Home / Browse projects / Thane, Maharashtra / Mangalmurti Paradise
Mangalmurti Paradise
RG-MH-05989 · RERA P51700055074 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mangalmurti Paradise is a Others project by Shubham Construction in Thane, Maharashtra, registered with MahaRERA as P51700055074 on 29 Feb 2024. Possession is promised by 31 Dec 2026. 25 of the 84 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameMangalmurti Paradise
- TypeOthers
- Location
- Ayre
- Kalyan-Dombivali (M Corp.)
- Kalyan
- Thane
- 421201
- Pincode421201
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700055074
- ReraGenie IDRG-MH-05989
Builder
- NameShubham Construction
- Entity typePartnership
- PartnersReen Pandurang Mhatre, Akash Vinayak Patil, Abhijit Devram Patil, Chandubhai Arjanbhai Vaghela, Harshadbhai Arjanbhai Vaghela, Gulab Ramesh Mhatre, Pravin Ramesh Mhatre, Mayur Namdev Mhatre, Vinayak Deoram Patil, Ramesh Sukhrya Mhatre
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Feb 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Mangalmurti Paradise | NA | 15 | 14 | 68 | 16 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
Mangalmurti Paradise: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed58
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership12
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Kavita Krishna Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Sherubai Suresh Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Vishal Suresh Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Sudarshan Suresh Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Mayuri Kiran Patil | Kalyan-Dombivali (M Corp.) | Thane |
| Nilam Chandrakant Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Tejaswini Viraj Salvi | Kalyan-Dombivali (M Corp.) | Thane |
| Omkar Chandrakant Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Tejal Dinesh Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Yamuna Bhagwan Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Sachin Bhagwan Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
| Shrikant Bhagwan Mhatre | Kalyan-Dombivali (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Mangalmurti Paradise | NA | Rs 19.61 cr | Rs 8.13 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sthapatya Nirmaan (Shirish G Nachane) |
| Engineer | Shanti Consultants (Arvind S Patel) |
| Chartered Accountant | M/s. Vidya S. Bhure & Co. |
| Chartered Accountant | R H Pothiwal & Associates |
| Partner | Role in project |
|---|---|
| Shubham Construction | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate_Mangalmurti Paradise_Mar 26.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Mangalmurti Paradise_Mar 26.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE MANGALMURTI PARADISE MAR 26.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate_Mangalmurti Paradise_Dec 25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate_Mangalmurti Paradise_Dec 25.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate_Mangalmurti Paradise_Dec 2025.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_Sep 25.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: Form 2_Sep 25.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_Sep 25.pdf | 7 Nov 2025 |
| Withdrawal Update Form 1File: Architect Certificate - Mangalmurti Garden - June 25.pdf | 8 Aug 2025 |
| Withdrawal Update Form 2File: Engineer Certificate - Mangalmurti Paradise - Dec 24.pdf | 8 Aug 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE MANGALMURTI PARADISE JUN 25.pdf | 8 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_March 25.pdf | 10 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_March 25.pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_March 25.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Mangalmurti Paradise - Mar 25.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Dec 24.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mangalmurti Paradise - Dec 24.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Mangalmurti Paradise - Dec 24.pdf | 28 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-FY 23-24.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mangalmurti Paradise - Mar 24.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mangalmurti Paradise - Jun 24.pdf | 20 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Mangalmurti Paradise - Sep 24.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_March 24.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_June 24.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Sept 24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Sep 24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-June 24.pdf | 20 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-March 24.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Mangalmurti Paradise - Mar 24.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Mangalmurti Paradise - Jun 24.pdf | 20 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Mangalmurti Paradise - sep 24.pdf | 20 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report_23-24.pdf | 20 Dec 2024 |
| Other - TechnicalFile: CC Verification- Mangalmurti Paradise.pdf | 17 Feb 2024 |
| Declaration in FORM BFile: affidivate of PROMOTER new shubham construction LATEST.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized (11).pdf | 31 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Account Details NEW.pdf | 31 Jan 2024 |
| Other - LegalFile: ANNEXURE A (Declaration cum Undertaking).pdf | 31 Jan 2024 |
| Other - TechnicalFile: ANNEXURE A (Declaration cum Undertaking).pdf | 31 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (17).pdf | 11 Jan 2024 |
| Copy of the legal title reportFile: Final Title-Paradise-compressed_1.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER FINNACE - shubham construction.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER - shubham construction.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER FINNACE - shubham construction.pdf | 10 Jan 2024 |
| Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER - shubham construction.pdf | 10 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration of commencement certificate shubham construction.pdf | 10 Jan 2024 |
| CERSAI detailsFile: Declaration of Cersai shubham construction.pdf | 10 Jan 2024 |
| Proforma of Agreement for saleFile: AFS Mangalmurti Paradise.pdf | 10 Jan 2024 |
| Proforma of Allotment letterFile: AL _Mangalmusrti Paradise_shubham construction.pdf | 10 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation report ALLOTMENT LETTER SHUBHAM CONSTRUCTION.pdf | 10 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report AGREEMENT FOR SALE SHUBHAM CONSTRUCTION.pdf | 10 Jan 2024 |
| Other - LegalFile: Kharedikhat.pdf | 10 Jan 2024 |
| Other - LegalFile: आयरे_39_7_3_Satbara NEW.pdf | 10 Jan 2024 |
| Building plan approvalFile: Approved Plan_11zon (1).pdf | 27 May 2023 |
| Layout approvalFile: Plan Manalmurti page 3_11zon.pdf | 27 May 2023 |
| PAN CardFile: Shubham Construction Pan Card_rotated.pdf | 27 May 2023 |
| Copy of Layout Approval (in case of layout)File: Plan Manalmurti page 3_11zon.pdf | 27 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved Plan_11zon (1).pdf | 27 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 27 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Mangalmurti Paradise on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ayre7,600+ in Thane
Filed coordinates, straight-line distance. 266 registered projects within 2 km.
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: Shubham Construction
Shubham Construction has 1 registration on MahaRERA, including Mangalmurti Paradise. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mangalmurti Paradise is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mangalmurti Paradise?
The registered promoter entity is Shubham Construction, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mangalmurti Paradise?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mangalmurti Paradise?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mangalmurti Paradise?
The professionals named in the filing: Architect: Sthapatya Nirmaan (Shirish G Nachane); Engineer: Shanti Consultants (Arvind S Patel); Chartered Accountant: M/s. Vidya S. Bhure & Co.; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mangalmurti Paradise?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback