Home / Browse projects / Pune, Maharashtra / Mantra Mirari Phase 3

Registration lapsed No litigation declared Residential / Group Housing project

Mantra Mirari Phase 3

By MANTRA RESIDENCES MUNDHWA PRIVATE LIMITED

RG-MH-83928 · RERA P52100049704 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • 1 complaint at MahaRERA
  • Rs 140.00 crore secured on the land, in favour of Bajaj Housing Finance Limited, Bajaj Housing Finance Ltd

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
6 of 11Construction stages donefurthest along: Staircases, 99%
54 of 126Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 153 documents Report an error

Mantra Mirari Phase 3 is a Residential / Group Housing project by MANTRA RESIDENCES MUNDHWA PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100049704 on 22 Feb 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 72 of the 126 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMantra Mirari Phase 3
  • TypeResidential / Group Housing
  • Location
    • MUNDHWA
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049704
  • ReraGenie IDRG-MH-83928

Builder

  • NameMANTRA RESIDENCES MUNDHWA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsROHIT GHANSHYAM GUPTA, ASHISH SATISH GUPTA
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live3 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredFeb 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Feb 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed153 files

Current status

57%72 of 126 units booked
97.1%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING E1 - ENA25211260126

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 99%.

BUILDING E1 - E: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes98%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes99%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes98%

Parking filed175

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots175
Closed/Covered175

Land and ownership43

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,402 sq m
Land owned byThe promoter, with other names on the file
Named landowners43
Encumbrance on the landDeclared present
Charge in favour ofBajaj Housing Finance Limited, Bajaj Housing Finance Ltd
Secured amountRs 140.00 crore
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
Suvarna Bhagwan ShewateGaradePune
Vasant Laxman KachareMundhawaPune
Ramesh Laxman KachareMundhawaPune
Vinod Laxman KachareMundhawaPune
Lilabai Kisan BankarGhorpadiPune
Nitin Kisan BankarGhorpadiPune
Swati Kisan BankarGhorpadiPune
Jyoti Kisan BankarGhorpadiPune
Nilesh Bhimrao BankarGhorpadiPune
Yogesh Bhimrao BankarGhorpadiPune
Shital Bhimrao BankarGhorpadiPune
Kalpana Arjun BankarGhorpadiPune
Sangita Prashant JagtapBaramati RuralPune
Neelam Milind KudaleAkluj (CT)Solapur
Nikita Shivaji FarandeGhorpadiPune
Pandurang Ramchandra BankarGhorpadiPune
Shraddha Pandurang BankarGhorpadiPune
Kartiki Pandurang BankarGhorpadiPune
Jogeshwari Pandurang BankarGhorpadiPune
Kunda Pandurang BankarGhorpadiPune
Suresh Ramchandra BankarGhorpadiPune
Dhanavi Suresh BankarGhorpadiPune
Raghvendra Suresh BankarGhorpadiPune
Mukti Suresh BankarGhorpadiPune
Sarita Suresh ChaughuleGhorpadiPune
Rushikesh Rajesh ChoughuleGhorpadiPune
Ranjana Vasant KachareMundhawaPune
Viraj Vasant KachareMundhawaPune
CHAITRALI VIRAJ KACHAREMundhawaPune
SAYALI ASHISH DALAVIMundhawaPune
SHEETAL SANJAY SATAVMundhawaPune
SHILPA MANIK BHUMKARMundhawaPune
ALKA LAXMAN KACHAREMundhawaPune
ATUL RAMESH KACHAREMundhawaPune
SHEETAL ATUL KACHAREMundhawaPune
VAISHALI VINAYAK BANKARMundhawaPune
VAISHALI MANDAR PUNDLIKMundhawaPune
HARSHADA DEEPAK KODREMundhawaPune
SWATI PRATISH KACHAREMundhawaPune
HARSHADA VINOD KACHAREMundhawaPune
PRATISH VINOD KACHAREMundhawaPune
NILESH BHAGWAN SHEWATEGaradePune
NILIMA VITTHAL KEDARIGaradePune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI20850.7
Proposed, not sanctioned20,271 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Floor Shop No 1 Gera Grand Society Near Vrindawan Garden T P No 438 Pune MH 411037
Estimated costRs 65.08 cr
Cost incurredRs 63.20 cr
Work done97.11%
BuildingWingEstimatedIncurred
BUILDING E1 - ENARs 39.05 crRs 38.24 cr
-NARs 26.03 crRs 24.96 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMitesh Sidhpura & Associates
EngineerHemant Nimbalkar
EngineerRavi Rawal
Chartered AccountantCA Avtarsingh H Saini
Chartered AccountantBansal Garg and Associates
Chartered AccountantAniket Garg and Company
PartnerRole in project
MANTRA RESIDENCES MUNDHWA PRIVATE LIMITED-

Litigation declared6

CaseCourtStatus
RCS NO 1692/2007/2022CJSD COURT PUNEKEPT FOR HEARING
AO NO 351/2022 AND IA/2445/2022/2022HIGH COURTOUT OF COURT SETTLEMENT DONE
AO 249/2022 AND IA 2452/2022/2022HIGH COURTOUT OF COURT SETTLEMENT DONE
AO NO 352/2022 AND IA/2452/2022/2022HIGH COURTOUT OF COURT SETTLEMENT DONE
SCS NO 1706/2021/2021CIVIL JUDGE SENIOR DIVISION PUNEOUT OF COURT SETTLEMENT DONE
SCS NO 1708/2021/2021CIVIL JUDGE SENIOR DIVISION PUNEOUT OF COURT SETTLEMENT DONE

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602230MANTRA RESIDENCES MUNDHWA PRIVATE LIMITEDSonali Parikh16/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed153

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Mirari Phase 3.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 Mirari Phase 3.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 Mirari Phase 3.pdf7 May 2026
Withdrawal Update Form 1File: Form 1 Phase 3_signed.pdf28 Jan 2026
Withdrawal Update Form 2File: Form 2 Phase 3_signed.pdf28 Jan 2026
Withdrawal Update Form 3File: Form 3 Phase 3_signed.pdf28 Jan 2026
Withdrawal Update Form 1File: Mirari Phase 3 Form 1.pdf9 Dec 2025
Withdrawal Update Form 2File: Mirari Phase 3 Form 2.pdf9 Dec 2025
Withdrawal Update Form 3File: Mirari Phase 3 Form 3_compressed.pdf9 Dec 2025
Form 2A (FY 2024-2025)File: Mirari Phase 3 Form 2A 2025.pdf9 Dec 2025
Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (2).pdf9 Sep 2025
Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf9 Sep 2025
Form 5 (FY 2024-2025)File: Mirari Phase 3 Form 5.pdf6 Aug 2025
Withdrawal Update Form 1File: Architect Phase 3.pdf19 Jul 2025
Withdrawal Update Form 2File: Engineer Phase 3.pdf19 Jul 2025
Withdrawal Update Form 3File: CA Phase 3.pdf19 Jul 2025
Form 5 (FY 2023-2024)File: mirari ph 3.pdf15 Jul 2025
Form 1File: Archi Ph 3.pdf11 Jun 2025
Form 2File: Engi Ph 3.pdf11 Jun 2025
Form 3File: CA Certificate_MANTRA_MIRARI_Phase_3.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 3.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Mantra Mirari Ph 3.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Ph 3.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MANTRA_MIRARI_Phase_3_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Ph 3.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3_compressed (3).pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mirari Ph 3.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mirari Phase 3 Revised March 2025 1.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Ph 3.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Ph 3.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3.pdf20 Jan 2025
Details of encumbrances concerned to FinanceFile: Declaration encumbrances Mirari-3.pdf10 Jan 2025
Details of encumbrances concerned to LegalFile: Declaration encumbrances Mirari-3.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: mirari ph 3.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_MANTRA_Mirari_Phase_3_compressed.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ph 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Phase 3.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 mirari ph 3.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mirari form 1 ph 3.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: mirari form 2 ph 3 (1).pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD MIRARI PH 3.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Ph-3.pdf18 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 3.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Eng Cert Ph 3.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ph 3.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ph 3.pdf14 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ph 3.pdf14 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert.pdf10 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf10 Apr 2024
Layout approvalFile: SEAT NO1_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 2_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 3_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 4_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 5_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 6_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 7_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 8_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 9_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 10_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 11_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 12_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 13_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 14_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 15_compressed.pdf21 Mar 2024
Layout approvalFile: SEAT NO 16_compressed.pdf21 Mar 2024
Building plan approvalFile: SEAT NO 17_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO1_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 5_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 6_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 9_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 10_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 13_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 14_compressed.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: SEAT NO 16_compressed.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SEAT NO 2_compressed.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SEAT NO 3_compressed.pdf21 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: SEAT NO 4_compressed.pdf21 Mar 2024

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mantra Mirari Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNDHWA13,700+ in Pune

2 kmMantra Mirari Phase 3Completed 24Lapsed / revoked 18Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 145 registered projects within 2 km.

Builder: MANTRA RESIDENCES MUNDHWA PRIVATE LIMITED

MANTRA RESIDENCES MUNDHWA PRIVATE LIMITED has 4 registrations on MahaRERA, including MANTRA MIRARI PHASE 1 and MANTRA BUSINESS CENTRE MUNDHWA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Mantra Mirari Phase 3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Mantra Mirari Phase 3 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mantra Mirari Phase 3?

The registered promoter entity is MANTRA RESIDENCES MUNDHWA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mantra Mirari Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mantra Mirari Phase 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mantra Mirari Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mantra Mirari Phase 3?

The professionals named in the filing: Architect: Mitesh Sidhpura & Associates; Engineer: Hemant Nimbalkar; Engineer: Ravi Rawal; Chartered Accountant: CA Avtarsingh H Saini; Chartered Accountant: Bansal Garg and Associates; Chartered Accountant: Aniket Garg and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mantra Mirari Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mantra Mirari Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mantra Mirari Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.