Lodha Kandivali Project - Tower 4

By Macrotech Developers Limited

RG-MH-68566 · RERA P51800031532 · Last updated on MahaRERA portal: 25 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 140 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Lodha Kandivali Project - Tower 4 is a Residential / Group Housing project by Macrotech Developers Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031532 on 25 Oct 2021. The registration is recorded completed; possession was promised by 31 May 2025.

At a glance

Project

  • NameLodha Kandivali Project - Tower 4
  • TypeResidential / Group Housing
  • Location
    • AKURLI ROAD
    • AKURLI VILLAGE
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • RERA no.P51800031532
  • ReraGenie IDRG-MH-68566

Builder

  • NameMacrotech Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorRajendra Lodha
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredOct 2021PromisedMay 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Oct 2021
  • Promised completion31 May 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 4NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

TOWER 4: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 25 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes15%
Open ParkingNoNot applicable
Closing ParkingYes45%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered87

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,015 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
RAJESH REAL ESTATE DEVELOPER PRIVATE LIMITEDMumbai CityMumbai City

Approvals and building plan

Permissible FSI8961.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWorli Mumbai 400018

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
EngineerK C Shah Consultants
EngineerMrunal Sawant
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
Lodha Developers Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 May 2025

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Lodha Kandivali Project ­ Tower 4 - P51800031532 - Form 2A.pdf25 Jul 2025
Form 1File: Form 1 - Lodha Kandivali Project Tower 4.pdf27 Jun 2025
Form 2File: Form 2 - Lodha Kandivali Project - Tower 4 - Mar 25.pdf27 Jun 2025
Form 3File: Form-3 -Kandivali T-4 - Mar-25.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold (Lodha Kandivali Tower -4)- Mar 25.pdf27 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Kandivali full OC for Tower 4.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Project Tower 4.pdf2 May 2025
Layout approvalFile: Tower 4.pdf28 Mar 2025
Copy of Layout Approval (in case of layout)File: Tower 4.pdf28 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kandivali T-4 Form-3 Dec-24 Signed.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Kandivali Project - Tower 4 - Dec 24 Signed.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Kandivali T-4 Sold Unsold.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Project Tower 4.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kandivali project tower 4 - Bank correction.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: kandivali tower 4.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: Lodha Kandivali - Tower 4.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kandivali tower 4.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51800031532 - Lodha Kandivali Project ­ Tower 4.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Kandivali Project ­ Tower 4 - P51800031532.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Project ­ Tower 4 - P51800031532 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Project ­ Tower 4 - P51800031532 - June24.pdf7 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Jun 2024
Declaration about Commencement CertificateFile: Wing 4.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Kandivali Project ­ Tower 4 - P51800031532 - March 24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lodha Kandivali Project ­ Tower 4 - P51800031532 - March 24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Kandivali Project ­ Tower 4 - P51800031532 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Kandivali Project ­ Tower 4 - P51800031532 - Dec23.pdf26 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 20231218Wing 5 Full CC.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Project Tower 4 - Sold Unsold - Sep23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivli Project Tower 4 - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Kandivali Project ­ Tower 4.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Project 4 March 23.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Project 4 June 23.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kandivali Tower - 4.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Lodha Woods T4.pdf25 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 71 kandivali project T4.pdf28 Apr 2023
Disclosure of sold/ booked inventoryFile: Kandivali T4.pdf29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf6 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 116 Lodha Kandivali Project ­ Tower 4.pdf14 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf13 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf13 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 117 Lodha Kandivali Project ­ Tower 4.pdf6 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower 4.pdf1 Jul 2022
Disclosure of sold/ booked inventoryFile: Tower 4.pdf1 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 117 Lodha Kandivali Project ­ Tower 4.pdf30 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC for Kandivali.pdf20 Jan 2022
Layout approvalFile: IOD_compressed.pdf16 Dec 2021
Copy of Layout Approval (in case of layout)File: IOD_compressed.pdf16 Dec 2021
Building plan approvalFile: Layout.pdf27 Oct 2021
Building plan approvalFile: Tower 4.pdf27 Oct 2021
Layout approvalFile: Layout.pdf27 Oct 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf27 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Layout.pdf27 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Tower 4.pdf27 Oct 2021
PAN CardFile: Macrotech Developers Ltd PAN CARD.pdf21 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Tower 4 V1.pdf21 Oct 2021
OtherFile: Tower 4 Declaration.pdf21 Oct 2021
Proforma of Allotment letterFile: Sale Agreement Allotment Letter comp.pdf18 Oct 2021
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (1).pdf5 Oct 2021
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf5 Oct 2021
Copy of the legal title reportFile: 1 Copy of the legal title report (1).pdf5 Oct 2021
Details of encumbrancesFile: Encumbrances Tower 4.pdf5 Oct 2021
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (1).pdf5 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf5 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf5 Oct 2021
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf5 Oct 2021
Declaration in FORM BFile: 1 Declaration in FORM B.pdf5 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -Tower 4.pdf5 Oct 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Kandivali Project - Tower 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AKURLI VILLAGE6,700+ in Mumbai Suburban

Builder: Macrotech Developers Limited

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Lodha Kandivali Project - Tower 4 is delayed beyond 31 May 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Kandivali Project - Tower 4?

The registered promoter entity is Macrotech Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Kandivali Project - Tower 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lodha Kandivali Project - Tower 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Kandivali Project - Tower 4?

The professionals named in the filing: Architect: Vilas Desai & Associate; Engineer: K C Shah Consultants; Engineer: Mrunal Sawant; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Kandivali Project - Tower 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Kandivali Project - Tower 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Kandivali Project - Tower 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.