Home / Browse projects / Pune, Maharashtra / TANUSHREE

Registered No litigation declared Residential / Group Housing projectRedevelopment

TANUSHREE

By SHREESHA LANDMARK TANUSHREE

RG-MH-47642 · RERA PR1260002502758 · Last updated on MahaRERA portal: 14 Oct 2026

Why this is marked a redevelopment: this filing shows 37 flats filed as rehab units, MahaRERA's column for homes returned to existing occupants or owners. MahaRERA has no redevelopment field, so this is ReraGenie's reading of the filing. Redevelopment across Pune.

Source: official MahaRERA filing

Red flags

  • Rs 7.00 crore secured on the land, in favour of TRUHOME FINANCE LTD

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2030Possession promisedmoved 4 months by MahaRERA order
4 of 16Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 40%
51 of 51Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 16 documents Report an error

TANUSHREE is a Residential / Group Housing project by SHREESHA LANDMARK TANUSHREE in Pune, Maharashtra, registered with MahaRERA as PR1260002502758 on 12 Mar 2026. Possession is promised by 30 Apr 2030. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 0 of the 51 units on this registration are recorded sold or booked, and 4 of 16 construction stages are filed complete.

At a glance

Project

  • NameTANUSHREE
  • TypeResidential / Group Housing
  • Location
    • PARVATI ROAD
    • PARVATI NORTH
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002502758
  • ReraGenie IDRG-MH-47642

Builder

  • NameSHREESHA LANDMARK TANUSHREE
  • Entity typePartnership
  • GSTIN27AFIFS4786G1ZF
  • PartnersDHANANJAY TANAJI BHILARE, SAWANKUMAR GIRIDHARILAL CHANDAK, VINOD DASHARATH DANAVALE

Key dates

this monthRegisteredMar 2026First promiseDec 2029Revised toApr 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2026
  • Promised completion30 Apr 2030
  • Revised completionRevised to 30 Apr 2030 (originally 31 Dec 2029)
  • Buildings2 building records
  • Documents filed16 files

Current status

0%0 of 51 units booked
26.0%Work done, per cost certificate

Figures as on 14 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TANUSHREEA-18739039
TANUSHREEA-27612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 16 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 40%.

TANUSHREE · wing A-134%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TANUSHREE · wing A-234%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Stilt / Ground61
BuildingStilt / GroundTotal
TANUSHREE A-14141
TANUSHREE A-22020

Land and ownership61

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area687 sq m
Land owned byNot the promoter
Named landowners61
Encumbrance on the landDeclared present
Charge in favour ofTRUHOME FINANCE LTD
Secured amountRs 7.00 crore
CERSAI search filedYes
Declared on21 Aug 2026
LandownerVillageDistrict
HANUMANT GOVIND SAWANTPune (M Corp.)Pune
PRIYA TUSHAR OGALEPune (M Corp.)Pune
SUNANDA DINKAR DIMBLEPune (M Corp.)Pune
ASHA ASHOK KEDARIPune (M Corp.)Pune
PARAG SADASHIV NALAWADEPune (M Corp.)Pune
KANTABAI RAMESH SHINDEPune (M Corp.)Pune
KISANRAO METHAJI MOREPune (M Corp.)Pune
SANGRAM RAVINDRA SALUNKHEPune (M Corp.)Pune
PRABHAVATI RAVINDRA SHAHANEPune (M Corp.)Pune
LAXMIBAI MANIK OGALEPune (M Corp.)Pune
SUNIL NARAYAN GUJARPune (M Corp.)Pune
SHASHIKANT NARAYAN GUJARPune (M Corp.)Pune
VIKAS BABAN SURYAWANSHIPune (M Corp.)Pune
SUNANDA SHAILESH NIKALAJEPune (M Corp.)Pune
SHEKHAR NARAYAN MANEPune (M Corp.)Pune
DIPAK NARAYAN MANEPune (M Corp.)Pune
ANKUSH BABURAO MANEPune (M Corp.)Pune
LATA BARAKU AMBREPune (M Corp.)Pune
VISHAL BARAKU AMBREPune (M Corp.)Pune
JAY BARAKU AMBREPune (M Corp.)Pune
VIJAY BARAKU AMBREPune (M Corp.)Pune
SANTOSHI TUKARAM KADAMPune (M Corp.)Pune
SAFURA NAZIM SHAIKHPune (M Corp.)Pune
MUKUND KISANRAO PASALKARPune (M Corp.)Pune
SADHANA DIPAK RENUSEPune (M Corp.)Pune
JAYSHREE SATISH DHIDEPune (M Corp.)Pune
SACHIN SUBHASH DHIDEPune (M Corp.)Pune
JAYSHREE BHIMRAO JADHAVPune (M Corp.)Pune
VIJAY BHIMRAO JADHAVPune (M Corp.)Pune
BHAGYASHREE ANIL GAIKWADPune (M Corp.)Pune
SHITAL PRASHANT LUKEPune (M Corp.)Pune
RANJANA VASANTRAO AARATEPune (M Corp.)Pune
VINOD VASANT AARATEPune (M Corp.)Pune
PRASHANT VASANTRAO AARTEPune (M Corp.)Pune
VISHAL VITTHAL TAGUNDEPune (M Corp.)Pune
KALURAM SAMBHAJI RANPISEPune (M Corp.)Pune
ANITA KALURAM RANPISEPune (M Corp.)Pune
DINESH MARUTI JADHAVPune (M Corp.)Pune
SUNANDA DINKAR DIMBLEPune (M Corp.)Pune
SUREKHA BABAN MUJUMALEPune (M Corp.)Pune
SUNITA RAJU DIVEKARPune (M Corp.)Pune
SAVITA GANGARAM DHUMEPune (M Corp.)Pune
LAXMAN MARUTI HADAKEPune (M Corp.)Pune
BAYDABAI MAHADEV KIRAVEPune (M Corp.)Pune
SAMEER DAGADU RENUSEPune (M Corp.)Pune
ASHA DATTA SONAWANEPune (M Corp.)Pune
PRIYANKA SACHIN JADHAVPune (M Corp.)Pune
MOTILAL BHIVSEN NAIKPune (M Corp.)Pune
SUSHILA MOTILAL NAIKPune (M Corp.)Pune
TUSHAR MANIK OGALEPune (M Corp.)Pune
SUSHILA NAMDEO PAWARPune (M Corp.)Pune
RAVI NAMDEO PAWARPune (M Corp.)Pune
SAGAR NAMDEO PAWARPune (M Corp.)Pune
DILIP TUKARAM CHORGHEPune (M Corp.)Pune
KALPANA HANUMANT SAWANTPune (M Corp.)Pune
MOHAMMAD HUSAIN SHAIKHPune (M Corp.)Pune
SUMAN TUKARAM YENPUREPune (M Corp.)Pune
SHRIKANT VISHNU YENPUREPune (M Corp.)Pune
MANDA VISHNU KABDULEPune (M Corp.)Pune
UTKARSHA UMESH CHILEPune (M Corp.)Pune
SUJATA NAGESH BOBADEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI2261.91
Proposed, not sanctioned2,262 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch PARMAR HOUSE,2413, EAST STREET, GEN. THIMAYYA ROAD,CAMP
Estimated costRs 5.80 cr
Cost incurredRs 1.51 cr
Work done25.96%
BuildingWingEstimatedIncurred
TANUSHREEA-1Rs 3.14 crRs 94.27 lakh
TANUSHREEA-2Rs 2.14 crRs 42.85 lakh
-NARs 51.39 lakhRs 13.44 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSNEHA CHANDAK
EngineerRANJITSINHA SHITOLE
Chartered AccountantGANESH PRABHAKAR DHINDLE
Chartered AccountantRAVISH MANIYAR
PartnerRole in project
SHREESHA LANDMARK TANUSHREE-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2029 → Apr 2030

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jul 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2030

Documents filed16

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf14 Oct 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf14 Oct 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf14 Oct 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf4 Aug 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf4 Aug 2026
Building plan approvalFile: PLAN-1.pdf6 Jul 2026
Building plan approvalFile: PLAN-2.pdf6 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf4 Jul 2026
Form 5 (FY 2025-2026)File: FORM 5.pdf25 Jun 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE NEW.pdf20 May 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf20 May 2026
Declaration and undertaking (Annexure A)File: ANNEXURE A-DECLARATION CUM UNDERTAKING.pdf25 Dec 2025
Building plan approvalFile: PLAN-1.pdf8 Dec 2025
Building plan approvalFile: PLAN-2.pdf8 Dec 2025

How this compares with Pune

0%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 4 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TANUSHREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARVATI NORTH14,000+ in Pune

2 kmTANUSHREECompleted 62Lapsed / revoked 36Other 115Dot size: filed unitsN

Filed coordinates, straight-line distance. 213 registered projects within 2 km.

Builder: SHREESHA LANDMARK TANUSHREE

SHREESHA LANDMARK TANUSHREE has 1 registration on MahaRERA, including TANUSHREE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TANUSHREE is delayed beyond 30 Apr 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TANUSHREE?

The registered promoter entity is SHREESHA LANDMARK TANUSHREE, a partnership as per the filing. Its GSTIN 27AFIFS4786G1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TANUSHREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TANUSHREE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TANUSHREE?

The professionals named in the filing: Architect: SNEHA CHANDAK; Engineer: RANJITSINHA SHITOLE; Chartered Accountant: GANESH PRABHAKAR DHINDLE; Chartered Accountant: RAVISH MANIYAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TANUSHREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TANUSHREE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TANUSHREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.