Home / Browse projects / Mumbai Suburban, Maharashtra / MANTRI OUR HOME

Registered No litigation declared Residential / Group Housing project

MANTRI OUR HOME

By PENTAGON PREMISES PRIVATE LIMITED

RG-MH-00058 · RERA P51800051596 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
79 of 117Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

MANTRI OUR HOME is a Residential / Group Housing project by PENTAGON PREMISES PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051596 on 27 Jun 2023. Possession is promised by 31 Mar 2027. 38 of the 117 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameMANTRI OUR HOME
  • TypeResidential / Group Housing
  • Location
    • MUMBAI
    • Ambivali
    • Andheri
    • Mumbai Suburban
    • 400053
  • Pincode400053
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051596
  • ReraGenie IDRG-MH-00058

Builder

  • NamePENTAGON PREMISES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorNILESH NARSING DHAGE
  • Managing DirectorSHASHIKUMAR BALAKRISHNAN NAMBIAR
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed108 files

Current status

32%38 of 117 units booked

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANTRI OUR HOME -ANA181554357
MANTRI OUR HOME -BNA111160060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

MANTRI OUR HOME -A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MANTRI OUR HOME -B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered126
BuildingClosed/CoveredTotal
MANTRI OUR HOME -A7171
MANTRI OUR HOME -B5555

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,799 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 May 2026
LandownerVillageDistrict
PPPL-IMK Premises LLP (Pentagon & IMK Buildcon LLPMumbai CityMumbai City
OUR HOME CHS LTD ( LAND OWNER)Mumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7557.3
Proposed, not sanctioned3,053 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch30 NAVYUGH SOCIETY MEHTA ROAD MUMBAI 400056

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectREZA KABUL ARCHITECTS PVT LTD
EngineerNIKUNJ MURAKA
Chartered AccountantPLBJ & COMPANY
Chartered AccountantVCAN & ASSOCIATES LLP
PartnerRole in project
PENTAGON PREMISES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 -Architect Our Homes - 28-04-26.pdf28 Apr 2026
Form 2File: Form- 2 - Engineer Certificate- Our Home.pdf28 Apr 2026
Form 3File: Form-3 CA Certificate - Our Home.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold 25-26 Qtr 4.pdf28 Apr 2026
Form 1File: Form-1 -Architect Our Homes.pdf23 Jan 2026
Form 2File: Form 2 - Engineer - Our Home.pdf23 Jan 2026
Form 3File: Form-3 -CA Certified - Our Home.pdf23 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold.pdf23 Jan 2026
Form 1File: Form 1 Our Home.pdf10 Jan 2026
Form 2File: Form -2- Our Home.pdf10 Jan 2026
Form 3File: Form 3 CA Certificate.pdf10 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold.pdf10 Jan 2026
Form 5 (FY 2023-2024)File: Form-5-23-24.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Form-5-24-25.pdf20 Nov 2025
Form 1File: Form 1 - Architect Certificate.pdf10 Oct 2025
Form 2File: FORM 2 Engg Certificate.pdf10 Oct 2025
Form 3File: Form 3 -CA Certificate.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold.pdf10 Oct 2025
Form 1File: Form 1 Our Home.pdf9 Oct 2025
Form 2File: FORM 2 - Our Home.pdf9 Oct 2025
Form 3File: FORM-3 CA Certificate.pdf9 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold..pdf9 Oct 2025
Form 1File: Form-1 Architect Certificate.pdf8 Oct 2025
Form 2File: Form- 2 Engineer Certificate.pdf8 Oct 2025
Form 3File: Form- 3 -CA Certificate.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for sold -2nd Qtr.pdf8 Oct 2025
Form 1File: Form-1 Architect Certificate.pdf8 Oct 2025
Form 2File: Form-2- Engineer Certificate.pdf8 Oct 2025
Form 3File: Form- 3 -CA Certificate.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for sold -3rd Qtr.pdf8 Oct 2025
Form 1File: Form-1 Architect Certificate.pdf8 Oct 2025
Form 2File: Form-2- Engineer Certificate.pdf8 Oct 2025
Form 3File: Form-3 CA Certificate.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for sold -4th Qtr.pdf8 Oct 2025
Form 1File: Form-1 Architect Certificate.pdf8 Oct 2025
Form 2File: Form-2- Engineer Certificate.pdf8 Oct 2025
Form 3File: Form-3 CA Certificate.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for sold.pdf8 Oct 2025
Form 1File: Form 1 Architect Certficate.pdf8 Oct 2025
Form 2File: Form-2-Engineer Certificate.pdf8 Oct 2025
Form 3File: Form-3 Our Home.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for sold.pdf8 Oct 2025
Form 1File: Form 1 Architect Certficate.pdf8 Oct 2025
Form 2File: Form-2.pdf8 Oct 2025
Form 3File: Form-3 Our Home.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure for sold (1).pdf8 Oct 2025
Form 1File: Form-1 Architect Certificate.pdf6 Oct 2025
Form 2File: Form- 2 Engineer Certificate.pdf6 Oct 2025
Form 3File: Form-3 CA Certificate.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold.pdf6 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Certificat.pdf3 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Latter - Aditya Birla.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Our Home.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 New.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Nov-24.pdf12 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure - Secured Loan.pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Our Home.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Our Home.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2- Our Home Engineer Certificate.pdf5 Jul 2024
Building plan approvalFile: Plan-1.pdf25 Jun 2024
Building plan approvalFile: Plan-2.pdf25 Jun 2024
Building plan approvalFile: Plan-3 new.pdf25 Jun 2024
Building plan approvalFile: Plan-4.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-1.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-2.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-3 new.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-4.pdf25 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Revise Commencement Certificate -Our Home.pdf18 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecht- Our Homes .pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Our Home Engineer Certificate.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificat.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Sep 25, 2023 4-05 PM.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3.pdf19 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation -Agreement to Sale.pdf13 Jun 2023
Proforma of Agreement for saleFile: Agreement to Sale.pdf2 Jun 2023
Other - LegalFile: Deviation -Agreement to Sale.pdf2 Jun 2023
Layout approvalFile: Layout Plan with highlighted.pdf26 May 2023
Copy of the legal title reportFile: Legal Title - RERA With owner name.pdf26 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MANTRI SUJATA82 1D CTS NO 169 4 SANTACRUZ WEST MUMBAI 5425CompletedDec 2016Dec 2016

How this compares with Mumbai Suburban

32%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRI OUR HOME on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBAI6,700+ in Mumbai Suburban

2 kmMANTRI OUR HOMECompleted 154Lapsed / revoked 83Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 378 registered projects within 2 km.

Builder: PENTAGON PREMISES PRIVATE LIMITED

PENTAGON PREMISES PRIVATE LIMITED has 3 registrations on MahaRERA, including MANTRI PARIJAT and MANTRI OUR HOME. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MANTRI OUR HOME is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRI OUR HOME?

The registered promoter entity is PENTAGON PREMISES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRI OUR HOME?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANTRI OUR HOME?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRI OUR HOME?

The professionals named in the filing: Architect: REZA KABUL ARCHITECTS PVT LTD; Engineer: NIKUNJ MURAKA; Chartered Accountant: PLBJ & COMPANY; Chartered Accountant: VCAN & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRI OUR HOME?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRI OUR HOME. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRI OUR HOME to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.