Completed Litigation declared Residential / Group Housing project

MARATHON EMBLEM-2

By UNITED ENTERPRISES

RG-MH-09714 · RERA P51800000556 · Last updated on MahaRERA portal: 6 Mar 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Staircases, 99%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

MARATHON EMBLEM-2 is a Residential / Group Housing project by UNITED ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000556 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameMARATHON EMBLEM-2
  • TypeResidential / Group Housing
  • Location
    • MULUND GOREGAON LINK ROAD
    • OFF DMART
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000556
  • ReraGenie IDRG-MH-09714

Builder

  • NameUNITED ENTERPRISES
  • Entity typePartnership
  • PartnersSONAL MAYUR SHAH, CHETAN RAMNIKLAL SHAH
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MARATHON EMBLEM-2NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 99%.

MARATHON EMBLEM-2: 45% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities17

As on 6 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
SWIMMING POOLYes25%
FITNESS CENTERYes0%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area524 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2359.37
Proposed, not sanctioned1,859 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRATAP PALACE GROUND FLOOR J N ROAD MULUND WEST MUMBAI 400080

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
UNITED ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003802Dec 2019 → Dec 2020

Reason as filed by the promoterDear sir Please extention my project reason by delay for O.C

Litigation declared1

CaseCourtStatus
844/2016HIGH COURT OF BOMBAYPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Dec 2024

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 June 2017.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Sept 2017.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Dec 2017.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Mar 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 June 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Sept 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Dec 2018.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Mar 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 June 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Sept 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Dec 2019.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem -2 Mar 2020.pdf6 Mar 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Jun 2023.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Sep 2024.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Jun 2024.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Mar 2024.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Dec 2023.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Jun 2023.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Mar 2023.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Dec 2022.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Sep 2022.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Jun 2022.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Mar 2022.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Dec 2021.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Sep 2021.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Jun 2021.pdf31 Jan 2025
Certificates of CA (Form 3)File: Form 3 Ca Cert Emblem 2 Mar 2020.pdf31 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: emblem -2 OC upload.pdf24 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Emblem-2 Form 4 OC.pdf17 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: emblem -2 OC upload.pdf6 Dec 2024
Certificates of CA (Form 3)File: CA Certificate Emblem 2 Mar 2019.pdf6 Nov 2024
Certificates of CA (Form 3)File: CA Certificate Emblem2 Sept-2018.pdf6 Nov 2024
Certificates of CA (Form 3)File: CA Certificate Emblem2 Sept-2018.pdf6 Nov 2024
Certificates of CA (Form 3)File: EMBLEM 2 CA Cert Dec 17.pdf6 Nov 2024
Certificates of CA (Form 3)File: Emblem -2 CA Certi Dec 20.pdf6 Nov 2024
Certificates of CA (Form 3)File: Emblem 2 Rera Certificate Mar 20.pdf6 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY CERTIFICATE.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Emblem-2 Mar-22.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SIGNEDForm 2A - QAC-EMBLEM 2-FY23-24.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Emblem-2 Mar-23.pdf27 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Emblem-2 June 19 to Mar 20.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Emblem-2 June 20 to Mar 21.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Emblem-2 June 21 to Sept 21.pdf22 May 2024
Other - FinanceFile: EMB 2_Form 4.pdf28 Feb 2024
Status of ConveyanceFile: Reply RERA Conveyance notice-Emblem 1 AND 2.pdf13 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: EMBLEM.pdf13 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: EMBLEM 2 FORM 4 U.pdf13 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMBLEM 2 JUL_ 280721.pdf7 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMBLEM 2 MAY _ 210521.pdf7 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: emblem 2.pdf2 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate_Emblem II_Dec 19.pdf26 Feb 2020
Certificates of CA (Form 3)File: Marathon Emblem - Phase 2 Rera Certificate As on Dec 2019.pdf26 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: emblem 2 _09012020.pdf16 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: EMBLEM ANUUVAL REPORT 2019.pdf11 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: EMBLEM 2 _10102019.pdf22 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Emblem II_Sept 19.pdf22 Nov 2019
Certificates of CA (Form 3)File: EMBLEM 2 CA 300902019.pdf22 Nov 2019
Proforma of Allotment letterFile: DRFT AFS Emblem 2.pdf14 Nov 2019
Certificates of CA (Form 5)File: FROM 5 EMBLEM.pdf1 Oct 2019
Certificates of CA (Form 3)File: CA Phase II JULY 2019.pdf5 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: emblem 2 june 2019.pdf2 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Emblem II_June 19.pdf2 Aug 2019
Copy of the legal title reportFile: ADDENDUM TO TITLE REPORT EMBLEM FINAL.pdf5 Jul 2019
Details of encumbrancesFile: NO ENCUMBRANCE CERTIFICATE.pdf5 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: emblem -2.pdf19 Jan 2019
Certificates of CA (Form 5)File: Emblem -2.pdf1 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engineer's Certificate_Emblem II_June 18.pdf8 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate_Emblem II_June 18.pdf8 Aug 2018
Certificates of CA (Form 3)File: Marathon Emblem - Phase 2.pdf8 Aug 2018
Certificates of CA (Form 3)File: Emblem - Phase 2 March 2018.pdf8 Aug 2018
Certificates of CA (Form 3)File: EMBLEM- PHASE 2.pdf8 Aug 2018
Layout approvalFile: 1 LAYOUT.pdf6 Apr 2018
Building plan approvalFile: EM PLAN-2.pdf6 Apr 2018
Copy of Layout Approval (in case of layout)File: 1 LAYOUT.pdf6 Apr 2018
Building Plan Approval (IOD)File: EM PLAN-2.pdf6 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: EM CC.pdf6 Apr 2018
Certificates of CA (Form 3)File: EMBLEM PHASE 2 RERA SEP17.pdf2 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: emblem2.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer's Certificate_Emblem II_Sep 17.pdf27 Oct 2017
Copy of the legal title reportFile: Emblem Title.pdf13 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MARATHON ONYXMARATHON ONYX BEHIND DEVIDAYAL GARDEN DEVIDAYAL ROAD MULUND WEST MUMBAI 40008037CompletedJul 2015Jul 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MARATHON EMBLEM-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OFF DMART6,700+ in Mumbai Suburban

2 kmMARATHON EMBLEM-2Completed 108Lapsed / revoked 79Other 147Dot size: filed unitsN

Filed coordinates, straight-line distance. 334 registered projects within 2 km.

Builder: UNITED ENTERPRISES

UNITED ENTERPRISES has 2 registrations on MahaRERA, including MARATHON EMBLEM-1 and MARATHON EMBLEM-2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MARATHON EMBLEM-2 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MARATHON EMBLEM-2?

The registered promoter entity is UNITED ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MARATHON EMBLEM-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MARATHON EMBLEM-2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in MARATHON EMBLEM-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MARATHON EMBLEM-2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MARATHON EMBLEM-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.