Home / Browse projects / Mumbai Suburban, Maharashtra / MARATHON EMINENCE
MARATHON EMINENCE
RG-MH-59023 · RERA P51800016063 · Last updated on MahaRERA portal: 29 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MARATHON EMINENCE is a Residential / Group Housing project by NEXZONE BUILDCON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800016063 on 16 Apr 2018. The registration is recorded completed; possession was promised by 30 Dec 2023.
At a glance
Project
- NameMARATHON EMINENCE
- TypeResidential / Group Housing
- Location
- DR. R. P. ROAD
- MULUND WEST
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800016063
- ReraGenie IDRG-MH-59023
Builder
- NameNEXZONE BUILDCON LLP
- Entity typePartnership
- Designated PartnersMAYUR RAMNIKLAL SHAH, KAIVALYA CHETAN SHAH
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on16 Apr 2018
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed115 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MARATHON EMINENCE | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
MARATHON EMINENCE: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 29 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Fitness Centre | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| NEXZONE BUILDCON LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Nov 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 23 Oct 2023
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q4_AC_Form-1_Eminence_2025.pdf | 29 Apr 2025 |
| Certificates of CA (Form 3)File: Form 03 Eminence Rera Certificate Mar 2025.pdf | 29 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer's certificate_marathon Eminence-Mar 25.pdf | 29 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Jun 2018.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Sep 2018.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Dec 2018.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Mar 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Jun 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Sep 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Dec 2019.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence Mar 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eminence Jun 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eminence Sep 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eminence Dec 2020.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eminence Mar 2021.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Eminence Jun 2021.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Eminence Sep 2021.pdf | 28 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Eminence Dec 2021.pdf | 28 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Eminence Jun 2018.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Eminence Mar 2020.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Eminence Jun 2020.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Eminence Sep 2020.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arc Cert Eminence Dec 2020.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence Rera Certi Sep 2020.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Eminence Rera Certificate June 2024.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Eminence Rera Certificate Mar 2024.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Eminence Rera Certificate Dec 2023.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Rera Certificate Eminence Sep 23.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence Rera Certi June 23.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Eminence CA Certificate Form 03 Dec 2022.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence Rera Certi Mar 2022.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence Rera Certi Dec 2021.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Fomr 3 Eminence Rera Certi Sept 2021.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form Eminence Rera Certi MAR 2021.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence Rera Certi Dec 2020.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 EMINENCE RERA CERTIFICATE MAR 2020.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 EMINENCE RERA CERTIFICATE DEC 2019.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 EMINENCE RERA CERTIFICATE SEPT 2019.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence Rera Certificate Mar 19.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 EMINENCE RERA CERTI SEP 2018.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 EMINENCE RERA CERTI JUNE 2018.pdf | 7 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 05 Eminence -Apr-23-Mar-24.pdf | 7 Feb 2025 |
| Certificates of CA (Form 3)File: Form 03 Eminence Rera Certificate Dec 2024.pdf | 30 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer's certificate Eminence Dec 24.pdf | 30 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q3_AC_Form-1_Eminence_2024.pdf | 14 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Eminence Rera Certificate Apr 22-Mar 23.pdf | 6 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1 Architect’s Certificate on Completion of Project (Form 4) (4).pdf | 23 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMNC.pdf | 16 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Form-1_Eminence_2023.pdf | 11 Oct 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: E.pdf | 11 Oct 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: E.pdf | 11 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence RERA Eng Cert Jun 2023.pdf | 3 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Form-1_Eminence_2023.pdf | 12 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence RERA Eng Cert MAR 2023.pdf | 8 May 2023 |
| Certificates of CA (Form 3)File: Eminence From 03 Rera Certificate Mar 2023.pdf | 8 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Form-1_Eminence_2023.pdf | 10 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Form-1_Eminence_2022.pdf | 31 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence RERA Eng Cert Dec 2022.pdf | 31 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: P31-MARATHON EMINENCE -Q1-JUN 22-FORM 2a.pdf | 7 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: emienece.pdf | 4 Nov 2022 |
| Certificates of CA (Form 3)File: Eminence Form 3 Rera Certificate Sep 22.pdf | 28 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC_Form 1 Eminence 2022.pdf | 17 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence RERA Eng Cert Sep 22.pdf | 15 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE.pdf | 9 Jul 2022 |
| Certificates of CA (Form 3)File: EMINENCE.pdf | 8 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q1 Eminence.pdf | 7 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence eng cert RERA March 22.pdf | 25 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE.pdf | 19 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: eminence.pdf | 21 Jan 2022 |
| Declaration about Commencement CertificateFile: enbc.pdf | 16 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EMINENCE.pdf | 11 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: EMINENCE FROM 5.pdf | 30 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence Eng Rera Certificate 09082021.pdf | 21 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMINENCE 1 JUL _ 260721.pdf | 7 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: IOA LEETER.pdf | 20 Feb 2021 |
| Proforma of Allotment letterFile: RERA AFS Eminence RERA website clean.pdf | 20 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf | 2 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: eminence NZBL RERA CERTIFICATE - Form5.pdf | 29 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: eminemce 08012020.pdf | 2 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_Marathon Eminence-Dec19.pdf | 2 Jul 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
Keep MARATHON EMINENCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MULUND WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 335 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: NEXZONE BUILDCON LLP
NEXZONE BUILDCON LLP has 2 registrations on MahaRERA, including MARATHON EMINENCE and EKVEERA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MARATHON EMINENCE is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MARATHON EMINENCE?
The registered promoter entity is NEXZONE BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MARATHON EMINENCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MARATHON EMINENCE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in MARATHON EMINENCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback