ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Mahindra Happinest Palghar Phase - III

Completed No litigation declared Residential / Group Housing project

Mahindra Happinest Palghar Phase - III

By MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)

RG-MH-92384 · RERA P99000016671 · Last updated on MahaRERA portal: 2 Oct 2022

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2022Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
3Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Mahindra Happinest Palghar Phase - III is a Residential / Group Housing project by MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) in Palghar, Maharashtra, registered with MahaRERA as P99000016671 on 5 Jun 2018. The registration is recorded completed; possession was promised by 30 Sep 2022. 3 complaints are on record with the regulator.

At a glance

Project

  • NameMahindra Happinest Palghar Phase - III
  • TypeResidential / Group Housing
  • Location
    • Baswat pada
    • Nandore
    • Palghar
    • 400404
  • Pincode400404
  • RERA no.P99000016671
  • ReraGenie IDRG-MH-92384

Builder

  • NameMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)
  • Entity typeCompany
  • DirectorsArvind Subramanian, Ameet Hariani, Dr Anish Shah, Ms Amrita Chowdhury, Mr Anuj Puri, Ms Asha Kharga, Ms Asha Kharga, Ms Rucha Nanavati, Ms Asha Kharga, Ms Amrita Chowdhury, Ms Rucha Nanavati, Arvind Subramanian and 4 more
  • Other registrations8 more →
  • Completed6 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2018PromisedSep 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Jun 2018
  • Promised completion30 Sep 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block no 2NA50000
Block 10NA50000
Block 11NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 2 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

Block no 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Block 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Block 1182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,331 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6181.02
Proposed, not sanctioned6,181 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchkamala mill compound lower parel mumbai 13

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshok B Lall Architects
EngineerK C Shah Consultants
PartnerRole in project
MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000171691Mahindra Happinest Developers LimitedManali Uday Dholakia and Anr12/12/2019
CC12503723MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)Jonathan Braganza22/10/2025
CC12503732MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)Swetha Mohan23/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Apr 2022

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Mahindra Happinest Palghar Project 1 Phase III.pdf2 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Palghar 1 _Phase 3_Mar 2022.pdf29 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Palghar 1 _Phase 3_Mar 2022-signed.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar 1 - Mar'22-signed.pdf29 Jul 2022
Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE Palghar 1 - Q4-signed.pdf29 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar 1 - Dec'21.pdf1 Apr 2022
Certificates of CA (Form 3)File: Palghar Project 1 Phase III Dec'21.pdf1 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Palghar B1, B2, B3_compressed.pdf1 Apr 2022
Architect’s Certificate on Completion of Project (Form 4)File: ABLA_Form 4 - Phase 3 - B10, 11.pdf1 Apr 2022
Architect’s Certificate on Completion of Project (Form 4)File: ABLA_Phase-3.pdf1 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Phase III.pdf12 Jan 2022
Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE Palghar 1 Q3 (1).pdf12 Jan 2022
Declaration about Commencement CertificateFile: CC Declare HP1.pdf21 Dec 2021
Disclosure of sold/ booked inventoryFile: 3_merged.pdf21 Dec 2021
CERSAI detailsFile: CERSAI Details.pdf18 Dec 2021
Declaration about Commencement CertificateFile: CC Order HP1.pdf10 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE Palghar 1 Q2.pdf10 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Phase III Form 5 Palghar.pdf10 Dec 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC B10 B11.pdf10 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Palghar 1_Phase 3_SEP 2021.pdf2 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar 1 - Sep'21.pdf2 Nov 2021
Form 2AFile: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE Palghar 1 Q2.pdf2 Nov 2021
Certificates of CA (Form 3)File: Palghar Project 1 Phase III Sep 21.pdf2 Nov 2021
Certificates of CA (Form 3)File: Form 3 HP - 1 PH3.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 HP- 1 PH3.pdf30 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar P1 - Jun'21.pdf30 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Phase III.pdf19 Aug 2021
Form 2AFile: QAC - JUNE - HP1.pdf19 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Phase III.pdf1 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar P1 Phase III Mar-21.pdf1 Jun 2021
Certificates of CA (Form 3)File: Palghar Project 1 Phase III Mar 21.pdf1 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar P1 Phase III Dec-20.pdf5 Feb 2021
Certificates of CA (Form 3)File: Palghar 1 Phase 3 Dec'20 - Min.pdf5 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Phase III.pdf20 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Phase III corrected.pdf8 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Palghar Phase 3.pdf5 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar P1 Phase III Sep-20.pdf1 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate Palghar P1 Phase III Sep-20.pdf10 Nov 2020
Certificates of CA (Form 3)File: Palghar Project 1 Phase III Sep 20.pdf10 Nov 2020
Certificates of CA (Form 3)File: Palghar Project 1 Phase III Jun'20.pdf5 Aug 2020
Certificates of CA (Form 3)File: Palghar Project 1 Phase III Mar'20.pdf21 May 2020
Form 2AFile: Phese 3.pdf17 Feb 2020
Certificates of CA (Form 3)File: Palghar RERA Certificate Dec 2019 3.pdf3 Feb 2020
Certificates of CA (Form 3)File: Form 3 - Palghar Phase III.pdf1 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: Phase III Form 5 Palghar.pdf27 Sep 2019
Certificates of CA (Form 3)File: Palghar Projrct Phase III - July 2019.pdf30 Jul 2019
Form 2AFile: Form 2 A FORMAT - Phase 3.pdf11 Jan 2019
Building plan approvalFile: Building_Plan_approval_CC.pdf24 May 2018
Layout approvalFile: layout _palghar.pdf24 May 2018
PAN CardFile: PAN MHDL.PDF24 May 2018
Copy of the legal title reportFile: Tiltle Certificate _Palghar _2_1_2018_2-ilovepdf-compressed-ilovepdf-compressed.pdf24 May 2018
Details of encumbrancesFile: Tiltle Certificate _Palghar _2_1_2018_2-ilovepdf-compressed-ilovepdf-compressed.pdf24 May 2018
Copy of Layout Approval (in case of layout)File: layout _palghar.pdf24 May 2018
Building Plan Approval (IOD)File: Building_Plan_approval_CC.pdf24 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Building_Plan_approval_CC.pdf24 May 2018
Declaration in FORM BFile: Form B.pdf24 May 2018
Certificates of CA (Form 3)File: CA Certificate Phase III.PDF24 May 2018
Proforma of Allotment letterFile: AFS Palghar.pdf24 May 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Happinest Palghar Project - 1Mahindra Happinest Developers Ltd Village Nandore Gut No 158 183 P 183P plot 1 Pin 401404293CompletedDec 2020Dec 2020

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahindra Happinest Palghar Phase - III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nandore3,200+ in Palghar

Builder: MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)

MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) has 9 registrations on MahaRERA, including Mahindra Happinest Palghar Phase - I and Mahindra Happinest Palghar Phase - II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Mahindra Happinest Palghar Phase - III is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahindra Happinest Palghar Phase - III?

The registered promoter entity is MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD), a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahindra Happinest Palghar Phase - III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Mahindra Happinest Palghar Phase - III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Mahindra Happinest Palghar Phase - III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahindra Happinest Palghar Phase - III?

The professionals named in the filing: Architect: Ashok B Lall Architects; Engineer: K C Shah Consultants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahindra Happinest Palghar Phase - III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahindra Happinest Palghar Phase - III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahindra Happinest Palghar Phase - III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.