Home / Browse projects / Pune, Maharashtra / MANTRA INSIGNIA PHASE 3 RESIDENCIAL

Completed No litigation declared Residential / Group Housing project

MANTRA INSIGNIA PHASE 3 RESIDENCIAL

By MANTRA INSIGNIA LLP

RG-MH-16669 · RERA P52100026580 · Last updated on MahaRERA portal: 27 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
1Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

MANTRA INSIGNIA PHASE 3 RESIDENCIAL is a Residential / Group Housing project by MANTRA INSIGNIA LLP in Pune, Maharashtra, registered with MahaRERA as P52100026580 on 6 Oct 2020. The registration is recorded completed; possession was promised by 30 Jun 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMANTRA INSIGNIA PHASE 3 RESIDENCIAL
  • TypeResidential / Group Housing
  • Location
    • MUNDWA
    • Keshavnagar-Mundwa
    • Pune City
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100026580
  • ReraGenie IDRG-MH-16669

Builder

  • NameMANTRA INSIGNIA LLP
  • Entity typePartnership
  • PartnersMANTRA PROPERTIES AND DEVELOPERS PRIVATE LIMITED THROUGH ITS DIRECTOR ROHIT GHANSHYAM GUPTA, ASHISH SATISH GUPTA
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredOct 2020PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Oct 2020
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ENA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

BUILDING E: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 27 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered40
Open Space33

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,773 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
MOTOSHREE MALKAI COOPERATIVE SOCIETYMundhawaPune
ASHOK SHIVAJIRAO BHOSALEMundhawaPune
KASHINATH SHIVAJIRAO BHOSALEMundhawaPune
BHALCHADRA SHIVAJIRAO BHOSALEMundhawaPune
SUNITA VITTHAL JADHAVPimpale GuravPune
SULOCHANA DAGDU JADHAVMundhawaPune

Approvals and building plan

Permissible FSI5778.45
Proposed, not sanctioned5,778 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSENAPATI BAPAT ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITESH SIDHPURA & ASSOCIATES
EngineerDESIGN WERKZ
Chartered AccountantSHRUTI AGARWAL
PartnerRole in project
MANTRA INSIGNIA LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12502004SANDEEP DEEPAKRAO DESHMUKHMANTRA INSIGNIA LLP19/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Apr 2024

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: insignia ph 3 residential.pdf27 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY CERTIFICATE E wing.pdf16 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Phase 3_E Res.pdf16 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc Cert Ph 3.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 3.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 3.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Eng Cert Ph 3.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 3.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Insignia_Phase 3_17-18 to 19-20.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Insignia_Phase 3_17-18 to 19-20.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Insignia_Phase 3_17-18 to 19-20.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Insignia_20-21_FORM 5.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Insignia_Phase 3 Resi_FORM 5.pdf29 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Ph 3.pdf3 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ph 3.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 3.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 3.pdf17 Jul 2023
CERSAI detailsFile: CERSAI Search Report Mantra Insignia.pdf18 May 2023
Details of encumbrancesFile: Insignia_Phase 3_Finance encumbrances.pdf15 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: MANTRA INSIGNIA PH.pdf24 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: INSIGNIA PH 3.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Insignia Ph 3.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Ph 3.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Ph 3.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert Ph 3.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration Ph 3 Resi.pdf21 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Insignia_Phase III Resi.pdf6 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Cert Ph 3.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mantra Insignia Ph 3.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Ph 3.pdf17 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold unsold_Ph 3.pdf13 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert phase 3E res.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARC CERT_PH3.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENG CERT_PH3_final.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_ENG CERT_Phase 3.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD_UNSOLD_PH3_E BUILDING_compressed.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_CA CERT_PH3_compressed.pdf7 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_PH3.pdf8 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG_PH3.pdf8 Jan 2022
CERSAI detailsFile: INSIGNIA_CERSAI.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_PH2_E_BUIL.pdf8 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: phase 3 E bldg_compressed.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Certificates E wing ENGINEERING.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Insignia E Wing.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: phase 3_compressed.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: phase 3 residencial_compressed.pdf6 Oct 2021
Declaration about Commencement CertificateFile: INSIGNIA.pdf4 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ph 3 architect.pdf19 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rere Certificate E Bldg eng.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Insignia phase 2 E wing.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Insignia phase 2 E wing.pdf19 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: INSIGNIA PH 3 CA Certificate_compressed.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: Insignia Phase 3 res.pdf27 Jul 2021
Disclosure of sold/ booked inventoryFile: Mantra Insignia LLP PH 3.pdf18 Jun 2021
Layout approvalFile: Layout Plan.pdf26 Sep 2020
Building plan approvalFile: Layout Plan.pdf26 Sep 2020
PAN CardFile: PAN.pdf26 Sep 2020
PAN CardFile: PAN.pdf26 Sep 2020
Copy of the legal title reportFile: Latest Additional Search report.pdf26 Sep 2020
Details of encumbrancesFile: DECLARATION.pdf26 Sep 2020
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf26 Sep 2020
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan.pdf26 Sep 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Insignia.pdf26 Sep 2020
Declaration in FORM BFile: FORM B PROMOTOR .pdf26 Sep 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE .pdf26 Sep 2020
Proforma of Allotment letterFile: ATS.pdf26 Sep 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANTRA INSIGNIA PHASE 3 RESIDENCIAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUNDWA13,700+ in Pune

Builder: MANTRA INSIGNIA LLP

MANTRA INSIGNIA LLP has 5 registrations on MahaRERA, including MANTRA INSIGNIA and MANTRA INSIGNIA COMMERCIAL PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANTRA INSIGNIA PHASE 3 RESIDENCIAL is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANTRA INSIGNIA PHASE 3 RESIDENCIAL?

The registered promoter entity is MANTRA INSIGNIA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANTRA INSIGNIA PHASE 3 RESIDENCIAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MANTRA INSIGNIA PHASE 3 RESIDENCIAL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MANTRA INSIGNIA PHASE 3 RESIDENCIAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANTRA INSIGNIA PHASE 3 RESIDENCIAL?

The professionals named in the filing: Architect: MITESH SIDHPURA & ASSOCIATES; Engineer: DESIGN WERKZ; Chartered Accountant: SHRUTI AGARWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANTRA INSIGNIA PHASE 3 RESIDENCIAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANTRA INSIGNIA PHASE 3 RESIDENCIAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANTRA INSIGNIA PHASE 3 RESIDENCIAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.