 Dec 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_Sep 2024.pdf | 21 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_Millennium 2 Sep 2024.pdf | 21 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q2_AC_Form-1_Millennium-2_2024.pdf | 14 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: signedQ1_AC_Form-1_Millennium-2_2024.pdf | 24 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_Millennium 2 June 2024.pdf | 24 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Ca Cert Mill-2 June-24.pdf | 24 Jul 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_March 2024.pdf | 24 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Millennium-2_2024.pdf | 17 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: signedForm 2_Engineer's Certificate_Millennium 2 Mar 2024.pdf | 17 Apr 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_March 2024.pdf | 17 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Millennium-2_2023.pdf | 24 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Millennium 2 Dec-2023.pdf | 24 Jan 2024 |
| Certificates of CA (Form 3)File: RERA Certificate for Millenium_II_Dec 2023.pdf | 24 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 129 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MARATHON MILLENNIUM 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NIRMAL LIFE STYEL MALL6,700+ in Mumbai Suburban
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: TERRAPOLIS ASSETS PVT LTD
TERRAPOLIS ASSETS PVT LTD has 2 registrations on MahaRERA, including MARATHON MILLENNIUM 1 and MARATHON MILLENNIUM 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that MARATHON MILLENNIUM 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MARATHON MILLENNIUM 2 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON MILLENNIUM 2?
The registered promoter entity is TERRAPOLIS ASSETS PVT LTD, a company as per the filing. Its CIN U20210MH1993PTC073697 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON MILLENNIUM 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MARATHON MILLENNIUM 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MARATHON MILLENNIUM 2?
The professionals named in the filing: Architect: SANTOSH PREMCHAND DUBEY; Engineer: URVESH VIRENDRA MEHTA; Chartered Accountant: DINESH GANPAT PAI; Chartered Accountant: PREETI SINGH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MARATHON MILLENNIUM 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback