Completed No litigation declared Residential / Group Housing project

MANTRA MONTANA PHASE 2

By A PLUS DESIGN HOUSE LLP

RG-MH-03457 · RERA P52100020955 · Last updated on MahaRERA portal: 20 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: .
Dec 2024Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

MANTRA MONTANA PHASE 2 is a Residential / Group Housing project by A PLUS DESIGN HOUSE LLP in DHANORI, 411015, registered with MahaRERA as P52100020955 on 27 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameMANTRA MONTANA PHASE 2
  • TypeResidential / Group Housing
  • Location
    • DHANORI
    • 411015
  • Pincode411015
  • RERA no.P52100020955
  • ReraGenie IDRG-MH-03457

Builder

  • NameA PLUS DESIGN HOUSE LLP
  • Entity typePartnership
  • PartnersMANTRA PROPERTIES AND DEVELOPERS PRIVATE LOMITED THROUGH DIRECTOR ROHIT GHANSHYAM GUPT, ASHISH SATISH GUPTA
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects9 →

Key dates

this monthRegisteredMay 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 May 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B7NA160000
BUILDING B8NA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

BUILDING B798%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
BUILDING B897%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities16

As on 20 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingYes0%
OTHERYes95%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered2
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
BUILDING B711011
BUILDING B811011

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,935 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8580.0
Proposed, not sanctioned8,580 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS NO 93 BY B, PLOT NO 8, SENAPATI BAPAT RD PIN 411016

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA DESIGN STUDIO
Chartered AccountantCA Avtarsingh H Saini
PartnerRole in project
A PLUS DESIGN HOUSE LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Aug 2023

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: A Plus_Phase 2_17-18, 18-19.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: A Plus_Phase 2_17-18, 18-19.pdf20 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Montana_FORM 5_Phase 2.pdf29 Aug 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Mantra Montana.pdf12 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Ph 2.pdf12 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 2.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf20 Jul 2023
Certificates of CA (Form 3)File: CA Cert Ph 2.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf17 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: MONTANA PH 2.pdf20 Apr 2023
Certificates of CA (Form 3)File: CA Certificate_MONTANA_PHASE2_compressed.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 2.pdf23 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Phase 2 Completion Cert.pdf20 Mar 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation Ph 2.pdf20 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 2.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 2.pdf18 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf18 Jan 2023
Certificates of CA (Form 3)File: CA CERT PH 2.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Montana_Phase 2.pdf6 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 2.pdf20 Oct 2022
Certificates of CA (Form 3)File: CA Certificate_MONTANA_PHASE2_compressed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: A Plus Phase 2.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 2_B7-B8.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_ph 2.pdf19 Oct 2022
Certificates of CA (Form 3)File: CA Certificate_MONTANA_PHASE2_compressed.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect A Plus_Phase 2 _B7 - B8.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng A Plus_Phase 2_B7, B8.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PH2_B7-B8.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ENG CERT_PH2_B7, B8.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG_CERT_Ph 2.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH2_B7-B8.pdf7 Apr 2022
Certificates of CA (Form 3)File: CA Certificate_MONTANA_PHASE2_compressed_compressed.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3584_001.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A_ENG_PHASE2_.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG_PHASE2_.pdf8 Jan 2022
CERSAI detailsFile: CERSAI_REPORT.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: PH 2_compressed.pdf8 Jan 2022
Certificates of CA (Form 3)File: ph 2_compressed (2).pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph 2.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera Engineers Certificate Montana B7B8 PH2.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Montana B7B8.pdf6 Oct 2021
Certificates of CA (Form 3)File: CA Certificate for RERA Montana Phase 2_compressed (1).pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A plus phase 2 19-20.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A plus phase 2 20-21.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: A plus phase 2 20-21.pdf6 Oct 2021
Declaration about Commencement CertificateFile: A PLUS.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PH 2 APLUS.PDF17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Montana phase 2 B7-B8.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Montana phase 2 B7-B8.pdf17 Aug 2021
Disclosure of sold/ booked inventoryFile: A plus Ph 2_compressed.pdf27 Jul 2021
Details of encumbrancesFile: Dclaration Encumb.pdf5 Jul 2021
Disclosure of sold/ booked inventoryFile: M Montana Ph 2_compressed.pdf2 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Montana Phase-02.pdf11 Dec 2020
Certificates of CA (Form 3)File: CA Certificate for RERA Montana Phase 2.pdf11 Dec 2020
Building plan approvalFile: B-7_compressed.pdf16 Sep 2020
Building plan approvalFile: B-8_compressed.pdf16 Sep 2020
Building Plan Approval (IOD)File: B-7_compressed.pdf16 Sep 2020
Building Plan Approval (IOD)File: B-8_compressed.pdf16 Sep 2020
Layout approvalFile: LAYOUT.pdf7 Apr 2020
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf7 Apr 2020
Building plan approvalFile: PROPOSED_B7.pdf26 Dec 2019
Building plan approvalFile: PROPOSED_B8.pdf26 Dec 2019
Building Plan Approval (IOD)File: PROPOSED_B7.pdf26 Dec 2019
Building Plan Approval (IOD)File: PROPOSED_B8.pdf26 Dec 2019
Building plan approvalFile: PLAN 1.pdf22 May 2019
Building plan approvalFile: PLAN 2.pdf22 May 2019
Building plan approvalFile: PLAN 3.pdf22 May 2019
Building plan approvalFile: PLAN 4.pdf22 May 2019
Copy of the legal title reportFile: Title And Search Report Dhanoricompressed.pdf22 May 2019
Building Plan Approval (IOD)File: PLAN 1.pdf22 May 2019
Building Plan Approval (IOD)File: PLAN 2.pdf22 May 2019
Building Plan Approval (IOD)File: PLAN 3.pdf22 May 2019
Building Plan Approval (IOD)File: PLAN 4.pdf22 May 2019
Layout approvalFile: LAYOUT SANCTION-compressed-min (1).pdf15 Feb 2019
PAN CardFile: A Plus pan card.pdf15 Feb 2019

Keep MANTRA MONTANA PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHANORI

Builder: A PLUS DESIGN HOUSE LLP

A PLUS DESIGN HOUSE LLP has 10 registrations on MahaRERA, including MANTRA MONTANA PHASE 1 and MANTRA MONTANA PHASE 2. Its filings disclose 9 earlier MahaRERA projects: declares 9 of 9 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if MANTRA MONTANA PHASE 2 is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA MONTANA PHASE 2?

The registered promoter entity is A PLUS DESIGN HOUSE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA MONTANA PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANTRA MONTANA PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA MONTANA PHASE 2?

The professionals named in the filing: Architect: A DESIGN STUDIO; Chartered Accountant: CA Avtarsingh H Saini. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA MONTANA PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA MONTANA PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA MONTANA PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.