Home / Browse projects / LODHA AZZURO

Completed No litigation declared Residential / Group Housing project

LODHA AZZURO

By Macrotech Developers Limited

RG-MH-08144 · RERA P51900000828 · Last updated on MahaRERA portal: 27 Feb 2024

Source: official MahaRERA filing

Red flags

  • 14 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2022Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
14Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

LODHA AZZURO is a Residential / Group Housing project by Macrotech Developers Limited in ., 400033, registered with MahaRERA as P51900000828 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. 14 complaints are on record with the regulator.

At a glance

Project

  • NameLODHA AZZURO
  • TypeResidential / Group Housing
  • Location
    • .
    • 400033
  • Pincode400033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900000828
  • ReraGenie IDRG-MH-08144

Builder

  • NameMacrotech Developers Limited
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonRAJENDRA NARPATMAL LODHA
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
EAST TOWERNA700000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

EAST TOWER: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed424

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots424
Closed/Covered424

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area783 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI23767.05
Proposed, not sanctioned20,750 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort Mumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
PartnerRole in project
Lodha Developers Limited-

Litigation declared4

CaseCourtStatus
819/2013Bombay High CourtPre Admission
42/2016Bombay High CourtPre Admission
86/2016Bombay High CourtPre Admission
889/2015Bombay High CourtPre Admission Not Updated

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC006000000055225Mr Dilip Kumar Goyal and Mrs Jayshree Dilip GoyalM/s Krona Realties Pvt Ltd04/07/2018
CC006000000198752KARISHMA ROHAN PHATARPHEKARMacrotech Developers Limited11/11/2021
CC006000000056650SUMAN DILIP KOTHARI & MAYUR DILIP KOTHARIESQUE FINMARK PVT LTD20/10/2018
CC006000000056669KISHORE KUMAR UMEDMAL KOTHARIM/s ESQUE FINMARK PVT LTD21/10/2018
CC006000000057558KISHORE KUMAR UMEDMAL KOTHARIM/s ESQUE FINMARK PVT LTD06/01/2019
CC006000000057559JAYSHREE K JAINM/s ESQUE FINMARK PVT LTD06/01/2019
CC006000000056671KAMLESH CHAMPALAL DOLANI & YOGITA KAMLESH DOLANIM/s ESQUE FINMARK PVT LTD21/10/2018
CC006000000057401KAMLESH CHAMPALAL DOLANI & YOGITA KAMLESH DOLANIM/s Esque Finmark Pvt Ltd06/01/2019
CC006000000056673RAJESH BASTIMAL MEHTAM/s ESQUE FINMARK PVT LTD21/10/2018
CC006000000057398RAJESH BASTIMAL MEHTAM/s ESQUE FINMARK PVT LTD06/01/2019
CC006000000056815RAJESH FUTERMAL JAIN & BABULAL MULCHAND SOLANKIM/s ESQUE FINMARK PVT LTD02/11/2018
CC006000000056818Mrs. SHARMILA MUKESH JAINM/s ESQUE FINMARK PVT LTD02/11/2018
CC006000000056821MUKESH R SHAHM/s ESQUE FINMARK PVT LTD02/11/2018
CC006000000195624Mrs. Deepa PahujaMacrotech Developers Limited05/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jul 2022

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold Unsold - LODHA AZZURO - P51900000828 - Dec23.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: Lodha Azzuro-P51900000828-Sep23.pdf22 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 23 LODHA AZZURO.pdf14 Nov 2022
Architect’s Certificate on Completion of Project (Form 4)File: LODHA AZZURO.pdf23 Aug 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1.pdf25 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2_compressed.pdf25 Jul 2022
Disclosure of sold/ booked inventoryFile: LODHA AZZURO.pdf27 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 52 LODHA AZZURO.pdf17 Dec 2021
Certificates of CA (Form 3)File: 23 LODHA AZZURO.pdf15 Dec 2021
Form 2AFile: 93 LODHA AZZURO.pdf18 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 52 LODHA AZZURO.pdf3 Nov 2021
Certificates of CA (Form 3)File: LODHA AZZURO.pdf3 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 51_AZZURO.pdf15 Oct 2021
Disclosure of sold/ booked inventoryFile: P51900000828.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 111 LODHA AZZURO.pdf15 Oct 2021
Form 2AFile: Arvind Mishra Form 2A-1.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 130 Lodha Azzuro.pdf27 Oct 2020
Form 2AFile: Azzuro.pdf27 Aug 2020
Certificates of CA (Form 5)File: Lodha Azuro.pdf11 Oct 2019
Form 2AFile: Lodha Azzurro.pdf17 Jun 2019
OtherFile: LDL to MDL.pdf29 May 2019
Building plan approvalFile: 2018_11_30_Kalachowky_Amended IOA for Sale Bldg_compressed.pdf26 Dec 2018
Building plan approvalFile: DRAWINGS 1 TO 4.pdf26 Dec 2018
Building plan approvalFile: DRAWINGS 5 TO 10.pdf26 Dec 2018
Building plan approvalFile: DRAWINGS 11 TO 16.pdf26 Dec 2018
Building Plan Approval (IOD)File: 2018_11_30_Kalachowky_Amended IOA for Sale Bldg_compressed.pdf26 Dec 2018
Building Plan Approval (IOD)File: DRAWINGS 1 TO 4.pdf26 Dec 2018
Building Plan Approval (IOD)File: DRAWINGS 5 TO 10.pdf26 Dec 2018
Building Plan Approval (IOD)File: DRAWINGS 11 TO 16.pdf26 Dec 2018
Details of encumbrancesFile: Lodha Azzuro.pdf16 Nov 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: Azzuro.pdf13 Nov 2018
Certificates of CA (Form 5)File: LODHA AZZURO.pdf1 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: 2018_07_05 Lodha Azzuro CC till 36th fl.pdf7 Jul 2018
Copy of the legal title reportFile: 18_Supplemental dated 03_04_2018 Kalachowkie.pdf17 May 2018
Details of encumbrancesFile: Lodha Azzuro.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: CC final.pdf31 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC final.pdf19 Jan 2018
Copy of the legal title reportFile: Venezia Supplemental Report on Title dated 22-12-2017.pdf22 Dec 2017
Proforma of Allotment letterFile: ATS (Venezia-Azzuro) - v2 - 2 November 2017.pdf6 Nov 2017
PAN CardFile: SARAVASA BUILDTECH AND FARM PVT PAN.pdf18 Jul 2017
Building plan approvalFile: IOD 10 Submitted - Final.pdf14 Jul 2017
Building plan approvalFile: IOD_13.pdf14 Jul 2017
Building plan approvalFile: IOD_16.pdf14 Jul 2017
Building plan approvalFile: IOD_5.pdf14 Jul 2017
Building plan approvalFile: IOD_6.pdf14 Jul 2017
Building plan approvalFile: IOD_7.pdf14 Jul 2017
Building plan approvalFile: IOD_8.pdf14 Jul 2017
Building plan approvalFile: IOD_9.pdf14 Jul 2017
Layout approvalFile: Plan Layout.pdf14 Jul 2017
Details of encumbrancesFile: Lodha Azzuro.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: Plan Layout.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_5.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_6.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_7.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_8.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_9.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD 10 Submitted - Final.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_13.pdf14 Jul 2017
Building Plan Approval (IOD)File: IOD_16.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lodha Azzuro Form 1.pdf14 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Lodha Azzuro Form 2.pdf14 Jul 2017
Certificates of CA (Form 3)File: Lodha Azzuro (R).pdf12 Jul 2017
Copy of the legal title reportFile: Merged File Uploaded.pdf11 Jul 2017
Declaration in FORM BFile: Lodha Azzuro.pdf11 Jul 2017
Proforma of Allotment letterFile: ATS and Allotment Letter.pdf11 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Liana BP51700033964Dombivali, ThaneMar 2022CompletedFeb 2026Jun 2024

Keep LODHA AZZURO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .

2 kmLODHA AZZUROCompleted 3Lapsed / revoked 4Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Macrotech Developers Limited

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if LODHA AZZURO is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LODHA AZZURO?

The registered promoter entity is Macrotech Developers Limited, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LODHA AZZURO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LODHA AZZURO?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LODHA AZZURO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LODHA AZZURO?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LODHA AZZURO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LODHA AZZURO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LODHA AZZURO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.