Lotus Link Square
By Lotus Grih Nirman Private Limited
RG-MH-24461 · RERA P51800005163 · Last updated on MahaRERA portal: 23 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 60 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lotus Link Square is a Commercial project by Lotus Grih Nirman Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005163 on 10 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 60 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameLotus Link Square
- TypeCommercial
- Location
- New Link Road
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005163
- ReraGenie IDRG-MH-24461
Builder
- NameLotus Grih Nirman Private Limited
- Entity typeCompany
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Aug 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed75 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| COMMERCIAL WING | NA | 23 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
COMMERCIAL WING: 98% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 85% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed213
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultants Pvt. Ltd.Mr Jitendra Dewoolkar |
| Engineer | Shanghvi & Associates Consultants Pvt Ltd |
| Partner | Role in project |
|---|---|
| Lotus Grih Nirman Private Limited | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear sir We have completed work and received OC on 30/12/2021 for entire part which is sold till date. As on date, the construction work in the said Project has been completed for 1 (one) basement + ground floor + 16 (sixteen) upper floors + part 17th (seventeenth) and part 18th (eighteenth) floor including 100% of staircases, lifts and lobby / passage common areas (including 4 (four) levels of car parking) in accordance with the proposed date of completion mentioned on the MahaRERA website. We have also received the part occupancy certificate for 1 (one) basement + ground floor + 16 (Sixteen)
Reason as filed by the promoterAt the time of registering the said Project, we had furnished certain details regarding the Floor Space Index (“FSI”) available in respect of the said Project. In our application, we had mentioned the details pertaining to FSI in the following manner: Approved FSI as per sanctioned plan - 8455.42 sq. mtrs. Proposed FSI - 9515 sq. mtrs. which comprised of FSI of 3659 sq. mtrs. for which costs had been paid and for which the plans were under approval (“FSI under approval”) and FSI of 5856 sq. mtrs. which we intended to procure. Total FSI i.e. Approved FSI plus Proposed FSI was 17970 sq. mtrs. At
Reason as filed by the promoterWE HAD OBTAINED PART OC AND HAD GIVEN POSSESSION TO ALL UNIT BUYERS TO WHOM UNITS WERE SOLD TO DATE. SO, TILL DATE ALL SOLD UNITS HAVE RECEIVED THEIR POSSESSION. FOR THE BALANCE CONSTRUCTION OF 2 FLOORS, WE HAVE NOT BEEN OFFERING ANY UNITS FOR SALE SINCE WE HAD UNSOLD OC UNITS TO BE SOLD FIRST. REASON FOR SEEKING EXTENSION: SINCE NOW MAXIMUM OC READY UNITS ARE SOLD, WE SEEK EXTENSION TO CONSTRUCT THE REMAINING PART OF BUILDING AND COMPLETE FULL OC AND HANDOVER. IN BETWEEN DUE TO THE REDUCED DEMAND OF COMMERCIAL OFFICE SPACES POST-LOCKDOWN, THE INVENTORY MOVEMENT WAS VERY SLOW. BECAUSE OF THAT,
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 1440 of 2011/2011 | City Civil Court Dindoshi | Notice of motion for Hearing |
| 30 of 2015/2015 | Cooperative Appelleant Court Bombay | Pending |
| 2086 of 2013/2013 | Civil Court Dindoshi | Notice of Motion for Replyjoinder |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192918 | Naseema Sikandar Khan Mohammed Zain Khan | Lotus Grih Nirman Pvt Ltd, L&T FInance Ltd | 06/03/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 23 Apr 2025
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full_OC_certificate.pdf | 23 Apr 2025 |
| Certificates of CA (Form 3)File: FORM3_31082023.pdf | 13 Oct 2023 |
| Certificates of CA (Form 3)File: FORM3_31082023.pdf | 13 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 3 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Enginner Certificate.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality certificate.pdf | 3 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: SOLDUNSOLD INVENTORY compressed.pdf | 3 Oct 2023 |
| Declaration in FORM BFile: Form B.pdf | 8 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORMI_060923.pdf | 7 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2.pdf | 7 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Signed2AQC.pdf | 7 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: SOLDUNSOLD INVENTORY.pdf | 5 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Lotus Griha Nirman_FY 2021-22.pdf | 23 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: LLSA 2021-22 Q-1.pdf | 8 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Account Details.pdf | 8 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200260441158_For_Debtor_Based_Search_15_02_2023_18_05_17_646.pdf | 16 Feb 2023 |
| Proforma of Agreement for saleFile: RERA_DRAFT AGREEMENT FOR SALE_LOTUS LINK SQUARE (ANDHERI).pdf | 15 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: EE_signed_Full CC.pdf | 8 Sep 2022 |
| Certificates of CA (Form 3)File: Form-3_300622.pdf | 1 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate RERA LGNPL.pdf | 28 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-A_15072022.pdf | 28 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-B_15072022.pdf | 28 Jul 2022 |
| Certificates of CA (Form 3)File: Form3.pdf | 28 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-A_29032022.pdf | 11 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-B_29032022.pdf | 11 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: K3K4 Part OC.pdf | 7 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-A_15122021.pdf | 21 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-B_15122021.pdf | 21 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: K3K4 FCC 02112021.pdf | 9 Nov 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MHADA.pdf | 9 Nov 2021 |
| Status of ConveyanceFile: Supplementry Lease Deed.pdf | 9 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-A_15102021.pdf | 21 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: Lotus Link Square Part-B_15102021.pdf | 21 Oct 2021 |
| Declaration about Commencement CertificateFile: Declaration about CC_LLSA.pdf | 22 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 LLS_LGNPL - 2019.pdf | 19 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 LLS_LGNPL - 2020.pdf | 19 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 LLS_LGNPL - 2021.pdf | 19 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_2019-20.pdf | 16 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_2020-21.pdf | 16 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Lotus Lonk Square Part-A.pdf | 14 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Lotus Lonk Square Part-B.pdf | 14 Jun 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 14 Jun 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC.pdf | 23 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC.pdf | 8 Jul 2019 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 20 Apr 2019 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 20 Apr 2019 |
| Certificates of CA (Form 5)File: Form 5.pdf | 20 Apr 2019 |
| Proforma of Allotment letterFile: Proforma for Agreement for Sale.pdf | 20 Apr 2019 |
| Proforma of Allotment letterFile: Proforma for Agreement for Sale.pdf | 20 Apr 2019 |
| Proforma of Allotment letterFile: Proforma for Agreement for Sale.pdf | 20 Apr 2019 |
| Building plan approvalFile: amenden plan 23012019 LLSA.pdf | 31 Jan 2019 |
| Building plan approvalFile: amenden plan 23012019 LLSA.pdf | 31 Jan 2019 |
| Building plan approvalFile: amenden plan 23012019 LLSA.pdf | 31 Jan 2019 |
| Building Plan Approval (IOD)File: amenden plan 23012019 LLSA.pdf | 31 Jan 2019 |
| Building Plan Approval (IOD)File: amenden plan 23012019 LLSA.pdf | 31 Jan 2019 |
| Building Plan Approval (IOD)File: amenden plan 23012019 LLSA.pdf | 31 Jan 2019 |
| Proforma of Allotment letterFile: Revised Proforma Agreement for Sale.pdf | 20 Jun 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Furthercc_signed.pdf | 14 Feb 2018 |
| OtherFile: Building_Plan-min.pdf | 14 Feb 2018 |
| Proforma of Allotment letterFile: Proforma for Allotment Letter and Agreement for Sale.pdf | 17 Oct 2017 |
| Layout approvalFile: LGN_Layout.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Titile Report.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LGN_Layout.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: FORM_B_Lotus Link Square - Andheri-Compressed.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LLSA Engineer Certificate.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate Final.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Proforma of Allotment Letter and Agreement for Sale.pdf | 29 Jul 2017 |
| OtherFile: Plan.pdf | 29 Jul 2017 |
| OtherFile: Lotus Link Square - Andheri-Self Declaration.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOD (002).pdf | 28 Jul 2017 |
| PAN CardFile: Pan Card_Cropped.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: Index 2 Encumbrance_fin.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: IOD (002).pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC (003).pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEPTUNE CHS.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Lotus Link Square on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 318 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Lotus Grih Nirman Private Limited
Lotus Grih Nirman Private Limited has 1 registration on MahaRERA, including Lotus Link Square. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Lotus Link Square shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Lotus Link Square is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lotus Link Square?
The registered promoter entity is Lotus Grih Nirman Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lotus Link Square?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Lotus Link Square?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Lotus Link Square?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lotus Link Square?
The professionals named in the filing: Architect: Ellora Project Consultants Pvt. Ltd.Mr Jitendra Dewoolkar; Engineer: Shanghvi & Associates Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lotus Link Square?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback