Home / Browse projects / Mumbai Suburban, Maharashtra / MAJESTIC TOWERS

Registration lapsed No litigation declared Residential / Group Housing project

MAJESTIC TOWERS

By HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD

RG-MH-26356 · RERA P51800007283 · Last updated on MahaRERA portal: 17 Apr 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 70 months past the filed date
  • 120 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2020Possession promised70 months past this date
20 of 77Construction stages doneacross 7 buildings; furthest along: Slabs of Super Structure, 68%
120Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

MAJESTIC TOWERS is a Residential / Group Housing project by HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007283 on 17 Aug 2017. Possession was promised by 30 Dec 2020 and is now 70 months past that date. 120 complaints are on record with the regulator.

At a glance

Project

  • NameMAJESTIC TOWERS
  • TypeResidential / Group Housing
  • Location
    • Opp Mumncipal School
    • Nahur West
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007283
  • ReraGenie IDRG-MH-26356

Builder

  • NameHOUSING DEVELOPMENT AND INFRASTRUCTURE LTD
  • Entity typeCompany
  • Managing DirectorSARANG WADHAWAN
  • Other registrations13 more →
  • No longer live14 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

70 months past promisethis monthRegisteredAug 2017PromisedDec 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion30 Dec 2020
  • Revised completionNone
  • Buildings7 building records
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA450000
WING - BNA450000
WING - CNA450000
WING - DNA450000
WING A -PHASE 2-36th floorNA70000
WING B - PHASE 2 - 36th floorNA10000
WING C - PHASE 2- 36th floorNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 17 Apr 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Slabs of Super Structure, at 68%.

WING A48%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure27%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING - B52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING - C52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING - D53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure68%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A -PHASE 2-36th floor0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B - PHASE 2 - 36th floor0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C - PHASE 2- 36th floor0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered4
Open Space28
BuildingClosed/CoveredOpen SpaceTotal
WING A101
WING - B101
WING - C134
WING - D12526

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,914 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI79394.68
Proposed, not sanctioned76,812 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO G-01 893 NOTAN CHAMBERS BANDRA WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIndrajeet S. Deshmukh
EngineerH.M. Raje Structual Consultants Pvt. Ltd.
PartnerRole in project
HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD-

Complaints filed with MahaRERA120

Case no.ComplainantRespondentFiled
CC006000000001716Vinayak PalavM/s Housing Development & Infrastructure Ltd07/11/2017
CC006000000100325Majestic Consumer Welfare associationHousing Development and Infrastructure Limited28/07/2019
CC006000000012325GIRISH MATANGAYHDIL07/12/2017
CC006000000043978TAPAS BISWASHOUSING DEVELOPMENT AND INFRASTRUCTURE LIMITED02/04/2018
CC006000000056533Bhakthavathsala M ShettyHousing Development & Infrastructure Ltd. (HDIL)17/10/2018
CC006000000078434Bhupinder Kumar Sharma & Mrs. Sushma SharmaHousing Development & Infrastructure Ltd.,11/03/2019
CC006000000023201Rajeesh RajagopalanHousing Development & Infrastructure Ltd05/02/2018
CC006000000023727PUNIT DINESH SONIHOUSING DEVELOPEMENT AND INFRASTRUCTURE LTD. (HDIL)THROUGH ITS DIRECTOR SARANG WADHAWAN28/07/2018
CC006000000055018Ajay SharmaHousing Development and Infrastructure Limited through its Directors16/07/2018
CC006000000055047Bindu Jaiswal and Niranjan JaiswalHousing Development and Infrastructure Limited, represented through its directors21/07/2018
CC006000000055029Manjula Shome and Bhaskar ShomeHousing Development and Infrastructure Limited, represented through its directors21/07/2018
CC006000000055031Sujit Nair, Nisha Nair and Sumanthi RajgopalHousing Development and Infrastructure Limited, represented through its directors23/07/2018
CC006000000055050Karthik E S VenkataramHousing Development and Industrial Limited represented through its Directors13/08/2018
CC006000000055933Chandrakishore S KolindewalaHousing Development and Infrastructure Limited through their Directors27/08/2018
CC006000000055028Mahesh, Shaunak and Sheetal MarulkarHousing Development and Infrastructure Limited ,represented through its Directors19/07/2018
CC006000000055052Vasudevan RajgopalanHousing Development and Infrastructure Limited, represented through its directors13/08/2018
CC006000000055039Rakesh NambiarHousing Development and Infrastructure Limited represented through its directors18/07/2018
CC006000000055041Vivian Francis Austin Vaz and Lorna VazHousing Development and Infrastructure Limited through their directors18/07/2018
CC006000000055021Kshitij Amol JayakarHousing Development and Infrastructure Limited through their Directors17/07/2018
CC006000000055037Ashalata GhugeHousing Development and Infrastructure Limited, represented through its directors13/07/2018
CC006000000055040Sanjeev Mane and Hema ManeHousing Development and Infrastructure Limited, represented through its directors20/07/2018
CC006000000055057NARESH AND NEHA MOREHousing Development and Infrastructure Limited through their directors13/08/2018
CC006000000055931Vijay krishna Gaikwad and Malati Krishna GaikwadHousing Development and Infrastructure Limited through their Directors27/08/2018
CC006000000055044Ankita Thakkar and Gaurav ThakkarHousing Development and Infrastructure Limited, represented through its directors19/07/2018
CC006000000055053Pratibha Kedar and Prabhakar KedarHousing Development and Infrastructure Limited, represented through its directors23/07/2018
CC006000000055026Ashok Kumbla and Kalpana KumblaHousing Development and Infrastructure Limited,represented through its directors17/07/2018
CC006000000055045Prashant Mhatre and Seema MhatreHousing Development and Infrastructure Limited, represented through its directors27/07/2018
CC006000000055043Mamta Chaudhary and Manoj ChaudharyHousing Development and Infrastructure Limited, represented through its directors19/07/2018
CC006000000055033Shradha Kadam ,Ganpat Kadam and Prajesh KadamHousing Development Infrastructure Limited through their Directors18/07/2018
CC006000000055421SHIV GOVIND YADAV AND 4 OTHERSHousing Development Infrastructure Limited through its Directors13/08/2018
CC006000000055927AVINASH AND SHILPA RAUTHousing Development nad Infrastructure Limited through their Directors27/08/2018
CC006000000055477ANAND AND SHANTI KAUNDERHousing dDvelopment Infrastructure Limited through their Directors13/08/2018
CC006000000055055Chand Advani and Suresh AdvaniHousing Development and Industrial Limited represented through its Directors21/07/2018
CC006000000055289Lakshmi Iyer and Rajan IyerHousing Development Infrastructure Limited through their Directors23/07/2018
CC006000000055056Kasturchand Shah and Pankaj ShahHousing Development and Infrastructure Limited, represented through its directors19/07/2018
CC006000000055046Abhishek Angne and Vishnu AngneHousing Development and Infrastructure Limited, represented through its directors18/07/2018
CC006000000055903JATAN RAJVANSHI NAD SHIVANI GUPTAHOUSING DEVELOPMENT NAD INFRASTRUCTURE LIMITED THROUGH THEIR DIRECTORS23/08/2018
CC006000000055929Ajit Singh Daya Prakash and Jatan RajvanshiHousing Development and Infrastructure Limited through their Directors27/08/2018
CC006000000055058Prashant PathakHousing Development and Infrastructure Limited, represented through its directors17/07/2018
CC006000000055928Rajesh and Shumi ShettyHousing Development and Infrastructure Limited through their Directors27/08/2018
CC006000000055032Shashikant Ambadkar and Priti AmbadkarHousing Development and Infrastructure Limited, represented through its directors18/07/2018
CC006000000055038Sangeeta Menezes and Sheldon MenezesHousing Development and Infrastructure Limited, represented through its directors19/07/2018
CC006000000055070Derick BrittoHousing Development Infrastructure Limited through their Directors23/07/2018
CC006000000054568DINESH SITARAM HANDEHDIL Housing Development and Infrastructure Limited21/05/2018
CC006000000054665Niranjan Kapur and Anuradha KapurHousing Development and Infrastructure Limited29/05/2018
CC006000000055067Piyush RatanHousing Development Infrastructure Limited through its Directors21/08/2018
CC006000000055071Sandesh PawarHousing Development Infrastructure Limited through their Directors02/11/2018
CC006000000055082Keerti Paralkar and Smita ShuklaHousing Development Infrastructure Limited through its Directors14/09/2018
CC006000000055083Gurpreet Bal and Nilesh GhubadeHousing Development Infrastructure Limited through its Directors20/08/2018
CC006000000055084Vinod and Pankaja BholeHousing Development Infrastructure Limited through its Directors21/07/2018
CC006000000055085Sanket and Samidha IbhrampurkarHousing Development Infrastructure Limited through their Directors21/07/2018
CC006000000055990Dr Vaishali and Dr Nilratan ShendeHousing Development and Infrastructure Limited through their Directors21/09/2018
CC006000000055162A. Rajendiran and Shanthi RajendiranHousing Development Infrastructure Limited through their Directors20/07/2018
CC006000000055171Vinod DwivediHousing Development Infrastucture Limited through its Directors23/07/2018
CC006000000055359Vasundhra Narayanar and K.P SudarsanHousing Development Infrastructure Limited through their Directors13/08/2018
CC006000000055949Mrs. Jayshree Sachin Shenvi and Mr. Sachin ShenviHousing Development And Infrastructure Limited27/08/2018
CC006000000055966SANJAY ARVIND PAIHousing Development and Infrastructure Limited27/08/2018
CC006000000056112Maya and Kishan RijhwaniHousing Development and Infrastructure Limited through their directors14/09/2018
CC006000000056143SUNITA SARPOTDARHDIL10/09/2018
CC006000000056211Arvind and Shakuntala MangalHousing Development and Infrastructure Limited through their Directors24/09/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Nov 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - Majestic.pdf17 Apr 2019
Certificates of CA (Form 5)File: Majestic Towers - Form 5.pdf16 Apr 2019
Proforma of Allotment letterFile: AFSMajestic Towers rera.pdf12 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert Majestic.pdf14 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Sale Building CC.pdf11 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.PDF30 Jul 2017
Certificates of CA (Form 3)File: CA CERTIF - Majestic Towers - Part-1.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA CERTIF - Majestic Towers - Part-2.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA CERTIF - Majestic Towers - Part-3.pdf30 Jul 2017
Building plan approvalFile: 000 IOD.pdf29 Jul 2017
Layout approvalFile: 07 Wing D Typical Flr area DIA Wing D Refuge Terrace Flr area DIA.pdf29 Jul 2017
Layout approvalFile: 05 Wing B Typical Flr area DIA Wing B Refuge Terrace Flr Wing C Section.pdf29 Jul 2017
Layout approvalFile: 06 Wing C Typical Flr area DIA Wing C Refuge Terrace Wing D Section.pdf29 Jul 2017
Layout approvalFile: 03 Ground Plot area wing A Typical area Dia.pdf29 Jul 2017
Layout approvalFile: 04 Wing A Section Refuge Terrace Flr area DIA Wing B.pdf29 Jul 2017
Layout approvalFile: 01 Block Plan 1st Basement.pdf29 Jul 2017
Layout approvalFile: 02 1st to 5th 6th Podium 2nd Basement.pdf29 Jul 2017
PAN CardFile: PANCARD.pdf29 Jul 2017
Copy of the legal title reportFile: Majestic TC_Part-1.pdf29 Jul 2017
Copy of the legal title reportFile: Majestic TC_Part-2.pdf29 Jul 2017
Copy of the legal title reportFile: DOC SRA - Majestic Towers_Part-1.pdf29 Jul 2017
Copy of the legal title reportFile: DOC SRA - Majestic Towers_Part-2.pdf29 Jul 2017
Copy of the legal title reportFile: DOC SRA - Majestic Towers_Part-3.pdf29 Jul 2017
Copy of the legal title reportFile: DOC SRA - Majestic Towers_Part-4.pdf29 Jul 2017
Details of encumbrancesFile: Charge on Project Majestic Towers Nahur.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 01 Block Plan 1st Basement.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 02 1st to 5th 6th Podium 2nd Basement.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 03 Ground Plot area wing A Typical area Dia.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 04 Wing A Section Refuge Terrace Flr area DIA Wing B.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 05 Wing B Typical Flr area DIA Wing B Refuge Terrace Flr Wing C Section.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 06 Wing C Typical Flr area DIA Wing C Refuge Terrace Wing D Section.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 07 Wing D Typical Flr area DIA Wing D Refuge Terrace Flr area DIA.pdf29 Jul 2017
Building Plan Approval (IOD)File: 000 IOD.pdf29 Jul 2017
Declaration in FORM BFile: Form B - Majestic Towers 28072017.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - Majestic Towers.pdf29 Jul 2017
Proforma of Allotment letterFile: AL_AFS_Majestic_Towers.pdf29 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
HDIL INDUSTRIAL PARKBESIDES LAXMI MARBLES CHANDANSAR ROAD VILLAGE CHANDANSAR VIRAR EAST627CompletedApr 2017Late, Jul 2017
PREMIER EXOTICA IIPREMIER AUTO KIROL ROAD KURLA WEST MUMBAI 40007083CompletedJun 2013Late, Jun 2017
HARMONYNEW LINK ROAD GOREGAON WEST MUMBAI 400104221CompletedJun 2013Late, Jul 2017
PREMIER RESIDENCESPREMIER AUTO KURLA WEST MUMBAI - 4000701,087CompletedDec 2012Late, Mar 2017
GALAXY APARTMENTS WING ABEBHANDARY ESTATE KURLA EAST MUMBAI 400024314CompletedDec 2011Late, Jun 2017
HDIL RESIDENCY PARKOPP YAZOO PARK NARANGI BYPASS ROAD VILLAGE DONGRE VIRAR WEST1,199CompletedAug 2011Late, Oct 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAJESTIC TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nahur West6,700+ in Mumbai Suburban

2 kmMAJESTIC TOWERSCompleted 89Lapsed / revoked 63Other 119Dot size: filed unitsN

Filed coordinates, straight-line distance. 271 registered projects within 2 km.

Builder: HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD

HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD has 14 registrations on MahaRERA, including THE NEST and PREMIER EXOTICA I. Its filings disclose 6 earlier MahaRERA projects: declares 0 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that MAJESTIC TOWERS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MAJESTIC TOWERS is delayed beyond 30 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAJESTIC TOWERS?

The registered promoter entity is HOUSING DEVELOPMENT AND INFRASTRUCTURE LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAJESTIC TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MAJESTIC TOWERS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MAJESTIC TOWERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAJESTIC TOWERS?

The professionals named in the filing: Architect: Indrajeet S. Deshmukh; Engineer: H.M. Raje Structual Consultants Pvt. Ltd.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAJESTIC TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAJESTIC TOWERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAJESTIC TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.