ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / LK ELEGANCE

Completed No litigation declared Others project

LK ELEGANCE

By L K INFRACON LLP

RG-MH-18394 · RERA P51800076823 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedregistration recorded completed
0 of 11Construction stages donefurthest along: Excavation, 80%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

LK ELEGANCE is a Others project by L K INFRACON LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076823 on 28 Jun 2024. The registration is recorded completed; possession was promised by 31 Mar 2028.

At a glance

Project

  • NameLK ELEGANCE
  • TypeOthers
  • Location
    • TANAJI NAGAR ROAD
    • KURAR VILLAGE MALAD EAST
    • Kurar
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • RERA no.P51800076823
  • ReraGenie IDRG-MH-18394

Builder

  • NameL K INFRACON LLP
  • Entity typePartnership
  • PartnersKETAN KHIMJI GADA, LATESH KHIMJI GADA
  • Other registrations7 more →
  • Completed7 of 8
  • Declared earlier projects6 →

Key dates

this monthRegisteredJun 2024PromisedMar 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LK ELEGANCENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

LK ELEGANCE: 16% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor70%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area765 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
KETAN K GADAMaladMumbai Suburban
KURARABAD DARSHAN CHSLKurarMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2271.15
Proposed, not sanctioned2,271 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHAH TRADE CENTER RANI SATI MARG MALAD EAST MUMBAI 400097

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPARIVARTAN ARCHITECTS AND ENGINEERS
EngineerHARESH L PATEL
Chartered AccountantGCAS AND ASSOCIATES LLP
Chartered AccountantVANDANA V. DODHIA & CO.
PartnerRole in project
L K INFRACON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Occupation Certificate.pdf5 May 2026
Occupational CertificateFile: FORM 4.pdf5 May 2026
Occupational CertificateFile: ALL SIDE PHOTO.pdf5 May 2026
Occupational CertificateFile: Occupation Plan.pdf5 May 2026
Form 1File: FORM-1 ARCHITECT CERTIFICATE.pdf30 Apr 2026
Form 2File: form 2-Engineer certificate.pdf30 Apr 2026
Form 3File: FORM 3.pdf30 Apr 2026
OthersFile: ALL SIDE PHOTO.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf30 Apr 2026
Form 1File: FORM-1 ARCHITECT CERTIFICATE FOR RERA.pdf19 Jan 2026
Form 2File: Form 2 Engineers Certificate for RERA RCC Haresh Patel.pdf19 Jan 2026
Form 3File: FORM 3 CA CERTIFICATE .pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY 31122025.pdf19 Jan 2026
OthersFile: ALL SIDE BUILDING PHOTO.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25.pdf28 Nov 2025
Form 1File: FORM 1.pdf18 Oct 2025
Form 2File: FORM 2 Engineer certificate.pdf18 Oct 2025
Form 3File: FORM 3.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf18 Oct 2025
OthersFile: CURRENT PHOTO SITE.pdf18 Oct 2025
Form 1File: FORM-1 ARCHITECT CERTIFICATE FOR RERA.pdf17 Jul 2025
Form 2File: Form 2 Engineers Certificate for RERA RCC Haresh Patel.pdf17 Jul 2025
Form 3File: Form -3 CA CERTIFICATE .pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD & BOOKED INVENTORY LIST.pdf17 Jul 2025
OthersFile: BUILDING PHOTO ALL SIDE.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE FOR RERA.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf21 Apr 2025
Other - TechnicalFile: PHOTO.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE FOR RERA.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate for RERA RCC Haresh Patel.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf22 Jan 2025
Other - TechnicalFile: BUILDING PHOTO.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf28 Oct 2024
Other - TechnicalFile: Full photo.pdf28 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: FULL CC.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LK ELEGANCE FORM 3.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LK ELEGANCE FORM 3.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf10 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A form 39 disclosure of intrest in other Real Estate Organizations- KETAN K GADA.5 Jun 2024
Proforma of Allotment letterFile: MODEL FORM ALLOTMENT LETTER-FINAL.pdf5 Jun 2024
CERSAI detailsFile: UNDERTAKING OF NO CERSAI.pdf29 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A for rera - UPLOAD OF LETTER FOR SBI BANK AC UPDATION IN RERA.pdf29 May 2024
Declaration in FORM BFile: Form B - Declaration by Developer (2).pdf24 May 2024
Declaration in FORM BFile: Form B - Declaration Land Owner_compressed.pdf24 May 2024
Other - TechnicalFile: Annexure-A Declaration Cum undertaking.pdf24 May 2024
Layout approvalFile: IOD DRAWING WITH FUNGIBLE CHART DATED.pdf23 May 2024
Building plan approvalFile: IOD DRAWING WITH FUNGIBLE CHART DATED.pdf23 May 2024
PAN CardFile: L K Infracon LLP Pan Card.pdf23 May 2024
Copy of the legal title reportFile: Title Certificate Rera Format at the time of Rera certificate obtain.pdf23 May 2024
Details of encumbrances concerned to FinanceFile: DECLARATION FOR ENCUMBRANCES.pdf23 May 2024
Details of encumbrances concerned to LegalFile: DECLARATION FOR ENCUMBRANCES.pdf23 May 2024
Copy of Layout Approval (in case of layout)File: IOD DRAWING WITH FUNGIBLE CHART DATED.pdf23 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWING WITH FUNGIBLE CHART DATED.pdf23 May 2024
Commencement Certificates / NA Order for plotted developmentFile: PLINTH CC COMMENCEMENT CERTIFICATE.pdf23 May 2024
Declaration about Commencement CertificateFile: DECLARATION OF CC RERA FORMAT.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE FOR RERA.pdf23 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineers certificate.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: DECLARATION SOLD OR BOOKED INVENTORY L K INFRACON LLP.pdf23 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A form 39 disclosure of intrest in other Real Estate Organizations- LATESH K GADA23 May 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE.pdf23 May 2024
Status of ConveyanceFile: Deemed Conveyance of Kurarabad Darshan CHSL.pdf23 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for rera- ALLOTMENT LETTER - LK LETTER HEAD.pdf23 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for rera- Agreement for Sale- LK LETTER HEAD.pdf23 May 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RUPALIAPNA RUPALI CHSL OPP ST GEORGE SCHOOL KURAR VILLAGE MALAD EAST MUMBAI 40009735CompletedMar 2026Apr 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LK ELEGANCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURAR VILLAGE MALAD EAST6,700+ in Mumbai Suburban

Builder: L K INFRACON LLP

L K INFRACON LLP has 8 registrations on MahaRERA, including KURAR SANGEETA APRTMENT CHS LTD and SHRI ANAND CO-OPERATIVE HOUSING SOCIETY LTD. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LK ELEGANCE is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LK ELEGANCE?

The registered promoter entity is L K INFRACON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LK ELEGANCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LK ELEGANCE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LK ELEGANCE?

The professionals named in the filing: Architect: PARIVARTAN ARCHITECTS AND ENGINEERS; Engineer: HARESH L PATEL; Chartered Accountant: GCAS AND ASSOCIATES LLP; Chartered Accountant: VANDANA V. DODHIA & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LK ELEGANCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LK ELEGANCE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LK ELEGANCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.