Home / Browse projects / Pune, Maharashtra / ARCO SKYLIFE

Registered No litigation declared Others project

ARCO SKYLIFE

By ARCO ENGINEERS

RG-MH-36702 · RERA P52100046068 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 60%
14 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

ARCO SKYLIFE is a Others project by ARCO ENGINEERS in Pune, Maharashtra, registered with MahaRERA as P52100046068 on 15 Jun 2022. Possession is promised by 31 Dec 2026. 58 of the 72 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameARCO SKYLIFE
  • TypeOthers
  • Location
    • PUNE SATARA ROAD
    • CITY PRIDE CHOWK
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100046068
  • ReraGenie IDRG-MH-36702

Builder

  • NameARCO ENGINEERS
  • Entity typePartnership
  • PartnersRATAN NEMICHAND NIMANI, SATISH NEMICHAND NIMANI, ROHAN SATISH NIMANI, SUBHASH NAGRAJ OSWAL, SHREEPAL SUBHASH OSWAL, HIMANSHU SATISH NIMANI

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed107 files

Current status

81%58 of 72 units booked
51.5%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARCO SKYLIFENA211764872

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

ARCO SKYLIFE: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes35%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed236

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots236
Closed/Covered228
Open Space8

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,636 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI13813.08
Proposed, not sanctioned13,750 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM-4, VIRWANI PLAZA,11, EAST STREET,PUNE
Estimated costRs 82.93 cr
Cost incurredRs 42.74 cr
Work done51.54%
BuildingWingEstimatedIncurred
ARCO SKYLIFENARs 82.93 crRs 42.74 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPandit Joshi & Associates Architects
EngineerFIDESTO
Chartered AccountantP.M Rathod & Associates
Chartered AccountantJinendra Parakh and Company
PartnerRole in project
ARCO ENGINEERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Arco Engineers - Form 2A - Final .pdf29 Jun 2026
Withdrawal Update Form 1File: Arco Engineers (Q4) Form-1 (1).pdf24 Apr 2026
Withdrawal Update Form 2File: Arco Engineers Form-2 (Q4 ).pdf24 Apr 2026
Withdrawal Update Form 3File: Arco Engineers (Q4) Form 03.pdf24 Apr 2026
Withdrawal Update Form 1File: FORM 1 - ARCHITECT CERTIFICATE - Q3 - 25-26- SIGN COPY (1).pdf17 Jan 2026
Withdrawal Update Form 2File: FORM 2 - ENGINEERS CERTIFICATE - Q3 - 25-26- SIGN COPY.pdf17 Jan 2026
Withdrawal Update Form 3File: FORM 3 - CA CERTIFICATE - Q3 - 25-26- SIGN COPY_compressed.pdf17 Jan 2026
Building plan approvalFile: Page 110 (1).pdf19 Dec 2025
Building plan approvalFile: Page 210.pdf19 Dec 2025
Building plan approvalFile: Page 310.pdf19 Dec 2025
Building plan approvalFile: Page 410.pdf19 Dec 2025
Building plan approvalFile: Page 510.pdf19 Dec 2025
Building plan approvalFile: Page 610.pdf19 Dec 2025
Building plan approvalFile: Page 710.pdf19 Dec 2025
Building plan approvalFile: Page 810 (1).pdf19 Dec 2025
Building plan approvalFile: Page 910.pdf19 Dec 2025
Building plan approvalFile: Page 1010.pdf19 Dec 2025
Withdrawal Update Form 1File: Final form 1 - Architects Certificate - Q2 - 25-26 .pdf29 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2 - 25-26 - Final.pdf29 Oct 2025
Withdrawal Update Form 3File: Form-3 Q2 25-26 Final.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Arco Engineers Form 5 - 2024-2025.pdf30 Sep 2025
Building plan approvalFile: 1.pdf20 Sep 2025
Building plan approvalFile: 2.pdf20 Sep 2025
Building plan approvalFile: 3.pdf20 Sep 2025
Building plan approvalFile: 4.pdf20 Sep 2025
Building plan approvalFile: 5.pdf20 Sep 2025
Building plan approvalFile: 6.pdf20 Sep 2025
Building plan approvalFile: 7.pdf20 Sep 2025
Building plan approvalFile: 8.pdf20 Sep 2025
Building plan approvalFile: 9.pdf20 Sep 2025
Building plan approvalFile: 10.pdf20 Sep 2025
Withdrawal Update Form 1File: Form 1- Q1 - 25-26.pdf18 Jul 2025
Withdrawal Update Form 2File: Form 2 Q1 25-26.pdf18 Jul 2025
Withdrawal Update Form 3File: Form3 Q1 25-26_Final (2)_compressed.pdf18 Jul 2025
Withdrawal Update Form 1File: Form 1- Q1 - 25-26.pdf15 Jul 2025
Withdrawal Update Form 2File: Form 2 Q1 25-26.pdf15 Jul 2025
Withdrawal Update Form 3File: Form3 Q1 25-26_Final (2)_compressed.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A .pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT Q4 FY 24-25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Q4 FY 24-25 c.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER Q4 FY 24-25 c.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of S-B InventoryQ4-24-25.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE _compressed.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Acro Engineers Signed (C).pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Acro Engineers Signed.pdf11 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD_UNSOLD INVENTORY Q3 24-25_compressed.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE FOR RERA TRANSF.pdf10 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE FOR RERA TRANSF.pdf10 Jun 2024
Building plan approvalFile: 1.pdf22 May 2024
Building plan approvalFile: 2.pdf22 May 2024
Building plan approvalFile: 3.pdf22 May 2024
Building plan approvalFile: 4.pdf22 May 2024
Building plan approvalFile: 5.pdf22 May 2024
Building plan approvalFile: 6.pdf22 May 2024
Building plan approvalFile: 7.pdf22 May 2024
Building plan approvalFile: 8.pdf22 May 2024
Building plan approvalFile: 9.pdf22 May 2024
Building plan approvalFile: 10.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf22 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf4 Aug 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT TO SELL.pdf4 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declataion for Separate Bank Account Form A.pdf8 Aug 2022
Proforma of Allotment letterFile: Annx 1 Allotment Letter.pdf14 Jul 2022
Copy of the legal title reportFile: Format A.pdf1 Jun 2022
CERSAI detailsFile: Undertaking for CRESAI.pdf30 May 2022
Declaration in FORM BFile: Form B.pdf27 May 2022
Proforma of Allotment letterFile: DRAFT AGREEMENT TO SELL.pdf27 May 2022
Proforma of Allotment letterFile: Allotment Letter.pdf24 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 May 2022

How this compares with Pune

81%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARCO SKYLIFE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CITY PRIDE CHOWK13,700+ in Pune

2 kmARCO SKYLIFECompleted 58Lapsed / revoked 28Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 185 registered projects within 2 km.

Builder: ARCO ENGINEERS

ARCO ENGINEERS has 1 registration on MahaRERA, including ARCO SKYLIFE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ARCO SKYLIFE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARCO SKYLIFE?

The registered promoter entity is ARCO ENGINEERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARCO SKYLIFE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARCO SKYLIFE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARCO SKYLIFE?

The professionals named in the filing: Architect: Pandit Joshi & Associates Architects; Engineer: FIDESTO; Chartered Accountant: P.M Rathod & Associates; Chartered Accountant: Jinendra Parakh and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARCO SKYLIFE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARCO SKYLIFE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARCO SKYLIFE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.