ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Luxury Square

Registered No litigation declared Others project

Luxury Square

By M/s. Sanco Spaces

RG-MH-22411 · RERA P52100031991 · Last updated on MahaRERA portal: 13 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 85%
0 of 150Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Luxury Square is a Others project by M/s. Sanco Spaces in Pune, Maharashtra, registered with MahaRERA as P52100031991 on 3 Dec 2021. Possession is promised by 31 Dec 2026. 150 of the 150 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLuxury Square
  • TypeOthers
  • Location
    • Chikhali
    • Pimpri Chinchwad
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • RERA no.P52100031991
  • ReraGenie IDRG-MH-22411

Builder

  • NameM/s. Sanco Spaces
  • Entity typePartnership
  • PartnersMr Nandkumar Nagendrarao Salunke, Mr Santosh Namdevrao Pawar

Key dates

this monthRegisteredDec 2021PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Dec 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

100%150 of 150 units booked

Figures as on 13 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Luxury SquareNA171713020150

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Luxury Square: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises65%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.45%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 13 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered149
Open Space31

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,206 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI22117.0
Proposed, not sanctioned15,356 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSupriya Tower, Nagras Road, Aundh, Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcon Assocaites
EngineerCicom Consultants
EngineerRachappa Veershetty Rodda
Chartered AccountantD L Hattarge & Co
PartnerRole in project
M/s. Sanco Spaces-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603874JYOTI MAHESH RAHINJM/s. Sanco Spaces23/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1- Certificate 02-12-2024 - Luxury Square.pdf13 Jan 2025
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate -2023.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A - Engineers Quality Assurance Certificate - Luxury Square 02-12-2024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form - 3 - 2024 YEar.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - 26-03-2024 - Sanco Spaces - Project Luxury Square - Colour Xerox.28 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate -2024.pdf28 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Sanco Spaces - 2022 - 2023.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Quarter 1 - 2024 -FORM 1 ARCHITECT - Luxury Square Project- 10- 01-2024.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024 Quarter 1 - Architect Certificate -Luxury Square Project - Sanco Spaces Promoter_000119 Jan 2024
Copy of the legal title reportFile: Legal Title Report.pdf22 Aug 2023
Copy of the legal title reportFile: Flow of Title of said Land.pdf22 Aug 2023
Proforma of Agreement for saleFile: Latest Draft AFS - Luxury Square Project - 2023.pdf22 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with AFS.pdf22 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - 10-04-2023.pdf16 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer_s Certificate for Quaity Assurance - 2022.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer_s Certificate for Quaity Assurance - 2023.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 - Luxury Square Project.pdf11 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 - Nandkumar Salunke - Disclosure of Interest in other Real Estate Organization.pdf14 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 - Santosh Pawar - Disclosure of Interest in other Real Estate Organization.pdf14 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation Report for Allotment Letter.pdf14 Jun 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Releated To Legal.pdf24 May 2023
Details of encumbrances concerned to FinanceFile: Non-Encumbrance Releated To Finance.pdf24 May 2023
Details of encumbrancesFile: Self Declaration Regarding Encumbrances.pdf24 May 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance Releated To Legal.pdf24 May 2023
Details of encumbrances concerned to LegalFile: Non-Encumbrance Releated To Finance.pdf24 May 2023
Declaration in FORM BFile: Affidavit Cum Declaration.pdf24 May 2023
CERSAI detailsFile: Sanco Spaces Latest Cersai Report- 2023.pdf24 May 2023
Proforma of Allotment letterFile: Allotment Letter.pdf24 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank Account for Real Estate Project.pdf24 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate - 2023.pdf27 Apr 2023
Building plan approvalFile: Layout Plan - 1-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 2-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 3-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 4-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 5-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 6-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 7-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 8-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 9-10_compressed.pdf18 Apr 2023
Building plan approvalFile: Plan 10-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan - 1-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 4-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 5-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 6-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 7-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 8-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 9-10_compressed.pdf18 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 10-10_compressed.pdf18 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT - 10-04-2023.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Luxury Square - Annual Audit Reprot -Form 5 - FY 2021-2022.pdf18 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Luxury Square - Annual Audit Reprot -Form 5 - FY 2021-2022.pdf18 Apr 2023
Other - LegalFile: EC Sanco Spaces.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Form 2 A - Luxury Square Project - Sanco Spaces Promoter - 2022.pdf8 Mar 2022
CERSAI detailsFile: CERSAI- Debtor - Based Search - Sanco Spaces - 2022.pdf8 Mar 2022
Copy of the legal title reportFile: Sanco Spaces - Title Report - As per MahaRERA Cirular 28-2021.pdf22 Nov 2021
Copy of the legal title reportFile: Flow of Title - Sanco Spaces - 2021.pdf22 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate - Sanco Spaces_compressed.pdf22 Nov 2021
Declaration about Commencement CertificateFile: Sanco Spaces Declaration about Commencement Certificate - 2021_0001.pdf22 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Sanco Spaces Latest Commencement Certificate -2021.pdf1 Nov 2021
Proforma of Allotment letterFile: Sanco Spaces Allotment Letter_0001.pdf22 Oct 2021
Details of encumbrancesFile: Sanco Space Non-Encumbrance Certificate - 2021_0001.pdf18 Oct 2021
Declaration in FORM BFile: Scan-Sanco Spaces-Form B.pdf18 Oct 2021
Proforma of Allotment letterFile: Final Draft of Agreement to Sale - Sanco Spaces - 2021.pdf18 Oct 2021
Building plan approvalFile: Plan -2_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan -3_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan -4_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan - 5_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan - 6_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan - 7_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan - 8_compressed.pdf29 Sep 2021
Building plan approvalFile: Plan - 9_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan -2_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan -3_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan -4_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan - 5_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan - 6_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan - 7_compressed.pdf29 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: Plan - 8_compressed.pdf29 Sep 2021

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Luxury Square on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pimpri Chinchwad13,700+ in Pune

Builder: M/s. Sanco Spaces

M/s. Sanco Spaces has 1 registration on MahaRERA, including Luxury Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Luxury Square is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Luxury Square?

The registered promoter entity is M/s. Sanco Spaces, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Luxury Square?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Luxury Square?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Luxury Square?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Luxury Square?

The professionals named in the filing: Architect: Arcon Assocaites; Engineer: Cicom Consultants; Engineer: Rachappa Veershetty Rodda; Chartered Accountant: D L Hattarge & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Luxury Square?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Luxury Square. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Luxury Square to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.