ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Majestique Towers East Phase 3

Registration lapsed No litigation declared Residential / Group Housing project

Majestique Towers East Phase 3

By M/s. Sharad Shree Enterprises

RG-MH-17432 · RERA P52100028815 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
184 of 184Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Majestique Towers East Phase 3 is a Residential / Group Housing project by M/s. Sharad Shree Enterprises in Pune, Maharashtra, registered with MahaRERA as P52100028815 on 30 Mar 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 0 of the 184 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameMajestique Towers East Phase 3
  • TypeResidential / Group Housing
  • Location
    • GAT NO 1284 B PART wagholi
    • Wagholi
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028815
  • ReraGenie IDRG-MH-17432

Builder

  • NameM/s. Sharad Shree Enterprises
  • Entity typePartnership
  • GSTIN27ADKFS4651C1Z1
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMr Sachin Sharad Date, Smt Jayashree Sharad Date
  • Other registrations8 more →
  • Completed2 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

4 months past promisethis monthRegisteredMar 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on30 Mar 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed117 files

Current status

0%0 of 184 units booked

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING D1NA252392092
WING D2NA252392092

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

WING D165%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D265%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes35%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes40%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed176

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots176
Closed/Covered176
BuildingClosed/CoveredTotal
WING D18888
WING D28888

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,297 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI22694.84
Proposed, not sanctioned22,695 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE SATARA ROAD PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR PRAMOD DUBE
EngineerMR GULAB A BHILLARE
Chartered AccountantCA NATWARLAL TAWANI
Chartered AccountantSanket Bhandari and Associates
PartnerRole in project
M/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 3File: SSE FORM 3 Phase 3 Q4.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: TE - D1-D2-31-03-26.pdf25 Apr 2026
Form 1File: 18 D1 D2 Arch Phase 3 31-03-26.pdf25 Apr 2026
Form 2File: Form 2 Engg Cert Phase-3 D1D2 Q4.pdf25 Apr 2026
Form 1File: Form 1.pdf17 Feb 2026
Form 3File: SSE Phase 3 Q3_compressed.pdf17 Feb 2026
Form 2File: Form 2.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: D1-D2- Towers East - Dec 2025.pdf17 Feb 2026
Form 1File: Form 1 Ph 3 SSE.pdf6 Nov 2025
Form 2File: Form 2 Ph 3 SSE.pdf6 Nov 2025
Form 3File: Form 3 SSE Phase 3 Q2_compressed.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Tower East -D1 & D2.pdf6 Nov 2025
Form 1File: Form 1 Architect’s Certificate Ph 3.pdf22 Aug 2025
Form 2File: Form 2 Engineer’s Certificate Ph 3.pdf22 Aug 2025
Form 3File: SSE Form 3 Phase 3_compressed.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Ph 3 D1D2.pdf22 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSE FORM 3 Phase 3 _compressed (1).pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 24-25.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: D1-D2 mar 25_compressed.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf13 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A new.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_MT Ph 3.pdf12 Mar 2025
Proforma of Allotment letterFile: Allotment.pdf11 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf11 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Updated.pdf11 Mar 2025
Declaration about Commencement CertificateFile: CC_compressed.pdf11 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A new.pdf11 Mar 2025
Deviation Report with respect to Allotment letterFile: Devi Allotment.pdf11 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Devi Agreement.pdf11 Mar 2025
Proforma of Agreement for saleFile: Agreement.pdf11 Mar 2025
Declaration about Commencement CertificateFile: Form D.pdf10 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser J Date.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser S Date.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: RM Discloser.pdf5 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser MD_compressed.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: TE - D1-D2_compressed (1).pdf15 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SSE Phase 3 FORM 5 .pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SSE FORM 5 Phase III.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSE FORM 3 Phase 3 _compressed.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf22 Jan 2025
Layout approvalFile: Master Layout-1.pdf13 Nov 2024
Building plan approvalFile: 10 WING D1, D2_compressed.pdf13 Nov 2024
Building plan approvalFile: 11 WING D1, D2_compressed.pdf13 Nov 2024
Building plan approvalFile: M Layout Phase3D1D2.pdf13 Nov 2024
Copy of Layout Approval (in case of layout)File: Master Layout-1.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 10 WING D1, D2_compressed.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 11 WING D1, D2_compressed.pdf13 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: M Layout Phase3D1D2.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 16 Form -3 - Phase III_compressed.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 Phase-3 Form-3 8-08-24_compressed.pdf10 Aug 2024
Details of encumbrances concerned to FinanceFile: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf7 Aug 2024
Details of encumbrances concerned to LegalFile: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase III - Form -3 18-07-24_compressed.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D1 D2 ARCH Phase 3 (25-06-24).pdf2 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D1 D2 ENGG Phase 3 (25-06-24).pdf2 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ph III_compressed.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 3 - Arch Certificate - MAJ TOR - 29022024.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 - Engg Certificate - MAJ TOR - 29022024.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ph3 Form 3.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 3 Arch Certificate MAJ Towers 311223.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 Engg certificate 281023.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 Engg certificate 281023.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3 Engg certificate 311223.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Phase 3 Quality assurance FY 2022 23.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230413_D1 D2- Form 1-Architect Certificate - 281023.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 3_D1D2_Engineer Certificate_281023.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sharad Shree Enterprises-Majestique Towers-Phase-3-Form 3.pdf25 Nov 2023
Layout approvalFile: d1d2-hatching-majestique-towers-rera_Compressed.pdf19 Oct 2023
Copy of Layout Approval (in case of layout)File: d1d2-hatching-majestique-towers-rera_Compressed.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Towers East -D1.pdf26 May 2023
Disclosure of sold/ booked inventoryFile: Towers East -D2.pdf26 May 2023

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 not delivered by the promised date3 under way, not due yet
ProjectLocationFlatsStatusPromisedDelivered
Majestique Towers East Phase-7p52100078306Gat. No.1284B and New Gat No. 1284/B/1//Plot No.6, 24 M W DP Road, Wagholi, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA192OngoingDec 2028Not due yet
Majestique Towers East Phase 6p52100053786G.No. 1284B, wagholi, Wagholi, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA-OngoingDec 2028Not due yet
Majestique Towers East Phase 05p52100046709Gat No 1284 B, wagholi, wagholi, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA-OngoingDec 2027Not due yet
Majestique Towers East Phase 4p52100028813Wagholi Gat no. 1284 B, Wagholi, Wagholi, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA-CompletedJun 2026Jun 2025
Majestique Towers East Phase 3p52100028815WAGHOLI GAT NO 1284 B, GAT NO 1284 B PART wagholi, Wagholi, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA-OngoingJun 2026Not delivered
MAJESTIQUE TOWERS EAST PHASE 2p52100015183GAT NO. 1284 B, WAGHOLI, WAGHOLI, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA-CompletedDec 2022Feb 2022
MAJESTIQUE TOWERS EAST PHASE 1p52100015020GAT NO. 1284 B, WAGHOLI, WAGHOLI, WAGHOLI, Haveli, Pune, 412207, MAHARASHTRA-CompletedDec 2022Feb 2022

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Majestique Towers East Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi13,700+ in Pune

2 kmMajestique Towers East PCompleted 116Lapsed / revoked 116Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: M/s. Sharad Shree Enterprises

M/S. SHARAD SHREE ENTERPRISES has 9 registrations on MahaRERA, including MAJESTIQUE TOWERS EAST PHASE 1 and MAJESTIQUE TOWERS EAST PHASE 2. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Majestique Towers East Phase 3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Majestique Towers East Phase 3 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Majestique Towers East Phase 3?

The registered promoter entity is M/s. Sharad Shree Enterprises, a partnership as per the filing. Its GSTIN 27ADKFS4651C1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Majestique Towers East Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Majestique Towers East Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Majestique Towers East Phase 3?

The professionals named in the filing: Architect: MR PRAMOD DUBE; Engineer: MR GULAB A BHILLARE; Chartered Accountant: CA NATWARLAL TAWANI; Chartered Accountant: Sanket Bhandari and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Majestique Towers East Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Majestique Towers East Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Majestique Towers East Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.