Home / Browse projects / Pune, Maharashtra / Mahakaleshwar Paradise Building B

Registered No litigation declared Residential / Group Housing project

Mahakaleshwar Paradise Building B

By Chandrakant Deepaji Khamitkar

RG-MH-24534 · RERA P52100007261 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 90 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 90 months from the original
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
43 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Mahakaleshwar Paradise Building B is a Residential / Group Housing project by Chandrakant Deepaji Khamitkar in Pune, Maharashtra, registered with MahaRERA as P52100007261 on 17 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 90 months from the original filing. 7 of the 50 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameMahakaleshwar Paradise Building B
  • TypeResidential / Group Housing
  • Location
    • Katraj Khondwa Road
    • Gokul Nagar
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007261
  • ReraGenie IDRG-MH-24534

Builder

  • NameChandrakant Deepaji Khamitkar
  • Entity typeOthers
  • Named personsM/s Nath Construction Through its Proprietor Sau Usha Chandrakant Khamitkar, M/s Sai Construction Through its Proprietor Mr. Saiprasad Chandrakant Khamitkar, M/s Yog Construction Through its Proprietor Mr. Chandrakant D Khamitkar

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed95 files

Current status

14%7 of 50 units booked
71.6%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mahakaleshwar Paradise Building BNA10050050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Mahakaleshwar Paradise Building B: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered1
Open Space38

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
Nath Construction Through Propra Usha C KhamitkarDhankawadiPune
Yog Construction Thr Prop Chandrakant D KhamitkarDhankawadiPune
Sai Construction Through prop Saiprasad KhamitkarDhankawadiPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3887.22
Proposed, not sanctioned3,017 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBharati Sahakari Bank Ltd Dhankawadi Pune
Estimated costRs 13.80 cr
Cost incurredRs 9.88 cr
Work done71.57%
BuildingWingEstimatedIncurred
Mahakaleshwar Paradise Building BNARs 13.15 crRs 9.88 cr
-NARs 65.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJoshi Associates Mr Pramod S Joshi
EngineerDelcons Consultants India Pvt Ltd
EngineerBabasaheb Vithal Takawale
Chartered AccountantPratik D Jain and Associates
Chartered AccountantS.K Lele & Co
Chartered AccountantAshay Butala & Associates
Chartered AccountantCA Prashant Rasal and Associates
PartnerRole in project
Chandrakant Deepaji Khamitkar-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005035Dec 2019 → Dec 2021

Reason as filed by the promoterFUNDS NOT AVAILABLE FOR COMPLETION, NO NEW BOOKINGS DUE TO DELAY IN COMPLETION, WHATEVER FEW BOOKINGS HAS BEEN CANCELLED DUE TO DELAYED COMLETION AND SEEKING NOC FROM DGCA.

EXT52100017064Dec 2019 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 100% allottees for purpose of extension of RERA registration period of the said project.

EA01082502281Dec 2019 → Jun 2027

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 30/06/2027 to complete the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: f1.pdf20 Jul 2026
Withdrawal Update Form 2File: f2.pdf20 Jul 2026
Withdrawal Update Form 3File: f3.pdf20 Jul 2026
Withdrawal Update Form 1File: 20260424111144.pdf25 Apr 2026
Withdrawal Update Form 1File: 20260424111144.pdf25 Apr 2026
Withdrawal Update Form 2File: ilovepdf_merged-1.pdf25 Apr 2026
Withdrawal Update Form 2File: ilovepdf_merged-1.pdf25 Apr 2026
Withdrawal Update Form 3File: 20260424111144-1.pdf25 Apr 2026
Withdrawal Update Form 3File: 20260424111144-1.pdf25 Apr 2026
Withdrawal Update Form 1File: arc 1.pdf2 Feb 2026
Withdrawal Update Form 2File: eng 1.pdf2 Feb 2026
Withdrawal Update Form 3File: ca 1.pdf2 Feb 2026
Form 2A (FY 2025-2026)File: 2a.pdf2 Feb 2026
Form 5 (FY 2024-2025)File: RERA Audit report - 24-25.pdf12 Nov 2025
Withdrawal Update Form 1File: AR - Sep 25.pdf20 Oct 2025
Withdrawal Update Form 2File: ER - Sep 25.pdf20 Oct 2025
Withdrawal Update Form 3File: CA sept 25.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf4 Sep 2025
Form 2A (FY 2017-2018)File: Form 2A 2017-18.pdf4 Sep 2025
Form 2A (FY 2018-2019)File: Form 2A 2018-19.pdf4 Sep 2025
Form 2A (FY 2019-2020)File: Form 2A 2019-20.pdf4 Sep 2025
Form 2A (FY 2020-2021)File: Form 2A 2020-21.pdf4 Sep 2025
Form 2A (FY 2021-2022)File: Form 2A 2021-22.pdf4 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A 2022-23.pdf4 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf4 Sep 2025
Form 5 (FY 2020-2021)File: RERA Audit 2020-21.pdf2 Sep 2025
Form 5 (FY 2021-2022)File: RERA Audit 2021-22.pdf2 Sep 2025
Form 5 (FY 2022-2023)File: RERA Audit 2022-23.pdf2 Sep 2025
Form 5 (FY 2023-2024)File: Form 5-F Y 23-24-Yog Construction.pdf2 Sep 2025
Form 1File: AR - June 25.pdf19 Jul 2025
Form 2File: ER - June 25.pdf19 Jul 2025
Form 3File: CA Certificate.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf19 Jul 2025
Form 1File: AR cert.pdf21 May 2025
Form 2File: ER - March 25.pdf21 May 2025
Form 3File: Final CA Certificate_March 25 PDJ.pdf21 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - March 25.pdf21 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Dec 24.pdf15 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Dec 24.pdf26 Feb 2025
Certificates of CA (Form 3)File: 25610534BMJFKN7511.pdf26 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DocScanner 19-Feb-2025 11-25 am.pdf26 Feb 2025
Certificates of CA (Form 3)File: CA June 24 Final.pdf18 Nov 2024
Certificates of CA (Form 3)File: CA Sept 24 Final.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20241016051857.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20241016051919.pdf18 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 24-06-24_compressed.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 25-09-24_compressed.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20241016051857.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 20241016051919.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 25-09-24_compressed.pdf18 Nov 2024
Certificates of CA (Form 3)File: CA June 24 Final.pdf18 Nov 2024
Certificates of CA (Form 3)File: CA Sept 24 Final.pdf18 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 24-06-24_compressed.pdf18 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sep 2023.pdf4 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Dec 2023.pdf4 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - March 2024.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 2023.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Dec 2023.pdf4 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - March 2024.pdf4 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Scan Form 5_240703_183221.pdf4 Jul 2024
Certificates of CA (Form 3)File: Form 3 - Sept 2023_compressed.pdf1 Jul 2024
Certificates of CA (Form 3)File: Form 3 - December 2023.pdf1 Jul 2024
Certificates of CA (Form 3)File: Form 3 - March 2024.pdf1 Jul 2024
Certificates of CA (Form 3)File: Form 3 as on 20-09-2023- Mahakaleshwar.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Mahakaleshwar.pdf22 Sep 2023
Disclosure of sold/ booked inventoryFile: Circular 29 Mahakaleshwar.pdf22 Sep 2023
Declaration about Commencement CertificateFile: Format D.pdf21 Sep 2023
Declaration in FORM BFile: Form B.pdf21 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf21 Sep 2023
Disclosure of sold/ booked inventoryFile: Circular 29.pdf21 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf16 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf16 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1_Architech Certificate .pdf1 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Engineer's certiicate.pdf1 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Adobe Scan Aug 16, 2023.pdf25 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2023.pdf25 Aug 2023
Disclosure of sold/ booked inventoryFile: index .pdf25 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf25 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf25 Aug 2023

How this compares with Pune

14%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 90 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahakaleshwar Paradise Building B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gokul Nagar13,700+ in Pune

2 kmMahakaleshwar Paradise BCompleted 66Lapsed / revoked 44Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 164 registered projects within 2 km.

Builder: Chandrakant Deepaji Khamitkar

Chandrakant Deepaji Khamitkar has 1 registration on MahaRERA, including Mahakaleshwar Paradise Building B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Mahakaleshwar Paradise Building B is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahakaleshwar Paradise Building B?

The registered promoter entity is Chandrakant Deepaji Khamitkar, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahakaleshwar Paradise Building B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahakaleshwar Paradise Building B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahakaleshwar Paradise Building B?

The professionals named in the filing: Architect: Joshi Associates Mr Pramod S Joshi; Engineer: Delcons Consultants India Pvt Ltd; Engineer: Babasaheb Vithal Takawale; Chartered Accountant: Pratik D Jain and Associates; Chartered Accountant: S.K Lele & Co; Chartered Accountant: Ashay Butala & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahakaleshwar Paradise Building B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahakaleshwar Paradise Building B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahakaleshwar Paradise Building B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.