Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAJESTIQUE MANHATTAN-D is a Residential / Group Housing project by Majestique Housing LLP in Pune, Maharashtra, registered with MahaRERA as P52100050958 on 16 May 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 78 of the 78 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameMAJESTIQUE MANHATTAN-D
- TypeResidential / Group Housing
- Location
- Opp. Lexicon school
- Wagholi
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050958
- ReraGenie IDRG-MH-89135
Builder
- NameMajestique Housing LLP
- Entity typePartnership
- GSTIN27AAVFM6361P1Z8
- PartnersManish Dwarkadas Maheshwari, Amit Anil Lalwani, BRB Realty LLP through it designated partner Nilesh Rajendra Bhattad
- Other registrations7 more →
- Completed7 of 8
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 May 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed66 files
Current status
Figures as on 10 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MAJESTIQUE MANHATTAN- D | NA | 13 | 12 | 78 | 0 | 78 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
MAJESTIQUE MANHATTAN- D: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MAJESTIQUE MANHATTAN- D | NA | Rs 19.80 cr | Rs 19.70 cr |
| - | NA | Rs 1.89 cr | Rs 1.76 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR ATIT ADMULWAR |
| Engineer | JW CONSULTANTS LLP |
| Chartered Accountant | SANKET BHANDARI AND ASSOCIATES |
| Chartered Accountant | Vinod Kumar Jindal |
| Partner | Role in project |
|---|---|
| Majestique Housing LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 6929/2012 | Honble CJSD Pune at Pune | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 (1).pdf | 10 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 (2).pdf | 10 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 (3).pdf | 10 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 UPDATE 11.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 UPDATE 11.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Housing D Building FORM 3 Q2_compressed.pdf | 16 Mar 2026 |
| Form 5 (FY 2024-2025)File: Majestique Housing LLP D Building FORM 5.pdf | 10 Dec 2025 |
| Form 1File: RERA FORM 1.pdf | 21 Aug 2025 |
| Form 2File: RERA FORM 2.pdf | 21 Aug 2025 |
| Form 3File: FORM 3 Manhattan D Q1_compressed.pdf | 21 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Manhattan-D Jun-25.pdf | 21 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Housing LLP D Building Q4 FORM 3_compressed.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: manhattan -D.pdf | 11 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: D - Manhattan.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Housing LLP D Building Q3 FORM 3_compressed.pdf | 13 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING D FORM 1 UPDATE 8.pdf | 12 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING D FORM 2 UPDATE 8.pdf | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Manhattan D.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Housing LLP D Building Q1 FORM 3_compressed.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Housing LLP D Building Q2.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 Majestique Housing LLP.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 D.pdf | 7 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 8 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate.pdf | 8 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A D 21-22.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING D FORM 1 UPDATE 3.pdf | 22 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING D FORM 1 UPDATE 4.pdf | 22 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING D FORM1 UPDATE2.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING D FORM 2 UPDATE 3.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING D FORM 2 UPDATE 4.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING D FORM2 UPDATE2.pdf | 22 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: WING D FORM 2A.pdf | 22 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Manhattan wing D-sold unsold inventory.pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3A CA.pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3A CA UPDATE4.pdf | 22 Feb 2024 |
| Layout approvalFile: LAYOUT.pdf | 15 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 15 Feb 2024 |
| Layout approvalFile: 1.PDF | 15 May 2023 |
| Building plan approvalFile: 2.PDF | 15 May 2023 |
| Building plan approvalFile: 3.PDF | 15 May 2023 |
| Copy of Layout Approval (in case of layout)File: 1.PDF | 15 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.PDF | 15 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3.PDF | 15 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed (7).pdf | 8 May 2023 |
| Copy of the legal title reportFile: STR 1.pdf | 4 May 2023 |
| Copy of the legal title reportFile: STR 2.pdf | 4 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC updated.pdf | 4 May 2023 |
| Declaration about Commencement CertificateFile: Format D Updated.pdf | 4 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Manhattan D.pdf | 4 May 2023 |
| Proforma of Agreement for saleFile: Agreement Updated.pdf | 4 May 2023 |
| Other - TechnicalFile: SHEET 3.pdf | 4 May 2023 |
| PAN CardFile: 1 PAN Card.pdf | 23 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Encum Legal.pdf | 23 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: Encum Finance.pdf | 23 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encum Legal.pdf | 23 Mar 2023 |
| Details of encumbrances concerned to LegalFile: Encum Finance.pdf | 23 Mar 2023 |
| Declaration in FORM BFile: Form B.pdf | 23 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Manish Sir.pdf | 23 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Rahul Sir.pdf | 23 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Amit Sir.pdf | 23 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Nilesh.pdf | 23 Mar 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 23 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Ac.pdf | 23 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation Allotment.pdf | 23 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement.pdf | 23 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MAJESTIQUE MANHATTAN-D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wagholi13,700+ in Pune
Filed coordinates, straight-line distance. 127 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: Majestique Housing LLP
Majestique Housing LLP has 8 registrations on MahaRERA, including Manhattan and MANHATTAN. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that MAJESTIQUE MANHATTAN-D shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MAJESTIQUE MANHATTAN-D is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAJESTIQUE MANHATTAN-D?
The registered promoter entity is Majestique Housing LLP, a partnership as per the filing. Its GSTIN 27AAVFM6361P1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAJESTIQUE MANHATTAN-D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAJESTIQUE MANHATTAN-D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAJESTIQUE MANHATTAN-D?
The professionals named in the filing: Architect: MR ATIT ADMULWAR; Engineer: JW CONSULTANTS LLP; Chartered Accountant: SANKET BHANDARI AND ASSOCIATES; Chartered Accountant: Vinod Kumar Jindal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAJESTIQUE MANHATTAN-D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback