Registered No litigation declared Residential / Group Housing project

MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.

By ARDHYA UNIVERSAL LLP

RG-MH-06277 · RERA P51800052335 · Last updated on MahaRERA portal: 14 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 19 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 90%
14 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD. is a Residential / Group Housing project by ARDHYA UNIVERSAL LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052335 on 14 Aug 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 19 months from the original filing. 10 of the 24 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameMALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.
  • TypeResidential / Group Housing
  • Location
    • MANCHUBHAI ROAD
    • NEAR COD GATE
    • MALAD EAST
    • MALAD EAST
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052335
  • ReraGenie IDRG-MH-06277

Builder

  • NameARDHYA UNIVERSAL LLP
  • Entity typePartnership
  • GSTIN27ACAFA0982H1ZJ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerVIKRAM OMPRAKASH SINGH
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2023First promiseMay 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed91 files

Current status

42%10 of 24 units booked
100.0%Work done, per cost certificate

Figures as on 14 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MALAD AMAR CO OPERATIVE HOSING SOCIETY LTDNA7724024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

MALAD AMAR CO OPERATIVE HOSING SOCIETY LTD: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area430 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2025
LandownerVillageDistrict
MALAD AMAR CO-OPERATIVE HOUSING SOCIETY LIMITEDMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 16 AND 17, SIMPLEX KHUSHAANGAN, 82 VIJAYKAR WADI, S V ROAD, MALAD WEST, MUMBAI 400064
Estimated costRs 3.00 cr
Cost incurredRs 3.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
MALAD AMAR CO OPERATIVE HOSING SOCIETY LTDNARs 3.00 crRs 3.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMEET ASSOCIATES
ArchitectSWAPNIL PRABHAKAR AMBRE
EngineerKRISHNA DEULAR
Chartered AccountantPUNIT B GUPTA & ASSOCIATES
Chartered AccountantYOJANA B GUPTA & ASSOCIATES
PartnerRole in project
ARDHYA UNIVERSAL LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11072502053May 2025 → Mar 2026

Reason as filed by the promoterThe project is nearing completion, and we aim to obtain the full occupancy certificate before March 31, 2026. We have sold total 6 units and we have obtained the consent of 4 allottees.

EA20052621040May 2025 → Dec 2026

Reason as filed by the promoterThe project is nearing completion, and we aim to obtain the full occupancy certificate before December 31, 2026. We have sold total 10 units and we have obtained the consent of 6 allottees.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - 30-06-2026.pdf14 Aug 2026
Withdrawal Update Form 2File: FORM 2 - 30-06-2026.pdf14 Aug 2026
Withdrawal Update Form 3File: FORM 3 - 30-06-2026.pdf14 Aug 2026
Withdrawal Update Form 1File: FORM 1 - 30-09-2025.pdf20 May 2026
Withdrawal Update Form 1File: FORM 1 - 31-12-2025.pdf20 May 2026
Withdrawal Update Form 1File: FORM 1 - 31-03-2026.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 - 30-09-2025.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 - 31-12-2025.pdf20 May 2026
Withdrawal Update Form 2File: FORM 2 - 31-03-2026.pdf20 May 2026
Withdrawal Update Form 3File: FORM 3 - 30-09-2025.pdf20 May 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf20 May 2026
Withdrawal Update Form 3File: FORM 3 - 31-03-2026.pdf20 May 2026
Form 1File: ARCHITECT.pdf29 May 2025
Form 2File: ENGINEER.pdf29 May 2025
Form 3File: CA.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD UNSOLD.pdf29 May 2025
Form 1File: ARCHITECT.pdf29 May 2025
Form 2File: ENGINEER.pdf29 May 2025
Form 3File: CA.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf29 May 2025
Form 1File: ARCHITECT.pdf29 May 2025
Form 2File: ENGINEER.pdf29 May 2025
Form 3File: CA.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf29 May 2025
Form 1File: ARCHITECT.pdf29 May 2025
Form 2File: ENGINEER.pdf29 May 2025
Form 3File: CA.pdf29 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf29 May 2025
Form 5 (FY 2023-2024)File: FORM 5 2023-24.pdf29 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AA.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: ARDHYA UNIVERSAL LLP.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Malad Amar CA.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MALAD AMAR CHS_1-4.pdf13 Mar 2025
Layout approvalFile: Drawing_1-1.pdf30 Jan 2025
Building plan approvalFile: Drawing_2-2.pdf30 Jan 2025
Building plan approvalFile: Drawing_3-end.pdf30 Jan 2025
Copy of Layout Approval (in case of layout)File: Drawing_1-1.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30-09-23.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 31-12-23.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 31-03-24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30-06-24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 30-09-24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 06-12-24.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2023.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 31-03-2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-2023.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 31-03-2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 03 30-06-2024.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2024.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 31-03-24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 27-11-24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 30-09-24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 30-06-24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 31-12-23.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 30-09-23.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing_2-2.pdf30 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Drawing_3-end.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_unsold 30-09-23.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_unsold 31-12-23.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_unsold 31-03-24.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold_unsold 30-06-24.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure sold_ unsold 30-09-24.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold _ unsold 06-12-24.pdf30 Jan 2025
Declaration about Commencement CertificateFile: DCC 06-12-24.pdf30 Jan 2025
Declaration about Commencement CertificateFile: NEW DECLARATION OF CC.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf30 Jan 2025
Copy of the legal title reportFile: output title (1).pdf2 Aug 2023
Declaration about Commencement CertificateFile: New declaration of CC.pdf24 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: new rera annexure a.pdf24 Jul 2023
Other - TechnicalFile: LAYOUT PLAN (1).pdf24 Jul 2023
Other - FinanceFile: Malad AMar letter.pdf17 Jul 2023
Layout approvalFile: AMAR LAYOUT.pdf11 Jul 2023
Copy of Layout Approval (in case of layout)File: AMAR LAYOUT.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Jul 2023
Building plan approvalFile: IOD.pdf7 Jul 2023
PAN CardFile: 5 Pan Card Ardhya Universal LLP.pdf7 Jul 2023
Details of encumbrances concerned to FinanceFile: finance and legal merge.pdf7 Jul 2023
Details of encumbrances concerned to LegalFile: finance and legal merge.pdf7 Jul 2023

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 19 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD EAST6,700+ in Mumbai Suburban

2 kmMALAD AMAR CO-OPERATIVE Completed 153Lapsed / revoked 91Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 405 registered projects within 2 km.

Builder: ARDHYA UNIVERSAL LLP

ARDHYA UNIVERSAL LLP has 2 registrations on MahaRERA, including MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD. and ARDHYA AURA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD. is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.?

The registered promoter entity is ARDHYA UNIVERSAL LLP, a partnership as per the filing. Its GSTIN 27ACAFA0982H1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.?

The professionals named in the filing: Architect: SUMEET ASSOCIATES; Architect: SWAPNIL PRABHAKAR AMBRE; Engineer: KRISHNA DEULAR; Chartered Accountant: PUNIT B GUPTA & ASSOCIATES; Chartered Accountant: YOJANA B GUPTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MALAD AMAR CO-OPERATIVE HOUSING SOCITY LTD. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.