Home / Browse projects / Pune, Maharashtra / RAJDEEP
RAJDEEP
RG-MH-74908 · RERA P52100047221 · Last updated on MahaRERA portal: 19 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 21 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAJDEEP is a Residential / Group Housing project by SKYLINE ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100047221 on 12 Oct 2022. Possession was promised by 1 Jan 2025 and is now 21 months past that date.
At a glance
Project
- NameRAJDEEP
- TypeResidential / Group Housing
- Location
- SHIVPRASAD SOCIETY OFF SINHGAD ROAD
- GANESHMALA
- Parvati
- Haveli
- Pune
- 411030
- Pincode411030
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047221
- ReraGenie IDRG-MH-74908
Builder
- NameSKYLINE ENTERPRISES
- Entity typePartnership
- GSTIN27ADVFS4190H1ZE
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersAMEYA ARUN JOSHI, ARUN NARAYAN JOSHI
- Other registrations10 more →
- Completed4 of 11
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects8 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 Oct 2022
- Promised completion1 Jan 2025
- Revised completionNone
- Buildings1 building record
- Documents filed132 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAJDEEP | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
RAJDEEP: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 40% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed27
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MRUNMAYI SATISH PATHARKAR | Parvati | Pune |
| MANVELA SAGAR KAREKAR | Parvati | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SKYLINE ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jan 2025
Documents filed132
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 19 May 2026 |
| Form 2File: Form No 2 ENGG CERTIFICATE .pdf | 19 May 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 19 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory-Rajdeep.pdf | 19 May 2026 |
| Form 1File: form 1 Architect Certificate .pdf | 9 Jan 2026 |
| Form 2File: Form No 2 Engg Certificate.pdf | 9 Jan 2026 |
| Form 3File: FORM NO 3 C A Certificate.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajdeep Book Sold Inventory .pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECTS CERTIFICATE -RAJDEEP.pdf | 9 Jan 2026 |
| Form 2File: FORM 2 ENGG CERTIFICATE.pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CA CERTIFICATE - RAJDEEP.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD INVENTORY - RAJDEEP.pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 9 Jan 2026 |
| Form 2File: FORM 2 ENGINEERS CERTIFICATE.pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: BOOKED AND SOLD INVENTORY.pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 9 Jan 2026 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD AND BOOKED INVENTORIES .pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE .pdf | 9 Jan 2026 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE .pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSE OF SOLD AND BOOKED INVERNTORY .pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE .pdf | 9 Jan 2026 |
| Form 2File: FORM 2 ENGINEER CERTIFICATE .pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE .pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSE OF SOLD AND BOOKED INVERNTORY .pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 9 Jan 2026 |
| Form 2File: Form No 2 ENGG CERTIFICATE .pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: BOOKED - SOLD INVENTORIES.pdf | 9 Jan 2026 |
| Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf | 9 Jan 2026 |
| Form 2File: Form No 2 ENGG CERTIFICATE .pdf | 9 Jan 2026 |
| Form 3File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 9 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Diclosure of Sold_Booked Inventory-Rajdeep.pdf | 9 Jan 2026 |
| Form 2A (FY 2022-2023)File: FIRST _ FY 22-23.pdf | 9 Jan 2026 |
| Form 2A (FY 2023-2024)File: SECOND _ FY 23-24.pdf | 9 Jan 2026 |
| Form 2A (FY 2024-2025)File: THIRD _ FY 24-25.pdf | 9 Jan 2026 |
| Form 5 (FY 2022-2023)File: FORM 5 - ANNUAL REPORT STATEMENT OF ACCOUNT.pdf | 6 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form No 5 Chartered Accountant Certificate .pdf | 6 Jan 2026 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE.pdf | 28 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 3 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 3 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 ENGG CERTIFICATE .pdf | 3 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Diclosure of Sold_Booked Inventory-Rajdeep.pdf | 3 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 Chartered Accountant Certificate .pdf | 9 Nov 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE .pdf | 9 Oct 2024 |
| Building plan approvalFile: 4TH Sanctioned Plan 1-2_compressed (1).pdf | 8 Oct 2024 |
| Building plan approvalFile: 4TH Sanctioned Plan 2-2.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 ENGG CERTIFICATE .pdf | 8 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4TH Sanctioned Plan 1-2_compressed (1).pdf | 8 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4TH Sanctioned Plan 2-2.pdf | 8 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BOOKED - SOLD INVENTORIES.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE .pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf | 29 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A - ENGINEER CERTIFICATE .pdf | 29 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSE OF SOLD AND BOOKED INVERNTORY .pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE .pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE .pdf | 19 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE .pdf | 19 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A - ENGINEER CERTIFICATE .pdf | 19 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSE OF SOLD AND BOOKED INVERNTORY .pdf | 19 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE .pdf | 19 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf | 25 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD AND BOOKED INVENTORIES .pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 25 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - ANNUAL REPORT STATEMENT OF ACCOUNT.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 29 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 29 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 29 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE.pdf | 29 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: BOOKED AND SOLD INVENTORY.pdf | 29 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 29 Aug 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE - RAJDEEP.pdf | 9 May 2023 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| YASHWANTP52100052140 | SADASHIV PETH ( NAVI PETH ), Pune | 12 | Jul 2023 | Completed | Dec 2025 | Jul 2025 |
| SAROJ | Plot No. 35, CTS No. 1220/35, Survey No. 42, Saroj Apartment, United Western Co Op Hsg Soc Ltd, Maharshi Karvenagar, Pune - 411052. | - | - | Completed | Apr 2025 | Mar 2025 |
| SHREE | MAHARASHTRA PWD EMPLOYEES CO OP HSG SOC BHARATKUNJ COLONY 2 ERANDWANE PUNE 411038 | 5 | - | Completed | Jun 2024 | May 2024 |
| TRIMURTI | CTS NO 168 FINAL PLOT NO 514 PLOT NO 5 SURVEY NO 94 FINAL PLOT NO 514 NEAR VRUSHALI SLIMMING CENTRE PARVATI PUNE 411009 | 15 | - | Completed | May 2023 | Mar 2022 |
| NEST | SURVEY NO 82-4-1 PLOT NO 13 LALIT ESTATE NEAR VISHWESHWAR BANK BANER PUNE 411045 | 9 | - | Completed | Dec 2021 | Late, Jan 2022 |
| DINASHREE | NEAR ARANYESHWAR TEMPLE SAHAKARNAGAR PARVATI PUNE 411009 | 8 | - | Completed | Aug 2018 | Late, Sep 2018 |
| GULMOHAR | VEERBHADRA NAGAR BANER 411045 | 7 | - | Completed | Aug 2016 | Late, Nov 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 132 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAJDEEP on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GANESHMALA13,700+ in Pune
Filed coordinates, straight-line distance. 237 registered projects within 2 km.
NYATI EVANIA
NYATI CONSTRUCTION PRIVATE LIMITED
CENTRALVISTA
NAIKNAVARE DEVELOPERS PVT. LTD.
Guardian Cityscapes Phase-3
Guardian Homes Private Limited
SARASNAGAR
CITY ETHERNAL LLP
PROFITBAY
LAXMI SPACECON LLP
SUN GLORY
Jindal Mittal Graha Nirman Pvt. Ltd.
Builder: SKYLINE ENTERPRISES
SKYLINE ENTERPRISES has 11 registrations on MahaRERA, including Skyline Status and Sukhsagar Nagar. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that RAJDEEP shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RAJDEEP is delayed beyond 1 Jan 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAJDEEP?
The registered promoter entity is SKYLINE ENTERPRISES, a partnership as per the filing. Its GSTIN 27ADVFS4190H1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAJDEEP?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAJDEEP?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in RAJDEEP?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback