ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Mainland Valencia Phase II

Completed No litigation declared Commercial project

Mainland Valencia Phase II

By MAINLAND BUILDERS LLP

RG-MH-15344 · RERA P52100024109 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

Mainland Valencia Phase II is a Commercial project by MAINLAND BUILDERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100024109 on 21 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2027. The completion date has moved by 48 months from the original filing.

At a glance

Project

  • NameMainland Valencia Phase II
  • TypeCommercial
  • Location
    • KESANAND ROAD
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100024109
  • ReraGenie IDRG-MH-15344

Builder

  • NameMAINLAND BUILDERS LLP
  • Entity typePartnership
  • PartnersKEDAR VIRENDRA SHERLEKAR, ASHOK TARACHAND SAMANT, VIJAY TARACHAND SAMANT, DHANESH TARACHAND SAMANT
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2020First promiseDec 2023Revised toDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jan 2020
  • Promised completion30 Dec 2027
  • Revised completionRevised to 30 Dec 2027 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mainland Business Hub Tower CNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Mainland Business Hub Tower C: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered67
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,534 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12690.0
Proposed, not sanctioned4,590 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch9/2, Kalpataru Garden, Boatclub Road, Pune - 411001

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
MAINLAND BUILDERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024855Dec 2023 → Dec 2027

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 53.57% allottees for purpose of extension of RERA registration period of the said project.

Litigation declared1

CaseCourtStatus
1011/2016Civil Judge Senior Division PuneReview of Case in Court

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Aug 2023

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Mainland Valencia Phase II as on Mar 26.pdf20 Apr 2026
Form 2File: Form 2 - Mainland Valencia Phase II as on Mar 26.pdf20 Apr 2026
Form 3File: Form 3 - Mainland Valencia Phase II as on Mar 26.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circuler 29 - Mainland Valencia Phase II as on Mar 26.pdf20 Apr 2026
Form 1File: Form 1-Mainland Valencia Phase II as on June 2025.pdf17 Feb 2026
Form 2File: Form 2-Mainland Valencia Phase II as on June 2025.pdf17 Feb 2026
Form 3File: Form 3-Mainland Valencia Phase II as on June 2025_compressed.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mainland Valencia Phase II as on June 2025.pdf17 Feb 2026
Form 1File: Form 1 - Mainland Valencia Phase II as on Sep 2025.pdf17 Feb 2026
Form 2File: Form 2 - Mainland Valencia Phase II as on Sep 2025.pdf17 Feb 2026
Form 3File: Form 3 - Mainland Valencia Phase II as on Sep 2025.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Mainland Valencia Phase II as on Sep 2025.pdf17 Feb 2026
Form 1File: Form 1 - Mainland Valencia Phase II as on Dec 2025.pdf17 Feb 2026
Form 2File: Form 2 - Mainland Valencia Phase II as on Dec 2025.pdf17 Feb 2026
Form 3File: Form 3 - Mainland Valencia Phase II as on Dec 2025.pdf17 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circuler 29 - Mainland Valencia Phase II as on Dec 2025.pdf17 Feb 2026
OthersFile: CC_merged.pdf17 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Mainland Valencia Phase II as on June 2025.pdf20 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Mainland Valencia Phase II as on June 2025_compressed.pdf20 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Mainland Valencia Phase II as on June 2025.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3 Signed_11zon (1).pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form no 5 2019-20 (1).pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form no 5 2021-22 (1).pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no 3_11zon.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 23-24.pdf18 Oct 2024
Declaration in FORM BFile: Affidavit_11zon.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2024.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A FY 2019-20.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A FY 2020-21.pdf15 Oct 2024
CERSAI detailsFile: CERSAI Declaration.pdf15 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A FY 2021-22.pdf15 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A FY 2023-24.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 .pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 .pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 2.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1.pdf28 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3.pdf28 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3.pdf28 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: March 2023 2A.pdf15 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mainland Valencia Phase II.pdf25 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate.pdf16 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form no 4.pdf16 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5 Phse II.pdf19 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form No 5 Phse II.pdf13 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form no 2.pdf5 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3.pdf5 Sep 2022
OtherFile: Self Declaration for change of cost.pdf5 Sep 2022
Declaration about Commencement CertificateFile: declaration about commencement certificate as per circular no 32.pdf1 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Mainland valencia Phase II From No 5 (1).pdf20 Aug 2021
Building plan approvalFile: Plan 1 revised.pdf13 Aug 2021
Building plan approvalFile: Plan 2 Revised.pdf13 Aug 2021
Building plan approvalFile: Plan 3 Revised.pdf13 Aug 2021
Building plan approvalFile: Plan 4 Revised.pdf13 Aug 2021
Building plan approvalFile: Plan 5 Revised.pdf13 Aug 2021
Layout approvalFile: Revised Layout.pdf13 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised Layout.pdf13 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 1 revised.pdf13 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 Revised.pdf13 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 Revised.pdf13 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 Revised.pdf13 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan 5 Revised.pdf13 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Revise Commencement C tower 29-07-21.pdf13 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Plan 1 revised.pdf13 Aug 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mainland Valencia Phase IGat 887 888 889 890 Village Wagholi Pune 412207186CompletedDec 2018Jul 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mainland Valencia Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

Builder: MAINLAND BUILDERS LLP

Mainland Builders LLP has 2 registrations on MahaRERA, including MAINLAND VALENCIA and Mainland Valencia Phase II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mainland Valencia Phase II is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mainland Valencia Phase II?

The registered promoter entity is MAINLAND BUILDERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mainland Valencia Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mainland Valencia Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Mainland Valencia Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mainland Valencia Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mainland Valencia Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.