Home / Browse projects / Raigarh, Maharashtra / Madina Complex Building No 3 and 4

Registered No litigation declared Residential / Group Housing project

Madina Complex Building No 3 and 4

By Al-Hamd Developers

RG-MH-33312 · RERA P52000080665 · Last updated on MahaRERA portal: 4 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Aug 2028Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 80%
18 of 101Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

Madina Complex Building No 3 and 4 is a Residential / Group Housing project by Al-Hamd Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000080665 on 23 Jun 2025. Possession is promised by 31 Aug 2028. 83 of the 101 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameMadina Complex Building No 3 and 4
  • TypeResidential / Group Housing
  • Location
    • Karjat - Kalyan Road
    • Damat Neral
    • Damat
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000080665
  • ReraGenie IDRG-MH-33312

Builder

  • NameAl-Hamd Developers
  • Entity typePartnership
  • GSTIN27ABZFA4923A1ZD
  • PartnersJaki Ibrahim Naje, Ibrahim Gaus Naje, Jabir Anis Naje
  • Other registrations1 more →
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2025PromisedAug 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion31 Aug 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed56 files

Current status

82%83 of 101 units booked
32.9%Work done, per cost certificate

Figures as on 4 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 3NA7765065
Building No 4NA7736036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Building No 324%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 433%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Open Space128
BuildingOpen SpaceTotal
Building No 38282
Building No 44646

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,740 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2025

Approvals and building plan

Sanctioning authorityOffice of District Collector and District Magistrate
Permissible FSI5039.67
Proposed, not sanctioned5,040 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP 1-4, RATNESHWAR KRUPA,NERAL-MATHERAN ROAD, HETKAR AALI, NEAR GANESH MANDIR, DIST-RAIGAD NERAL MAHARASHTRA 410101
Estimated costRs 11.26 cr
Cost incurredRs 3.71 cr
Work done32.92%
BuildingWingEstimatedIncurred
Building No 3NARs 6.36 crRs 1.05 cr
Building No 4NARs 4.74 crRs 2.65 cr
-NARs 15.97 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBrahmand Architect
ArchitectMS SWAKRUTI ASSOCIATES
EngineerR S Structural Designer
EngineerMS Swakruti Associates
Chartered AccountantJOSHI CHHADVA & CO LLP
Chartered AccountantJoshi Kale and Associates
PartnerRole in project
Al-Hamd Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2028

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MARCH 2026.pdf4 Jul 2026
Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf4 Jul 2026
Withdrawal Update Form 3File: Form 3 Upload Mar 26.pdf4 Jul 2026
Withdrawal Update Form 1File: ARCHITECT CERTOFICATE DEC 2025.pdf25 Mar 2026
Withdrawal Update Form 1File: ARCHITECT CERTOFICATE DEC 2025.pdf25 Mar 2026
Withdrawal Update Form 1File: ARCHITECT CERTOFICATE DEC 2025.pdf25 Mar 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE DEC 2025.pdf25 Mar 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE DEC 2025.pdf25 Mar 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE DEC 2025.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 for uploading.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 for uploading.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 for upload.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 Sep 3 4.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 Sep 3 4.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 Received Signed-Partners.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 June 3 4.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 June 3 4.pdf2 Feb 2026
Withdrawal Update Form 3File: Final Form 3.pdf2 Feb 2026
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf17 Jun 2025
Proforma of Agreement for saleFile: Agr for Sale 03-06-2025.pdf9 Jun 2025
Details of encumbrances concerned to FinanceFile: Declaration of No Financial Encumbrances.pdf3 Jun 2025
Other - LegalFile: Partnership deed-compressed.pdf3 Jun 2025
Details of encumbrances concerned to LegalFile: Declaration of No Financial Encumbrances.pdf3 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK CERTIFICATE -Format B.pdf3 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Declaration of Agreement for sale.pdf17 May 2025
Copy of the legal title reportFile: Legal Title Report S No 7 3.pdf29 Apr 2025
Other - LegalFile: DECLARATION ABOUT LAND.pdf29 Apr 2025
Other - LegalFile: Index 2 of S No7 3 and S No7 4.pdf29 Apr 2025
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf29 Apr 2025
CERSAI detailsFile: Undertaking cersai.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 uploaded.pdf25 Apr 2025
Declaration in FORM BFile: Form - B.pdf11 Apr 2025
Other - TechnicalFile: One Land One Project Declaration.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: INVENTORY 3 AND 4.pdf4 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_Phase II_Al-Ham_rotated.pdf28 Mar 2025
Copy of the legal title reportFile: Legal Title Report_compressed.pdf26 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format - A (Separate bank account Declaration).pdf26 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Declaration of No Secured_Unseured Loans.pdf26 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_Signed Final.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_Signed Final.pdf24 Mar 2025
Deviation Report with respect to Allotment letterFile: Declaration of No Deviation_Allotment Letter.pdf24 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Partner's Interest Disclosure_Ibrahim Gaus Naje.pdf24 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Partner's Interest Disclosure_Jabir Anis Naje.pdf24 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Partner's Interest Disclosure_Jaki Ibrahim Naje.pdf24 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Partner's Interest Disclosure_Mohammed Sami Nasim Khot.pdf24 Mar 2025
Details of encumbrances concerned to FinanceFile: Declaration for No Encumbrances.pdf21 Mar 2025
Details of encumbrances concerned to LegalFile: Declaration for No Encumbrances.pdf21 Mar 2025
Layout approvalFile: SCAN PDF MAP2-compressed-rotated.pdf12 Jan 2025
Building plan approvalFile: SCAN PDF MAP 1-compressed-rotated.pdf12 Jan 2025
Building plan approvalFile: SCAN PDF MAP2-compressed-rotated.pdf12 Jan 2025
Building plan approvalFile: SCAN PDF MAP 3-compressed-rotated.pdf12 Jan 2025
PAN CardFile: PAN Card.pdf12 Jan 2025
Copy of Layout Approval (in case of layout)File: SCAN PDF MAP2-compressed-rotated.pdf12 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: SCAN PDF MAP 1-compressed-rotated.pdf12 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: SCAN PDF MAP2-compressed-rotated.pdf12 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: SCAN PDF MAP 3-compressed-rotated.pdf12 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Madina ComplexP52000053474-, Raigarh70Nov 2023OngoingAug 2026Not delivered

How this compares with Raigarh

82%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Madina Complex Building No 3 and 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Damat Neral5,900+ in Raigarh

2 kmMadina Complex Building Completed 24Lapsed / revoked 17Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 76 registered projects within 2 km.

Builder: Al-Hamd Developers

Al-Hamd Developers has 2 registrations on MahaRERA, including Madina Complex and Madina Complex Building No 3 and 4. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Madina Complex Building No 3 and 4 is delayed beyond 31 Aug 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Madina Complex Building No 3 and 4?

The registered promoter entity is Al-Hamd Developers, a partnership as per the filing. Its GSTIN 27ABZFA4923A1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Madina Complex Building No 3 and 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Madina Complex Building No 3 and 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Madina Complex Building No 3 and 4?

The professionals named in the filing: Architect: Brahmand Architect; Architect: MS SWAKRUTI ASSOCIATES; Engineer: R S Structural Designer; Engineer: MS Swakruti Associates; Chartered Accountant: JOSHI CHHADVA & CO LLP; Chartered Accountant: Joshi Kale and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Madina Complex Building No 3 and 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Madina Complex Building No 3 and 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Madina Complex Building No 3 and 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.