Home / Browse projects / Thane, Maharashtra / MANGESHI DAZZLE II

Registered No litigation declared Residential / Group Housing project

MANGESHI DAZZLE II

By KALYAN DEVELOPMENT CORPORATION

RG-MH-14494 · RERA P51700024511 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 60.00 crore secured on the land, in favour of BAJAJ HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 12 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
18 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 90%
338 of 391Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

MANGESHI DAZZLE II is a Residential / Group Housing project by KALYAN DEVELOPMENT CORPORATION in Thane, Maharashtra, registered with MahaRERA as P51700024511 on 18 Feb 2020. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 53 of the 391 units on this registration are recorded sold or booked, and 18 of 44 construction stages are filed complete.

At a glance

Project

  • NameMANGESHI DAZZLE II
  • TypeResidential / Group Housing
  • Location
    • 90 FEET ROAD
    • THAKURLI E
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024511
  • ReraGenie IDRG-MH-14494

Builder

  • NameKALYAN DEVELOPMENT CORPORATION
  • Entity typePartnership
  • PartnersMANGESH DASHRATH GAIKAR, DHIRAJLAL SHIVAJI THAKKAR
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects12 →

Key dates

this monthRegisteredFeb 2020First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2020
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 30 Dec 2028)
  • Buildings4 building records
  • Documents filed48 files

Current status

14%53 of 391 units booked
10.9%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1NA141431811329
B-1NA22202
C-1NA141456460
Building 4NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 90%.

A-115%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C-182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Open Space25
BuildingOpen SpaceTotal
A-11313
B-122
C-11010

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,446 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofBAJAJ HOUSING FINANCE LIMITED
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on22 Jun 2026
LandownerVillageDistrict
Madhukar N PatilDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI10262.13
Proposed, not sanctioned10,262 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAGRA ROAD, SHIVAJI CHOWK, KALYAN W
Estimated costRs 154.06 cr
Cost incurredRs 16.79 cr
Work done10.9%
BuildingWingEstimatedIncurred
A-1NARs 51.35 crRs 5.60 cr
B-1NARs 51.35 crRs 5.60 cr
C-1NARs 51.35 crRs 5.60 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRACHANA SHILP
ArchitectSpace Insight
EngineerDipali Patil
EngineerPratik Patil
Chartered AccountantINS AND ASSOCIATES
Chartered AccountantKirti Shah
Chartered AccountantSANGHAVI AND KAPADIA
PartnerRole in project
KALYAN DEVELOPMENT CORPORATION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51700024511/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Apr 2023

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2019-2020)File: Dazzle II Form 2A - March 2020.pdf12 Aug 2026
Form 2A (FY 2020-2021)File: Dazzle II Form 2A - March 2021.pdf12 Aug 2026
Form 2A (FY 2021-2022)File: Dazzle II Form 2A - March 2022.pdf12 Aug 2026
Form 2A (FY 2022-2023)File: Dazzle II Form 2A - March 2023.pdf12 Aug 2026
Form 2A (FY 2023-2024)File: Dazzle II Form 2A - March 2024.pdf12 Aug 2026
Form 2A (FY 2024-2025)File: Dazzle II Form 2A - March 2025.pdf12 Aug 2026
Form 2A (FY 2025-2026)File: Dazzle II Form 2A - March 2026.pdf12 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 - 2023-24 - Dazzle II.pdf12 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 - 2024-25 - Dazzle II.pdf12 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 - 2025-26 - Dazzle II.pdf12 Aug 2026
Withdrawal Update Form 1File: Dazzle II - Form 1 - June 2025.pdf11 Aug 2026
Withdrawal Update Form 1File: Dazzle II - Form 1 - September 2025.pdf11 Aug 2026
Withdrawal Update Form 1File: Dazzle II - Form 1 - December 2025.pdf11 Aug 2026
Withdrawal Update Form 1File: Dazzle II - Form 1 - March 2026.pdf11 Aug 2026
Withdrawal Update Form 1File: Dazzle II - Form 1 - June 2026.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 Dazzle June-25.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 Dazzle Sep-25.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 Dazzle Dec-25.pdf11 Aug 2026
Withdrawal Update Form 2File: Dazzle II - Form 2 - March 2026.pdf11 Aug 2026
Withdrawal Update Form 2File: Dazzle II - Form 2 - June 2026.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - June 25 Sign.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - Sept - 2025 Sign.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - Dec - 2025 Sign.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - Mar 26 Sign.pdf11 Aug 2026
Withdrawal Update Form 3File: Form 3 - June 26 Sign.pdf11 Aug 2026
Disclosure of sold/ booked inventoryFile: Sales Mis_compressed (6).pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold details_compressed.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Dazzle 2.pdf23 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: KDC FORM 5.pdf28 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: dazzle II C-1 compl certificate.pdf26 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf8 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A_compressed(1).pdf23 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: dazzle 2 19-20.pdf23 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: dazzle 2 20-21.pdf23 Sep 2021
Disclosure of sold/ booked inventoryFile: Dazzle 2_compressed.pdf12 Jun 2021
Copy of the legal title reportFile: legal title.pdf10 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: dazzle 2.pdf10 Feb 2020
Layout approvalFile: layout.pdf9 Nov 2019
Building plan approvalFile: layout.pdf9 Nov 2019
Copy of Layout Approval (in case of layout)File: layout.pdf9 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: layout.pdf9 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate.pdf9 Nov 2019
PAN CardFile: KDC Thakurli PAN No.pdf9 Oct 2019
Details of encumbrancesFile: no encumbrance cert.pdf9 Oct 2019
Declaration in FORM BFile: form B.pdf9 Oct 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech cert.pdf9 Oct 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT.pdf9 Oct 2019
Proforma of Allotment letterFile: FLAT SALE AGREEMENT - DAZZLE II.pdf9 Oct 2019

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mangeshi FlooraRAMBAUG LANE NO 4 END CHIKANGHAR KALYAN WEST110CompletedSep 2015Jun 2015
Mangeshi EliteRAMBAUG LANE NO.4 END CHIKANGHAR KALYAN WEST175CompletedDec 2014Oct 2014
Chandrabhaga-IISHREE COMPLEX CHOWK KOLIVALI KALYAN WEST63CompletedJun 2014Jan 2014
VishnukunjADHARWADI CHOWK KALYAN WEST15CompletedSep 2013May 2013
Mangeshi ViharSHREE COMPLEX CHOWK WADEGHAR KALYAN WEST66CompletedJun 2013Mar 2013
Mangeshi City-IISHREE COMPLEX CHOWK KOLIVALI KALYAN WEST130CompletedJun 2013Feb 2013
Mangeshi City-ISHREE COMPLEX CHOWK KOLIVALI KALYAN WEST395CompletedMar 2013Oct 2012
Appaji DhamSHREE COMPLEX CHOWK WADEGHAR KALYAN WEST94CompletedSep 2012Mar 2012
Mangeshi Srushti-IIKHADAKPADA GANDHARE KALYAN WEST179CompletedMar 2012Mar 2012
Mangeshi Srushti-IKHADAKPADA GANDHARE KLYAN - WEST154CompletedDec 2010Nov 2010
Mangeshi SaharaCHIKANGHAR KALYAN-W193CompletedDec 2010Nov 2010
Chandrabhaga TowerSHREE COMPLEX CHOWK KOLIVALI KALYAN WEST53CompletedAug 2010Mar 2010

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 4 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANGESHI DAZZLE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THAKURLI E7,600+ in Thane

2 kmMANGESHI DAZZLE IICompleted 72Lapsed / revoked 54Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 243 registered projects within 2 km.

Builder: KALYAN DEVELOPMENT CORPORATION

KALYAN DEVELOPMENT CORPORATION has 2 registrations on MahaRERA, including MANGESHI DAZZLE - III and MANGESHI DAZZLE II. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if MANGESHI DAZZLE II is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANGESHI DAZZLE II?

The registered promoter entity is KALYAN DEVELOPMENT CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANGESHI DAZZLE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANGESHI DAZZLE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANGESHI DAZZLE II?

The professionals named in the filing: Architect: RACHANA SHILP; Architect: Space Insight; Engineer: Dipali Patil; Engineer: Pratik Patil; Chartered Accountant: INS AND ASSOCIATES; Chartered Accountant: Kirti Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANGESHI DAZZLE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANGESHI DAZZLE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANGESHI DAZZLE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.