MAHALAXMI PLAZA

By SHRIRAM DEVELOPERS

RG-MH-03709 · RERA P50500031242 · Last updated on MahaRERA portal: 7 Feb 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 21 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jan 2025Possession promised21 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

MAHALAXMI PLAZA is a Others project by SHRIRAM DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500031242 on 11 Oct 2021. Possession was promised by 30 Jan 2025 and is now 21 months past that date. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameMAHALAXMI PLAZA
  • TypeOthers
  • Location
    • NEW SUBHEDAR LAYOUT WARD NO 20
    • SAKKARDARA STREET SCHEME
    • MOUJZA : SAKKARDARA NAGPUR
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440024
  • Pincode440024
  • RERA no.P50500031242
  • ReraGenie IDRG-MH-03709

Builder

  • NameSHRIRAM DEVELOPERS
  • Entity typePartnership
  • PartnerPRAKASH PILAJI THAKRE
  • Other registrations9 more →
  • Completed6 of 10
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

21 months past promisethis monthRegisteredOct 2021First promiseJan 2024Revised toJan 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Oct 2021
  • Promised completion30 Jan 2025
  • Revised completionRevised to 30 Jan 2025 (originally 31 Jan 2024)
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAHALXMI PLAZANA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

MAHALXMI PLAZA: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area557 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1593.22
Proposed, not sanctioned3 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch332 SUBHEDAR LAYOUT, HUDKESHWAR ROAD, NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS HUNDRED%DESIGN
EngineerPRIYANKA MEGHE
Chartered AccountantCA Akhilesh Pathak
PartnerRole in project
SHRIRAM DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500018828Jan 2024 → Jan 2025

Reason as filed by the promoterDELAY IN FINAL COMPLETION AND RECEIPT OF OCCUPANCY CERTIFICATE

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23_compressed.pdf7 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Dec21.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: March - 22 Form -2A.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sept22.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sept22.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Dec22.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: March - 23 F2A.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sept23.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: june - 23 F2A.pdf8 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Prakash Thakre DoI.pdf8 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sanjay Mahakalkar DoI.pdf8 Nov 2023
Proforma of Agreement for saleFile: Sale Deed_compressed.pdf8 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Ac.pdf8 Nov 2023
Deviation Report with respect to Allotment letterFile: Allotment Letter Deviation.pdf8 Nov 2023
Deviation Report with respect to model copy of AgreementFile: Agreemnt to Sell Deviation.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec- 21.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March - 22.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jun - 22.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep - 22.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec - 22.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March - 23.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: jun - 23.pdf7 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep - 23.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Dec21 F2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar22.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sept22 F2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec22.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mar23 F2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jun23 F2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun22.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep23.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec21.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March - 22 F3.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jun- 22 F3.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sept - 22 F3.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec - 22 F3.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March - 23 F3.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jun- 23 F3.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept - 23 F3.pdf7 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Report Fy 22-23.pdf7 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit report ft 21-22.pdf7 Nov 2023
Building plan approvalFile: SANCTION STAMP ON SANCTION MAP.pdf30 Sep 2021
Layout approvalFile: SANCTION STAMP ON SANCTION MAP.pdf30 Sep 2021
Copy of Layout Approval (in case of layout)File: SANCTION STAMP ON SANCTION MAP.pdf30 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: SANCTION STAMP ON SANCTION MAP.pdf30 Sep 2021
Proforma of Allotment letterFile: ALLOTTMENT LETTER NEW.pdf30 Sep 2021
Declaration about Commencement CertificateFile: form d declaration 32.pdf18 Sep 2021
Copy of the legal title reportFile: FINAL SHRIRAM BUILDER MAHAKALKAR TITLE REPORT_compressed.pdf18 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL SHRIRAM DEVELOPERAS CA CERTIFICATE_compressed.pdf18 Aug 2021
Details of encumbrancesFile: NO ENCUMBARANCE NEW.pdf15 Jul 2021
Declaration in FORM BFile: FORM B FINAL-min.pdf15 Jul 2021
Proforma of Allotment letterFile: AGREEMENT STANDARD.pdf15 Jul 2021
Layout approvalFile: sanction map-min.pdf3 Jul 2021
Building plan approvalFile: sanction map-min.pdf3 Jul 2021
PAN CardFile: ADHAR PAN SHRIRAM.pdf3 Jul 2021
Copy of Layout Approval (in case of layout)File: sanction map-min.pdf3 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: sanction map-min.pdf3 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: BULDING PERMIT NEW 2PG-min.pdf3 Jul 2021

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 12 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAHALAXMI PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAKKARDARA STREET SCHEME, MOUJZA : SAKKARDARA NAGPUR2,800+ in Nagpur

Builder: SHRIRAM DEVELOPERS

Shriram Developers has 10 registrations on MahaRERA, including Rambaug City A1 and Shreeram Residency. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that MAHALAXMI PLAZA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MAHALAXMI PLAZA is delayed beyond 30 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAHALAXMI PLAZA?

The registered promoter entity is SHRIRAM DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAHALAXMI PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAHALAXMI PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAHALAXMI PLAZA?

The professionals named in the filing: Architect: MS HUNDRED%DESIGN; Engineer: PRIYANKA MEGHE; Chartered Accountant: CA Akhilesh Pathak. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAHALAXMI PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAHALAXMI PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAHALAXMI PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.