ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / NYATI EMBLEM

Registered No litigation declared Residential / Group Housing project

NYATI EMBLEM

By NYATI CONSTRUCTION PRIVATE LIMITED

RG-MH-07457 · RERA P52100076789 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Rs 150.00 crore secured on the land, in favour of Tata Capital Housing Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
23 of 42Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

NYATI EMBLEM is a Residential / Group Housing project by NYATI CONSTRUCTION PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100076789 on 28 Jun 2024. Possession is promised by 31 Dec 2027. 19 of the 42 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameNYATI EMBLEM
  • TypeResidential / Group Housing
  • Location
    • Taluka - Pune City
    • Parvati
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076789
  • ReraGenie IDRG-MH-07457

Builder

  • NameNYATI CONSTRUCTION PRIVATE LIMITED
  • Entity typeCompany
  • CINU45202MH1996PTC102517
  • GSTIN27AAACN6421D1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsPRANAV NITIN NYATI, NITIN DWARKADAS NYATI
  • Other registrations5 more →
  • Completed2 of 6

Key dates

this monthRegisteredJun 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed82 files

Current status

45%19 of 42 units booked
15.7%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building FNA222040040
Building GNA31202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

Building F20%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)12%
Plinth75%
Stilt Floor0%
Slabs of Super Structure33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building G21%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)12%
Plinth90%
Stilt Floor0%
Slabs of Super Structure34%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks9%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes17%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes15%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84
BuildingClosed/CoveredTotal
Building F8080
Building G44

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,010 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTata Capital Housing Finance Limited
Secured amountRs 150.00 crore
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
AMIT VASTU VENTURES LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI31803.94
Proposed, not sanctioned12,269 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG-01 B WTC Tower 1 Kharadi, Opp Eon Freezone, MIDC Knowledge Park, Pune 411014
Estimated costRs 142.92 cr
Cost incurredRs 22.44 cr
Work done15.7%
BuildingWingEstimatedIncurred
Building FNARs 77.14 crRs 12.54 cr
Building GNARs 51.31 crRs 8.89 cr
-NARs 14.47 crRs 1.02 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ TATOOSKAR
EngineerVishwanath Dhande
EngineerSamishthi Techno Service Consultants LLP
EngineerNITIN NALAWADE
EngineerSUBHASH BHANDIGARE
Chartered AccountantNICKY HIRANAND MILANI
Chartered AccountantVipin Gujarathi & Associates
PartnerRole in project
NYATI CONSTRUCTION PRIVATE LIMITED-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
SM12600183Ram GawaliNYATI CONSTRUCTION PRIVATE LIMITED23/03/2026
SM12600443Ram GawaliNYATI CONSTRUCTION PRIVATE LIMITED29/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Nyati Emblem Form 2A 2025-2026.pdf23 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Feb 2026
Withdrawal Update Form 3File: Form 3 Q3 Emblem Signed by NDN.pdf17 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf24 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf24 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf24 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf18 Nov 2025
Withdrawal Update Form 2File: FORM 2.pdf18 Nov 2025
Withdrawal Update Form 3File: FORM 3.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: Nyati Emblem.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Nyati Emblem Form 2A 2024-2025.pdf23 Sep 2025
Building plan approval or NA orderFile: Commencement Certificate.pdf19 Aug 2025
Layout approvalFile: Layout.pdf19 Aug 2025
Building plan approvalFile: Parking Layout.pdf19 Aug 2025
Building plan approvalFile: F Bldg 1st & 2nd Floor.pdf19 Aug 2025
Building plan approvalFile: F Bldg Ele & Sections.pdf19 Aug 2025
Building plan approvalFile: F Bldg Typ 6th 11th 16th Floor.pdf19 Aug 2025
Building plan approvalFile: G Bldg Typ 1st & 2nd Floor.pdf19 Aug 2025
Building plan approvalFile: G Ele Sections.pdf19 Aug 2025
Building plan approvalFile: G-Bldg Typ 6th 11th 16th Floor.pdf19 Aug 2025
Proforma of Agreement for saleFile: EMBLEM UNIT AGREEMENT 20052025.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf9 May 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf8 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf8 May 2025
Proforma of Agreement for saleFile: EMBLEM UNIT AGREEMENT 03052025.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Emblem Form 3.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf20 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A - NYATI EMBLEM.pdf17 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B - NYATI EMBLEM.pdf17 Dec 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf26 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Oct 2024
CERSAI detailsFile: CERSAI clarification_tata.pdf21 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_Search_21_06_2024_13_12_22_001.pdf21 Jun 2024
Declaration about Commencement CertificateFile: Form D 150624.pdf15 Jun 2024
Other - TechnicalFile: 2 Other - Legal.pdf13 Jun 2024
CERSAI detailsFile: Cersai Undertaking.pdf31 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf31 May 2024
Proforma of Agreement for saleFile: EMBLEM UNIT AGREEMENT CLEAN 31524 FINAL.pdf31 May 2024
Proforma of Allotment letterFile: EMBLEM Allotment Letter 31052024.pdf31 May 2024
Deviation Report with respect to Allotment letterFile: Devisation Sheet of Allotment Letter.pdf31 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Sheet of Unit Agreement.pdf31 May 2024
Other - LegalFile: Declaration as per order 50.pdf31 May 2024
Layout approvalFile: Phasewise Layout.pdf29 May 2024
Building plan approvalFile: F Bldg Ele Section.pdf29 May 2024
Building plan approvalFile: F Bldg Typ Flr Plan.pdf29 May 2024
Building plan approvalFile: F Building Typ Flr Plan.pdf29 May 2024
Building plan approvalFile: G Bldg Ele Section.pdf29 May 2024
Building plan approvalFile: G Bldg First Flr Plan.pdf29 May 2024
Building plan approvalFile: Parking Plan.pdf29 May 2024
Building plan approvalFile: Plot Area Calculation.pdf29 May 2024
PAN CardFile: NCPL PAN.pdf29 May 2024
Copy of the legal title reportFile: Legal Title Report dt 28052024.pdf29 May 2024
Details of encumbrances concerned to FinanceFile: LEGAL AND FINANCE DECLARATION.pdf29 May 2024
Details of encumbrances concerned to LegalFile: LEGAL AND FINANCE DECLARATION.pdf29 May 2024
Copy of Layout Approval (in case of layout)File: Phasewise Layout.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: F Bldg Ele Section.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: F Bldg Typ Flr Plan.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: F Building Typ Flr Plan.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: G Bldg Ele Section.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: G Bldg First Flr Plan.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan.pdf29 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot Area Calculation.pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 May 2024
Declaration in FORM BFile: Form B Developer.pdf29 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 .pdf29 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: PRANAV SIR DISCLOSURE.pdf29 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: NDN-DISCLOSURE.pdf29 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declration about Separate Bank Account.pdf29 May 2024

How this compares with Pune

45%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EMBLEM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parvati13,700+ in Pune

2 kmNYATI EMBLEMCompleted 46Lapsed / revoked 19Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: NYATI CONSTRUCTION PRIVATE LIMITED

NYATI CONSTRUCTION PRIVATE LIMITED has 6 registrations on MahaRERA, including NYATI ERA I and NYATI ERA II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EMBLEM is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EMBLEM?

The registered promoter entity is NYATI CONSTRUCTION PRIVATE LIMITED, a company as per the filing. Its CIN U45202MH1996PTC102517 and GSTIN 27AAACN6421D1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EMBLEM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI EMBLEM?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI EMBLEM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI EMBLEM?

The professionals named in the filing: Architect: MANOJ TATOOSKAR; Engineer: Vishwanath Dhande; Engineer: Samishthi Techno Service Consultants LLP; Engineer: NITIN NALAWADE; Engineer: SUBHASH BHANDIGARE; Chartered Accountant: NICKY HIRANAND MILANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI EMBLEM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EMBLEM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EMBLEM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.