ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Lodha Kandivali Project-Tower 1

Registered No litigation declared Residential / Group Housing project

Lodha Kandivali Project-Tower 1

By Lodha Developers Limited

RG-MH-49062 · RERA P51800045908 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2028Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 93%
6 of 153Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Lodha Kandivali Project-Tower 1 is a Residential / Group Housing project by Lodha Developers Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045908 on 15 Jun 2022. Possession is promised by 28 Feb 2028. The completion date has moved by 12 months from the original filing. 147 of the 153 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLodha Kandivali Project-Tower 1
  • TypeResidential / Group Housing
  • Location
    • AKURLI ROAD
    • KANDIVALI
    • Borivali
    • Mumbai Suburban
    • 400101
  • Pincode400101
  • RERA no.P51800045908
  • ReraGenie IDRG-MH-49062

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • MdAbhishek Mangalprabhat Lodha
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredJun 2022First promiseFeb 2027Revised toFeb 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jun 2022
  • Promised completion28 Feb 2028
  • Revised completionRevised to 28 Feb 2028 (originally 28 Feb 2027)
  • Buildings1 building record
  • Documents filed67 files

Current status

96%147 of 153 units booked
100.0%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA40401530153

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 93%.

Tower 1: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes85%
Street LightingYes70%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes55%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceYes65%
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,469 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2025
LandownerVillageDistrict
Rajesh Real Estate Pvt LtdMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI20813.0
Proposed, not sanctioned18,921 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWORLI
Estimated costRs 130.00 cr
Cost incurredRs 129.94 cr
Work done99.95%
BuildingWingEstimatedIncurred
Tower 1NARs 84.50 crRs 84.46 cr
-NARs 45.50 crRs 45.48 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeep M Kamble
EngineerK C Shah Consultants
EngineerGanesh Humane
EngineerDilip Bade
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
Lodha Developers Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17032620250Feb 2027 → Feb 2028

Reason as filed by the promoterthe project has been delayed due to circumstances beyond the control of the promoter, primarily relating to issues concerning the requirement of Environmental Clearance (EC) and jurisdictional ambiguity between the Central and State authorities for granting such clearance

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602198-Lodha Developers Limited14/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Feb 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - Lodha Kandivali Project-Tower 1 - P51800045908.pdf23 Jun 2026
Withdrawal Update Form 1File: Form1 - Lodha Kandivali Tower -1 - P51800045908.pdf20 Apr 2026
Withdrawal Update Form 2File: Woods Tower 1 Form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: Woods Tower 1 Form-3.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1 kandivali wood 1- Dec-25.pdf24 Jan 2026
Withdrawal Update Form 2File: Lodha Kandivali Tower -1- Form 2.pdf24 Jan 2026
Withdrawal Update Form 3File: Woods Tower 1 Form-3.pdf24 Jan 2026
Withdrawal Update Form 1File: Form-1 Sep-25 Lodha Kandivali Tower -1-P51800045908.pdf25 Oct 2025
Withdrawal Update Form 2File: Form-2 Lodha Kandivali Tower -1 - P51800045908.pdf25 Oct 2025
Withdrawal Update Form 3File: Lodha Kandivali Tower -1 - Form 3.pdf25 Oct 2025
Form 5 (FY 2024-2025)File: Lodha Kandivali Tower 1.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Lodha Kandivali Tower -1 - P51800045908 - Form 2A.pdf25 Jul 2025
Form 1File: Kandivali Tower -1 - Form1 - June25.pdf18 Jul 2025
Form 2File: Form 2 - Woods T1-June-25.pdf18 Jul 2025
Form 3File: Form 3 - Woods T1-june-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Woods T1-June-25.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Layout Tower 1.pdf18 Jul 2025
OthersFile: Latest CC.pdf18 Jul 2025
Form 1File: Form 1 - Lodha Kandivali Tower 1.pdf27 Jun 2025
Form 2File: Form 2 - Lodha Kandivali Project - Tower 1 - Mar 25.pdf27 Jun 2025
Form 3File: Form 3 - Kandivali T-1 (Mar-25).pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold (Lodha Kandivali Tower -1) Mar 25.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Tower 1.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Tower 1.pdf5 May 2025
Building plan approvalFile: Tower 1.pdf28 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Tower 1.pdf28 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kandivali T-1 Dec-24 Form-3 Signed.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lodha Kandivali Tower -1 - Dec 24 Signed.pdf25 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: 2025 02 14-KWC T -1 to 7 As per Approval 19 06 2024 (Expired-19 12 2025).pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Kandivali T-1 Sold Unsold Singed.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Tower 1.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: lodha kandivali tower 1.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51800045908 - Lodha Kandivali Tower -1.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Lodha Kandivali Tower -1 - P51800045908.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Tower -1 - P51800045908 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Tower -1 - P51800045908 - June24.pdf7 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Jun 2024
Declaration about Commencement CertificateFile: Wing 1.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Lodha Kandivali Tower -1 - P51800045908 - March 24.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lodha Kandivali Tower -1 - P51800045908 - March 24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Lodha Kandivali Tower -1 - P51800045908 - Dec23.pdf26 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 20231218Wing 5 Full CC.pdf21 Dec 2023
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Project Tower 1 - Sold Unsold - Sep23.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivli Tower 1 - Form1 - Sep23.pdf21 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Lodha Kandivali Tower -1 - P51800045908.pdf8 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Lodha Kandivali Tower -1.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: Lodha kandivali Tower 1 March 23.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Lodha Kandivali Tower 1 June 23.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Lodha Woods T1.pdf25 May 2023
Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf6 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: 4 Commencement Certificates _ NA Order for plotted development.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3.pdf7 Jun 2022
Details of encumbrancesFile: Encumbrances.pdf30 May 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf30 May 2022
Declaration in FORM BFile: Form B.pdf30 May 2022
Layout approvalFile: IOD_compressed.pdf27 May 2022
Building plan approvalFile: Building Plan_page-0001.pdf27 May 2022
Building plan approvalFile: Building Plan1_page-0001.pdf27 May 2022
Copy of Layout Approval (in case of layout)File: IOD_compressed.pdf27 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_page-0001.pdf27 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan1_page-0001.pdf27 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC for Kandivali.pdf27 May 2022
CERSAI detailsFile: CERSAI-1.pdf27 May 2022
CERSAI detailsFile: CERSAI-2.pdf27 May 2022
PAN CardFile: Macrotech Developers Ltd PAN CARD.pdf26 May 2022
Copy of the legal title reportFile: Title Report Combined RERA Format v1.pdf20 May 2022
Proforma of Allotment letterFile: Sale Agreement and Allotment Letter.pdf20 May 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, Thane140Mar 2022CompletedFeb 2026Jun 2024

How this compares with Mumbai Suburban

96%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lodha Kandivali Project-Tower 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI6,700+ in Mumbai Suburban

Builder: Lodha Developers Limited

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Lodha Kandivali Project-Tower 1 is delayed beyond 28 Feb 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lodha Kandivali Project-Tower 1?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lodha Kandivali Project-Tower 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lodha Kandivali Project-Tower 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lodha Kandivali Project-Tower 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lodha Kandivali Project-Tower 1?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeep M Kamble; Engineer: K C Shah Consultants; Engineer: Ganesh Humane; Engineer: Dilip Bade; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lodha Kandivali Project-Tower 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lodha Kandivali Project-Tower 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lodha Kandivali Project-Tower 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.