Home / Browse projects / MANTRA MONTANA PHASE 7

Completed No litigation declared Residential / Group Housing project

MANTRA MONTANA PHASE 7

By A PLUS DESIGN HOUSE LLP

RG-MH-17486 · RERA P52100029093 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
1Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

MANTRA MONTANA PHASE 7 is a Residential / Group Housing project by A PLUS DESIGN HOUSE LLP in DHANORI, 411015, registered with MahaRERA as P52100029093 on 26 Apr 2021. The registration is recorded completed; possession was promised by 30 Jun 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMANTRA MONTANA PHASE 7
  • TypeResidential / Group Housing
  • Location
    • DHANORI
    • 411015
  • Pincode411015
  • RERA no.P52100029093
  • ReraGenie IDRG-MH-17486

Builder

  • NameA PLUS DESIGN HOUSE LLP
  • Entity typePartnership
  • PartnersMANTRA PROPERTIES AND DEVELOPERS PRIVATE LOMITED THROUGH DIRECTOR ROHIT GHANSHYAM GUPT, ASHISH SATISH GUPTA
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredApr 2021PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Apr 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANTRA MONTANA B4NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

MANTRA MONTANA B4: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,113 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5417.19
Proposed, not sanctioned5,417 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA design studio
EngineerDesign werkz
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
A PLUS DESIGN HOUSE LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000279880ANTARYAMI SAHUA PLUS DESIGN HOUSE LLP19/12/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jan 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MONTANA PH 7.pdf27 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B3 B4 B5 and part MHADA OCC 07112023.pdf12 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 7.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 7.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 7.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Phase 7.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 7.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: A Plus_Phase 7_17-18 to 20-21.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: A Plus_Phase 7_17-18 to 20-21.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A Plus_Phase 7_17-18 to 20-21.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A Plus_Phase 7_17-18 to 20-21.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Montana_FORM 5_Phase 7.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 7.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 7.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 7.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 7.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 7.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MONTANA PH 7.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE7_compressed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 7.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 7.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 7.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 7.pdf23 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation Ph 7.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT Ph 7.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 7.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 7.PDF18 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 7.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PH 7.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Montana_Phase 7.pdf6 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 7.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE7_compressed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: A Plus Phase 7.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 7_B4.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ph 7.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE7_compressed.pdf27 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE7_compressed.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect A Plus_ Phase 7- B4.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng A plus_Phase 7_B4.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PH7_B4.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ENG CERT_PH7_B4.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG_CERT_Ph 7_B4 Wing.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH7_B4.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE7_compressed_compressed.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3589_001.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG_PHASE7__compressed.pdf8 Jan 2022
CERSAI detailsFile: CERSAI_REPORT.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: PH 7_compressed (1).pdf8 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph 7_compressed.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph 7.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Engineers certificate Montana B4 building.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Montana B4 Building.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for RERA Montana Phase 7_compressed.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for RERA Montana Phase 7_compressed.pdf6 Oct 2021
Declaration about Commencement CertificateFile: A PLUS.pdf4 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: B4 phase 7.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: B4 phase 7.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: A Plus Ph 6.pdf27 Jul 2021
Copy of the legal title reportFile: Legal Title Report.pdf22 Apr 2021
Copy of the legal title reportFile: Annexure A.pdf22 Apr 2021
Copy of the legal title reportFile: Annexure B.pdf22 Apr 2021
Proforma of Allotment letterFile: B4 ATS-compressed.pdf16 Apr 2021
Proforma of Allotment letterFile: Allotment letterrevised.pdf15 Apr 2021
Layout approvalFile: Approved Layout Plan_compressed.pdf8 Apr 2021
Building plan approvalFile: aPPROVED BUILDING PLAN PAGE 1.pdf8 Apr 2021
Copy of Layout Approval (in case of layout)File: Approved Layout Plan_compressed.pdf8 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: aPPROVED BUILDING PLAN PAGE 1.pdf8 Apr 2021
Building plan approvalFile: Dhanori 7 -Layout Plan.pdf2 Apr 2021
PAN CardFile: PAN.pdf2 Apr 2021
Details of encumbrancesFile: Dclaration Encumb.pdf2 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Dhanori 7 -Layout Plan.pdf2 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Apr 2021
Declaration in FORM BFile: Form B Affidavit Cum Declaration Mantra Montana.pdf2 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf2 Apr 2021

Keep MANTRA MONTANA PHASE 7 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

Builder: A PLUS DESIGN HOUSE LLP

A PLUS DESIGN HOUSE LLP has 10 registrations on MahaRERA, including MANTRA MONTANA PHASE 1 and MANTRA MONTANA PHASE 2. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if MANTRA MONTANA PHASE 7 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA MONTANA PHASE 7?

The registered promoter entity is A PLUS DESIGN HOUSE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA MONTANA PHASE 7?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANTRA MONTANA PHASE 7?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANTRA MONTANA PHASE 7?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA MONTANA PHASE 7?

The professionals named in the filing: Architect: A design studio; Engineer: Design werkz; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA MONTANA PHASE 7?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA MONTANA PHASE 7. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA MONTANA PHASE 7 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.