MADHUBAN HEIGHTS

By Rajesh M Vaje

RG-MH-19296 · RERA P52800078386 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Sep 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 20%
33 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

MADHUBAN HEIGHTS is a Residential / Group Housing project by Rajesh M Vaje in Ratnagiri, Maharashtra, registered with MahaRERA as P52800078386 on 10 Dec 2024. Possession is promised by 20 Sep 2029. 2 of the 35 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameMADHUBAN HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • MUMBAI GOA HIGHWAY
    • PAG NAKA
    • Kapsal
    • Chiplun
    • Ratnagiri
    • 415605
  • Pincode415605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800078386
  • ReraGenie IDRG-MH-19296

Builder

  • NameRajesh M Vaje
  • Entity typeIndividual

Key dates

this monthRegisteredDec 2024PromisedSep 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Dec 2024
  • Promised completion20 Sep 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Current status

6%2 of 35 units booked
13.3%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MADHUBAN HEIGHTSNA7735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 20%.

MADHUBAN HEIGHTS: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed47

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots47
Closed/Covered47

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,670 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2025
LandownerVillageDistrict
MALATI S SHINDEChiplun (M Cl)Ratnagiri
USHA S SHINDEKalambasteRatnagiri
SHOBHA G SHINDEChiplun (M Cl)Ratnagiri
Priyanka P ShindeChiplun (M Cl)Ratnagiri
Prasad P ShindeChiplun (M Cl)Ratnagiri
Bharat S ShindeChiplun (M Cl)Ratnagiri
Sudhakar G ShindeChiplun (M Cl)Ratnagiri
Laxmi Govind ShindeChiplun (M Cl)Ratnagiri
Vanita p ShindeChiplun (M Cl)Ratnagiri
NATHURAM GOVIND CHINGALEDOMBIVLIThane

Approvals and building plan

Sanctioning authorityChiplun Municipal Council, Chiplun
Permissible FSI2495.85
Proposed, not sanctioned2,496 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJANARANG, OPP. CENTRAL S. T. STAND, BURUM TALI, CHIPLUN. TAL. CHIPLUN DIST. RATNAGIRI PIN. 415605.
Estimated costRs 5.37 cr
Cost incurredRs 71.44 lakh
Work done13.3%
BuildingWingEstimatedIncurred
MADHUBAN HEIGHTSNARs 5.12 crRs 71.44 lakh
-NARs 25.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVINDRA D KARANDIKAR
EngineerABHIJEET KHATATE
EngineerRAVINDRA KARANDIKAR
Chartered AccountantAMIT VIKAS OAK
Chartered AccountantSARDESAI AND COMPANY CHARTERED ACCOUNTANTS
PartnerRole in project
Rajesh M Vaje-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 20 Sep 2029

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Form 1 03 2026.pdf11 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate Form 2 03 26.pdf11 Jun 2026
Withdrawal Update Form 3File: Rera CA Certificate March 2026.pdf11 Jun 2026
Form 2A (FY 2025-2026)File: Engineer Certificate QA 03 2026.pdf11 Jun 2026
Form 5 (FY 2025-2026)File: Annual Report form 5 Sign Scan Copy.pdf11 Jun 2026
Withdrawal Update Form 1File: Architect certificate .pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf2 Feb 2026
Withdrawal Update Form 3File: C A Rera.pdf2 Feb 2026
Withdrawal Update Form 1File: Ar FORM1 Copy 0625.pdf18 Dec 2025
Withdrawal Update Form 1File: Ar FORM 1 Scan Sign Copy 0925.pdf18 Dec 2025
Withdrawal Update Form 2File: Er FORM2 ScanSign Copy 0625.pdf18 Dec 2025
Withdrawal Update Form 2File: Er FORM2 Scan Sign Copy 0925.pdf18 Dec 2025
Withdrawal Update Form 3File: C A Rera Scan Sign Copy 0625.pdf18 Dec 2025
Withdrawal Update Form 3File: CA Rera Scan Sign Copy 0925.pdf18 Dec 2025
Form 5 (FY 2024-2025)File: CA Rera Anual Report ScanSign Copy 1125.pdf18 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Madhuban Heights 01.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Rera Certificate Madhuban Heights 01.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Madhuban Heights 01.pdf24 Apr 2025
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (2) (1).pdf4 Dec 2024
Other - LegalFile: Property Card 8044.pdf29 Nov 2024
Other - LegalFile: 7 12 Extract 22 1 a 3 a.pdf29 Nov 2024
Other - LegalFile: Landowner Declaration (2) (1).pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate New 01.pdf26 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Madhuban (1).pdf25 Nov 2024
CERSAI detailsFile: CERSAI.pdf22 Nov 2024
Copy of the legal title reportFile: Legal Title Report 8042 8044.pdf19 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Letter of Municipal Council about Parking.pdf19 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: doc04845420241116150201.pdf19 Nov 2024
Other - FinanceFile: ilovepdf_merged (2)_11zon.pdf16 Nov 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged.pdf14 Nov 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged.pdf14 Nov 2024
Other - FinanceFile: self declaration regarding proprietorship firm.pdf12 Nov 2024
Proforma of Allotment letterFile: Allotment letter 01 new.pdf23 Oct 2024
Declaration in FORM BFile: FORM B Developers.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20241023-143215_compressed.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20241023-161920_compressed.pdf23 Oct 2024
Deviation Report with respect to Allotment letterFile: No Deviation AL.pdf23 Oct 2024
Other - TechnicalFile: Declaration Cum Undertaking.pdf23 Oct 2024
Proforma of Agreement for saleFile: ilovepdf_merged.pdf23 Oct 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation ATS.pdf22 Oct 2024
Building plan approvalFile: Municipal Sanction Plan.pdf7 Oct 2024
Layout approvalFile: Map of Pag new land .pdf7 Oct 2024
PAN CardFile: PAN Card Rajesh Vaje.pdf7 Oct 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (2).pdf7 Oct 2024
Copy of Layout Approval (in case of layout)File: Map of Pag new land .pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Muncipal Sanction CC.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Municipal Sanction Plan.pdf7 Oct 2024
Other - LegalFile: Property Card 8042.pdf7 Oct 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged (2).pdf7 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DIN.pdf7 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Declaration of Secured Unsecured finances.pdf7 Oct 2024

How this compares with Ratnagiri

6%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep MADHUBAN HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PAG NAKA1,100+ in Ratnagiri

2 kmMADHUBAN HEIGHTSCompleted 8Lapsed / revoked 6Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: Rajesh M Vaje

Rajesh M Vaje has 1 registration on MahaRERA, including MADHUBAN HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if MADHUBAN HEIGHTS is delayed beyond 20 Sep 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADHUBAN HEIGHTS?

The registered promoter entity is Rajesh M Vaje, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADHUBAN HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MADHUBAN HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADHUBAN HEIGHTS?

The professionals named in the filing: Architect: RAVINDRA D KARANDIKAR; Engineer: ABHIJEET KHATATE; Engineer: RAVINDRA KARANDIKAR; Chartered Accountant: AMIT VIKAS OAK; Chartered Accountant: SARDESAI AND COMPANY CHARTERED ACCOUNTANTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADHUBAN HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADHUBAN HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADHUBAN HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.