Home / Browse projects / Thane, Maharashtra / Mahindra Happinest Kalyan Project A
Mahindra Happinest Kalyan Project A
By MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)
RG-MH-14413 · RERA P51700022981 · Last updated on MahaRERA portal: 8 Oct 2024
Source: official MahaRERA filing
Red flags
- 4 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mahindra Happinest Kalyan Project A is a Residential / Group Housing project by MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) in Thane, Maharashtra, registered with MahaRERA as P51700022981 on 8 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2024. 4 complaints are on record with the regulator.
At a glance
Project
- NameMahindra Happinest Kalyan Project A
- TypeResidential / Group Housing
- Location
- Kalyan Bhiwandi Road
- Bhiwandi Kalyan Junction
- Ranjnoli
- Bhiwandi
- Thane
- 421311
- Pincode421311
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700022981
- ReraGenie IDRG-MH-14413
Builder
- NameMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)
- Entity typeCompany
- DirectorsArvind Subramanian, Ameet Hariani, Dr Anish Shah, Ms Amrita Chowdhury, Mr Anuj Puri, Ms Asha Kharga, Ms Asha Kharga, Ms Rucha Nanavati, Ms Asha Kharga, Ms Amrita Chowdhury, Ms Rucha Nanavati, Arvind Subramanian and 4 more
- Other registrations8 more →
- Completed6 of 9
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Nov 2019
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings3 building records
- Documents filed93 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | NA | 15 | 0 | 0 | 0 | 0 |
| Tower 2 | NA | 15 | 0 | 0 | 0 | 0 |
| Tower 6 | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 8 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
Tower 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower 682%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sandeep Shikre & Associates |
| Engineer | Diga Consultant and Valuers LLP |
| Engineer | K C Shah Consultants |
| Chartered Accountant | A B D AND CO LLP |
| Chartered Accountant | P G BHAGWAT LLP |
| Partner | Role in project |
|---|---|
| MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 247/2020 | Civil Court Junior Division Bhiwandi | Pending |
| 29/2021 | Court of District Judge at Thane | Pending |
| 2/2021 | Civil Judge Senior Division Thane Link Court Bhiwandi | Pending |
| 443/2021 | Tahsildar and Magistrate Office Bhiwandi | Pending |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000195016 | M/s Swastik Real Estate Developers | Mahindra HappinestDevelopers Limited | 25/11/2020 |
| CC006000000196458 | MUSADDIQUE ISMAIL POKAR | Mahindra Happinest Developers Limited | 23/03/2021 |
| CC006000000197461 | Mr. Pratik Ramanand Shetty | Mahindra Happinest Developers Limited | 02/07/2021 |
| CC006000000199030 | Ashutosh Subhash Gupta | MAHINDRA HAPPINEST KALYAN | 13/11/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jan 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Nov 2023
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Kalyan 1 Project A.pdf | 8 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Kalyan 1 Project A.pdf | 8 Oct 2024 |
| OtherFile: MHDL - Letter to MahaRERA relates to Authorised Signatories.pdf | 31 Jul 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 HK-1 A - FY24-Q1 170823.pdf | 1 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HK1 - Phase A OC.pdf | 28 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HK A_Aug 23_RERA_Ar Certificate-T01,02,06.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HK A_Aug 23_RERA_Ar Certificate-T01,02,06.pdf | 17 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HK A_Aug 23_RERA_Ar Certificate-T01,02,06_signed.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK-1 A - FY24-Q2_signed.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK-1 A - FY24-Q2_signed.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate Kalyan A Sept 23_signed.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate Kalyan A Sept 23_signed.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 HK A MHDL Final.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HK A_June23_RERA_Ar Certificate-T01,02,06_signed.pdf | 18 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK-1 - FY24-Q1_signed.pdf | 18 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan_A_Certificate_Jun_23_signed-compressed.pdf | 18 Jul 2023 |
| Other - FinanceFile: PGB_MLDL RERA letter.pdf | 18 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15_HK A_Mar 23_RERA_Ar Certificate-T01,02,06_signed.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 HK-1 - FY23-Q4_signed.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 HK-1 - FY23-Q4_signed.pdf | 17 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer's Certificate for Quality and Assurance signed - HK-1 Q4 -FY23.pdf | 17 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: kalyan A Cert Mar23_signed_11zon.pdf | 17 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK PrA PrB - Dec'22_signed.pdf | 18 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KALYAN A_dec22_signed.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HK A_December 22_RERA_Ar Certificate-T01,02,06_signed.pdf | 17 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_HK A_Sept 22_RERA_Ar Certificate-T01,02,06-signed_compressed.pdf | 18 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 001 Kalyan Revise _Form 2 Engg Certificate HK RERA Project A Project B_Sep'22-signed.pdf | 18 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Certificate HK PA _Sep22-signed_compressed.pdf | 18 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Kalyan Project A.pdf | 30 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12_HK A_June 22_RERA_Ar Certificate-T01,02,06 (1)-signed.pdf | 20 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK RERA Project A Project B - Jun'2022 R2-signed.pdf | 20 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan A Cer Jun2022-signed_compressed.pdf | 20 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK - Jun'22.pdf | 19 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 HK RERA Project A Project B - Mar'2022-signed.pdf | 18 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form-2 HK_compressed.pdf | 18 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 HK RERA Project A Project B - Mar'2022-signed.pdf | 18 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12_HK A_June 22_RERA_Ar Certificate-T01,02,06 (1)-signed.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan Project A Form 3-Mar'22 - Name changed-Promotor signed 1mb.pdf | 12 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11_HK A_Mar 22_RERA_Ar Certificate-T01,02,06-Promotors signed-1mb.pdf | 9 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Quality CERTIFICATE FOR QUATITY ASSURANCE_MAR-22-signed.pdf | 9 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 09_HK A_Dec_RERA_Ar Certificate-T01,02,06-PROMOTORS SIGN.pdf | 23 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate Kalyan Project A Form 3-Dec'21 v1-signed_Promotor Sign (1).pdf | 23 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HK - A.pdf | 12 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality CERTIFICATE FOR QUATITY ASSURANCE_DEC-21.pdf | 12 Jan 2022 |
| Declaration about Commencement CertificateFile: CC Declar HK.pdf | 21 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: HK - Project A -1_merged.pdf | 21 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: HK - A - Form 5.pdf | 21 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: HK - A - Form 5.pdf | 21 Dec 2021 |
| CERSAI detailsFile: CERSAI Details.pdf | 18 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10_HK A_Sept 21_RERA_Ar Certificate-T01,02,06_compressed.pdf | 29 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: HK - Sep'21.pdf | 29 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan Project-A Sept-21_compressed.pdf | 29 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Kalyan Happinest Project-A_compressed.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 01 Kalyan A Report_compressed.pdf | 30 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate HK RERA Project A - Mar-21.pdf | 1 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE FOR QUATITY ASSURANCE_Mar-21.pdf | 1 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan Happinest Project-A.pdf | 1 Jun 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Engineers certificate HK RERA Project A - Mar-21.pdf | 1 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate HK RERA Project A - Dec-20.pdf | 30 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan A Dec'20 Certificate-min.pdf | 30 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan A Dec'20 Certificate-min.pdf | 30 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan A Dec'20 Certificate-min.pdf | 30 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan A Dec'20 Certificate-min.pdf | 30 Jan 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan A Dec'20 Certificate-min.pdf | 30 Jan 2021 |
| Proforma of Allotment letterFile: Revised AFS Happinest Kalyan Project A.pdf | 25 Jan 2021 |
| Layout approvalFile: Master Layout.pdf | 10 Jan 2021 |
| Building plan approvalFile: Master Layout.pdf | 10 Jan 2021 |
| Copy of Layout Approval (in case of layout)File: Master Layout.pdf | 10 Jan 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Master Layout.pdf | 10 Jan 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Final CC in MHDL's Name.pdf | 10 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Kalyan Project A compressed.pdf | 8 Dec 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05_HK A_RERA_Ar Certificate-T01,02,06_compressed.pdf | 4 Dec 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate HK RERA Project A - Sep-20.pdf | 1 Dec 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers certificate HK RERA Project A - Sep-20.pdf | 10 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan Happinest Sept20_ A.pdf | 10 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kalyan_Happinest_Project A(1).pdf | 5 Aug 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Project A.pdf | 21 May 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: certificate_Project A.pdf | 3 Feb 2020 |
| OtherFile: MHDL DECLARATION.pdf | 6 Nov 2019 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 4 Nov 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Happinest Palghar Project - 1 | Mahindra Happinest Developers Ltd Village Nandore Gut No 158 183 P 183P plot 1 Pin 401404 | 293 | Completed | Dec 2020 | Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
Keep Mahindra Happinest Kalyan Project A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhiwandi Kalyan Junction7,600+ in Thane
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
Mahindra Happinest Kalyan-2 Project A
Mahindra Lifespace Developers limited
Hiranandani Woodspring Bldg A-Oakwood Bldg B-B
Golden Mile Builders LLP
Magus City Tower 1 Selene
MAGUS INFRATECH PRIVATE LIMITED
ATLANTIC
RIDDHI SIDDHI ENTERPRISES
Magus City Tower 2 Lunar
Magus Infra Tech Private Limited
KALYAN VATIKA
KALYAN AVENUE
See every Thane project, with the district possession charts
Builder: MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)
MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) has 9 registrations on MahaRERA, including Mahindra Happinest Palghar Phase - I and Mahindra Happinest Palghar Phase - II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mahindra Happinest Kalyan Project A is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mahindra Happinest Kalyan Project A?
The registered promoter entity is MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD), a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mahindra Happinest Kalyan Project A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Mahindra Happinest Kalyan Project A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Mahindra Happinest Kalyan Project A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mahindra Happinest Kalyan Project A?
The professionals named in the filing: Architect: Sandeep Shikre & Associates; Engineer: Diga Consultant and Valuers LLP; Engineer: K C Shah Consultants; Chartered Accountant: A B D AND CO LLP; Chartered Accountant: P G BHAGWAT LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mahindra Happinest Kalyan Project A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback