Home / Browse projects / MANTRA MONTANA PHASE 6

Completed No litigation declared Residential / Group Housing project

MANTRA MONTANA PHASE 6

By A PLUS DESIGN HOUSE LLP

RG-MH-16478 · RERA P52100026070 · Last updated on MahaRERA portal: 12 Jan 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: .
Nov 2024Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

MANTRA MONTANA PHASE 6 is a Residential / Group Housing project by A PLUS DESIGN HOUSE LLP in DHANORI, 411015, registered with MahaRERA as P52100026070 on 15 Aug 2020. The registration is recorded completed; possession was promised by 30 Nov 2024.

At a glance

Project

  • NameMANTRA MONTANA PHASE 6
  • TypeResidential / Group Housing
  • Location
    • DHANORI
    • 411015
  • Pincode411015
  • RERA no.P52100026070
  • ReraGenie IDRG-MH-16478

Builder

  • NameA PLUS DESIGN HOUSE LLP
  • Entity typePartnership
  • PartnersMANTRA PROPERTIES AND DEVELOPERS PRIVATE LOMITED THROUGH DIRECTOR ROHIT GHANSHYAM GUPT, ASHISH SATISH GUPTA
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredAug 2020PromisedNov 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Aug 2020
  • Promised completion30 Nov 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B3NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

BUILDING B3: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 12 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,382 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5415.45
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSENAPATI BAPAT ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAdvantage architects
EngineerRajesh Mankani Design Werks
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
A PLUS DESIGN HOUSE LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jan 2024

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B3 B4 B5 and part MHADA OCC 07112023.pdf12 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 6.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 6.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 6.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Phase 6.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 6.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: A Plus_Phase 6_17-18,18-19.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: A Plus_Phase 6_17-18,18-19.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Montana_FORM 5_Phase 6.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 6.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 6.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 6.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 6.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MONTANA PH 6.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE6_compressed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 6.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 6.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 6.pdf23 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation Ph 6.pdf20 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 6.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 6.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PH 6.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Montana_Phase 6.pdf6 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 6.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE6_compressed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: A Plus Phase 6.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 6_B3.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ph 6.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE6_compressed.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect A plus_Phase 6_B3_Arch.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng A plus_Phase 6_B3.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PH6_B3.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ENG CERT_PH6_B3.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ENG CERT_PH6_B3.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG_CERT_Ph 6_B3 Wing.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH6_B3.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH6_B3.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MONTANA_PHASE6_compressed_compressed.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3588_001.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG_PHASE6_.pdf8 Jan 2022
CERSAI detailsFile: CERSAI_REPORT.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: PH 6.pdf8 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph 6_compressed.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph 6.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Engineers Certificate montana B3 building.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Montana B3 Building.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for RERA Montana Phase 6_compressed.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A plus phase 5 19-20.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A plus phase 5 20-21.pdf6 Oct 2021
Declaration about Commencement CertificateFile: A PLUS.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE PH 6 APLUS.PDF18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Montana phase 6 B3.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Montana phase 6 B3.pdf18 Aug 2021
Disclosure of sold/ booked inventoryFile: A Plus Ph 6.pdf27 Jul 2021
Details of encumbrancesFile: Dclaration Encumb.pdf5 Jul 2021
Disclosure of sold/ booked inventoryFile: M Montana Ph 6.pdf2 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for RERA Montana Phase 6.pdf11 Dec 2020
Building plan approvalFile: B3_compressed.pdf16 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: B3_compressed.pdf16 Sep 2020
Building plan approvalFile: compressed1.pdf10 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: compressed1.pdf10 Aug 2020
Layout approvalFile: layout_compressed1.pdf6 Aug 2020
PAN CardFile: pan.pdf6 Aug 2020
Copy of the legal title reportFile: lEGAL TITLE.pdf6 Aug 2020
Details of encumbrancesFile: DECLARATION.pdf6 Aug 2020
Copy of Layout Approval (in case of layout)File: layout_compressed1.pdf6 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf6 Aug 2020
Declaration in FORM BFile: Form B Mantra Montana Phase 6_compressed.pdf6 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate Montana Phase 6.pdf6 Aug 2020
Proforma of Allotment letterFile: Allotment.pdf6 Aug 2020
Proforma of Allotment letterFile: declaration for ATS.pdf6 Aug 2020

Keep MANTRA MONTANA PHASE 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

Builder: A PLUS DESIGN HOUSE LLP

A PLUS DESIGN HOUSE LLP has 10 registrations on MahaRERA, including MANTRA MONTANA PHASE 1 and MANTRA MONTANA PHASE 2. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if MANTRA MONTANA PHASE 6 is delayed beyond 30 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA MONTANA PHASE 6?

The registered promoter entity is A PLUS DESIGN HOUSE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA MONTANA PHASE 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANTRA MONTANA PHASE 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA MONTANA PHASE 6?

The professionals named in the filing: Architect: Advantage architects; Engineer: Rajesh Mankani Design Werks; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA MONTANA PHASE 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA MONTANA PHASE 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA MONTANA PHASE 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.