Mahavir Sarvoday Plaza
RG-MH-27935 · RERA P51700025161 · Last updated on MahaRERA portal: 3 Feb 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mahavir Sarvoday Plaza is a Others project by VIRA THEATRES PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700025161 on 19 Mar 2020. The registration is recorded completed; possession was promised by 30 Mar 2026.
At a glance
Project
- NameMahavir Sarvoday Plaza
- TypeOthers
- Location
- M G Road
- Dombivli West
- Chavindra
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700025161
- ReraGenie IDRG-MH-27935
Builder
- NameVIRA THEATRES PVT LTD
- Entity typeCompany
- Managing DirectorKEKIN MORARJI VIRA
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Mar 2020
- Promised completion30 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Mahavir Sarovday Plaza | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Mahavir Sarovday Plaza: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 3 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| VIRA THEATRES PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Mar 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 15 Oct 2024
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: MSP_ FORM 4_Architeqn-Icon_Certificate.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSP FORM1 02072024.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 MSP RERA Form 3 300624.pdf | 2 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 MSP RERA Form 3 020724.pdf | 2 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 MSP RERA Form 2 300624.pdf | 2 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5_FY 23-24.pdf | 2 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 MSP FORM 1 30062024.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSP_Form1_31032024.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed.pdf | 7 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_Form2_31032024.pdf | 7 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MSP_OC_02072024.pdf | 15 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: MSP_ FORM 4_Architect.pdf | 9 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 MSP 22-23.pdf | 10 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Partoccupationcertificate_24012024.pdf | 10 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 28032024_OCletter.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_MSP_FORM 1 _31122022.pdf | 26 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_MSP_FORM 1_31032023.pdf | 26 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_MSP_FORM 1_30062023.pdf | 26 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_MSP_FORM 1_30092023.pdf | 26 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5_MSP_FORM 1_31122023.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_RERA_Form 2_311222.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_RERA_Form 2_311222.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_RERA_Form 2_310323.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_RERA_Form 2_300623.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_RERA_Form 2_300923.pdf | 26 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MSP_RERA_Form 2_311223.pdf | 26 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSP_RERA_Form 3_311222.pdf | 26 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSP_RERA_Form 3_310323.pdf | 26 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSP_RERA_Form 3_300623.pdf | 26 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSP_RERA_Form 3_300923.pdf | 26 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MSP_RERA_Form 3_311223.pdf | 26 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 MSP 21-22.pdf | 21 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 MSP 17-18.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 MSP 20-21.pdf | 18 Jan 2023 |
| CERSAI detailsFile: MCHI Membership.pdf | 19 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MSP CA CERTIFICATE.pdf | 19 Oct 2022 |
| Building plan approvalFile: sanction plan 4 Pages.pdf | 18 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: sanction plan 4 Pages.pdf | 18 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate revised_02082022.pdf | 18 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_MSP_RERA.pdf | 18 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_MSP_30092022_compressed.pdf | 18 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MSP CA CERTIFICATE.pdf | 18 Oct 2022 |
| Building plan approvalFile: revised sanction plan_1.PDF | 23 Jun 2022 |
| Building plan approvalFile: revised sanction plan_2.PDF | 23 Jun 2022 |
| Building plan approvalFile: revised santion plan_3.PDF | 23 Jun 2022 |
| Building plan approvalFile: sanction letter_17022022_compressed.pdf | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: revised sanction plan_1.PDF | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: revised sanction plan_2.PDF | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: revised santion plan_3.PDF | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: sanction letter_17022022_compressed.pdf | 23 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2_31032022.pdf | 23 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Building Wise-min.pdf | 31 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MSP_Architect's Certificate-completion of work_08072021_compressed.pdf | 28 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A_Mahavir Sarvoday Plaza_March 2020-min.pdf | 28 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A_Mahavir Sarvoday Plaza_ March 2021-min.pdf | 28 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Msp rera form 5 18-19.pdf | 28 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Msp rera form 5 19-20.pdf | 28 Aug 2021 |
| Copy of the legal title reportFile: MSP-TITLE CERTIFICATE-min.pdf | 18 Mar 2020 |
| Details of encumbrancesFile: MSP-encumbrance certificate-min.pdf | 18 Mar 2020 |
| PAN CardFile: VTPL PAN.pdf | 28 Feb 2020 |
| Layout approvalFile: MYSCAN_20191012_0002.pdf | 17 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20191012_0002.pdf | 17 Feb 2020 |
| Proforma of Allotment letterFile: Agreement for sale final.pdf | 17 Feb 2020 |
| Proforma of Allotment letterFile: allotment letter.pdf | 17 Feb 2020 |
| Building plan approvalFile: MYSCAN_20191012_0002.pdf | 12 Feb 2020 |
| Building plan approvalFile: MYSCAN_20191012_0003.pdf | 12 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20191012_0002.pdf | 12 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20191012_0003.pdf | 12 Feb 2020 |
| Declaration in FORM BFile: Declaration form B_compressed.pdf | 12 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE_compressed.pdf | 12 Feb 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Form 2_compressed.pdf | 12 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Form 3_compressed.pdf | 12 Feb 2020 |
| Building plan approvalFile: MYSCAN_20191012_0004.pdf | 5 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20191012_0004.pdf | 5 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: revised commencement certificate.pdf | 5 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
Keep Mahavir Sarvoday Plaza on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dombivli West7,600+ in Thane
Filed coordinates, straight-line distance. 313 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: VIRA THEATRES PVT LTD
VIRA THEATRES PVT LTD has 2 registrations on MahaRERA, including MAHAVIR HEIGHTS NX and Mahavir Sarvoday Plaza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Mahavir Sarvoday Plaza is delayed beyond 30 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mahavir Sarvoday Plaza?
The registered promoter entity is VIRA THEATRES PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mahavir Sarvoday Plaza?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mahavir Sarvoday Plaza?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in Mahavir Sarvoday Plaza?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback