Registered No litigation declared Residential / Group Housing project

MANAS

By SKYLINE ENTERPRISES

RG-MH-78932 · RERA PR1260002502666 · Last updated on MahaRERA portal: 8 Jul 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
0 of 18Construction stages doneacross 2 buildings; furthest along: Excavation, 10%
12 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 11 documents Report an error

MANAS is a Residential / Group Housing project by SKYLINE ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as PR1260002502666 on 9 Mar 2026. Possession is promised by 30 Jun 2029. 0 of the 12 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameMANAS
  • TypeResidential / Group Housing
  • Location
    • GOLVALKAR GURUJI PATH
    • PARVATI
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002502666
  • ReraGenie IDRG-MH-78932

Builder

  • NameSKYLINE ENTERPRISES
  • Entity typePartnership
  • GSTIN27ADVFS4190H1ZE
  • PartnersAMEYA ARUN JOSHI, ARUN NARAYAN JOSHI
  • Other registrations10 more →
  • Completed4 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredMar 2026PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Mar 2026
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed11 files

Current status

0%0 of 12 units booked
18.0%Work done, per cost certificate

Figures as on 8 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MANASA Wing53606
MANASB Wing53606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 10%.

MANAS · wing A Wing1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
MANAS · wing B Wing1%
ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Basement19
Mechanical12
BuildingBasementMechanicalTotal
MANAS A Wing10616
MANAS B Wing9615

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area650 sq m
Land owned byNot the promoter
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jan 2026
LandownerVillageDistrict
MRS SUJATA UMESH VAIDYAParvatiPune
MR MAHESH BHASKAR JOSHIParvatiPune
MRS NEHA VIKAS LANDGEParvatiPune
MISS ULKA MADHAV JOSHIParvatiPune
MR KRISHNAKUMAR MUKUND JOSHIParvatiPune
MRS SHUBHADA PRABHAKAR GHANGURDEParvatiPune
SMT REKHA RAVINDRA PATWARDHANParvatiPune
SMT MEENA MADHAV BARVEParvatiPune
MISS SAYLEE ANAND PENDSEParvatiPune
MISS SWAPNA ANAND PENDSEParvatiPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI1182.18
Proposed, not sanctioned1,031 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLR SHOP NO 10 PART 12 13 14 AND 15 GLOBAL TRADE CENTER 212 RAMBAUGH COLONY LBS MARG PUNE 411030
Estimated costRs 3.75 cr
Cost incurredRs 67.58 lakh
Work done18.02%
BuildingWingEstimatedIncurred
MANASA WingRs 1.88 crRs 33.79 lakh
MANASB WingRs 1.88 crRs 33.79 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIRUDDHA TANAJI SHINDE
EngineerRAGHVENDRA GUTTAL
Chartered AccountantAMBAR NAIK AND ASSOCIATES
PartnerRole in project
SKYLINE ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed11

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf8 Jul 2026
Withdrawal Update Form 2File: FORM-2.pdf8 Jul 2026
Withdrawal Update Form 3File: FORM-3_compressed.pdf8 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf10 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf10 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf10 Apr 2026
Declaration and undertaking (Annexure A)File: ANNEXURE A DECLARATION CUM UNDERTAKING.pdf30 Jan 2026
Building plan approvalFile: AMALGAMATION .pdf24 Dec 2025
Building plan approvalFile: BASEMENT AND PARKING .pdf24 Dec 2025
Building plan approvalFile: FIRST TO THIRD FLOOR .pdf24 Dec 2025

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise4 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
YASHWANTP52100052140SADASHIV PETH ( NAVI PETH ), Pune12Jul 2023CompletedDec 2025Jul 2025
SAROJPlot No. 35, CTS No. 1220/35, Survey No. 42, Saroj Apartment, United Western Co Op Hsg Soc Ltd, Maharshi Karvenagar, Pune - 411052.--CompletedApr 2025Mar 2025
RAJDEEPP52100047221GANESHMALA, Pune-Oct 2022CompletedJan 2025Late, Jan 2025
SHREEMAHARASHTRA PWD EMPLOYEES CO OP HSG SOC BHARATKUNJ COLONY 2 ERANDWANE PUNE 4110385-CompletedJun 2024May 2024
TRIMURTICTS NO 168 FINAL PLOT NO 514 PLOT NO 5 SURVEY NO 94 FINAL PLOT NO 514 NEAR VRUSHALI SLIMMING CENTRE PARVATI PUNE 41100915-CompletedMay 2023Mar 2022
NESTSURVEY NO 82-4-1 PLOT NO 13 LALIT ESTATE NEAR VISHWESHWAR BANK BANER PUNE 4110459-CompletedDec 2021Late, Jan 2022
DINASHREENEAR ARANYESHWAR TEMPLE SAHAKARNAGAR PARVATI PUNE 4110098-CompletedAug 2018Late, Sep 2018
GULMOHARVEERBHADRA NAGAR BANER 4110457-CompletedAug 2016Late, Nov 2016

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MANAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARVATI13,700+ in Pune

2 kmMANASCompleted 77Lapsed / revoked 41Other 117Dot size: filed unitsN

Filed coordinates, straight-line distance. 235 registered projects within 2 km.

Builder: SKYLINE ENTERPRISES

SKYLINE ENTERPRISES has 11 registrations on MahaRERA, including Skyline Status and Sukhsagar Nagar. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if MANAS is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MANAS?

The registered promoter entity is SKYLINE ENTERPRISES, a partnership as per the filing. Its GSTIN 27ADVFS4190H1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MANAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MANAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MANAS?

The professionals named in the filing: Architect: ANIRUDDHA TANAJI SHINDE; Engineer: RAGHVENDRA GUTTAL; Chartered Accountant: AMBAR NAIK AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.