ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Lijjat Ganga

Registered No litigation declared Residential / Group Housing project

Lijjat Ganga

By Jay Associates

RG-MH-24700 · RERA P51800008570 · Last updated on MahaRERA portal: 2 Mar 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 91 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 91 months from the original
19 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 90%
41 of 70Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 184 documents Report an error

Lijjat Ganga is a Residential / Group Housing project by Jay Associates in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008570 on 19 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 91 months from the original filing. 29 of the 70 units on this registration are recorded sold or booked, and 19 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameLijjat Ganga
  • TypeResidential / Group Housing
  • Location
    • Sane Guruji Road
    • Sane Guruji Nagar
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008570
  • ReraGenie IDRG-MH-24700

Builder

  • NameJay Associates
  • Entity typePartnership
  • PartnerShriram laxman Joshi

Key dates

this monthRegisteredAug 2017First promiseMay 2019Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 May 2019)
  • Buildings4 building records
  • Documents filed184 files

Current status

41%29 of 70 units booked
85.1%Work done, per cost certificate

Figures as on 2 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA6515015
Wing BNA6515015
Wing CNA9824024
Wing DNA10816016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 2 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Wing A68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Wing B66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes70%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes5%
Water conservation /Rain water harvestingYes10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes10%

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Closed/Covered60
Open Space3
BuildingClosed/CoveredOpen SpaceTotal
Wing A15015
Wing B15116
Wing C15116
Wing D15116

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,886 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Oct 2025

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI5093.0
Proposed, not sanctioned4,320 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLT Road, Hanuman Chowk, Mulund East, Mumbai 400081
Estimated costRs 5.40 cr
Cost incurredRs 4.59 cr
Work done85.09%
BuildingWingEstimatedIncurred
Wing ANARs 1.22 crRs 1.03 cr
Wing BNARs 1.22 crRs 1.03 cr
Wing CNARs 1.22 crRs 1.03 cr
Wing DNARs 1.22 crRs 1.03 cr
-NARs 54.00 lakhRs 45.95 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMG Ranade
ArchitectS Architect
EngineerEpicon Consultants Pvt Ltd
EngineerTriStar Engineering Consultants
EngineerQamrul Hasan
Chartered AccountantUmang Dedhia & Co Chartered Accountants
Chartered AccountantRonak A Jain & Associates
Chartered AccountantJainam Doshi & Associates
PartnerRole in project
Jay Associates-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001830May 2019 → May 2020

Reason as filed by the promoterThe plot had suffered various approvals issue and caused delay, initially from introduction of fungible the permission was cancelled and entire plans were revised, later on affected by reservation due to DCPR 2034 (Garden reservation on an existing residential plot), which was then deleted and order for the same has been obtained. Then the plot was affected due to utilization of TDR due to Road Width TDR Policy as the road abutting the plot was lower then the required width, then separate status was obtained and the issue was resolved. Due to all this, there has been delay in execution and the

EXT51800019643May 2019 → Jun 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 93.1% allottees for purpose of extension of RERA registration period of the said project

EA27102518180May 2019 → Dec 2026

Reason as filed by the promoterWe, Jay Associates, hereby declare the following with respect to the project “Lijjat Ganga” bearing registration number P51800008570 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupation Certificate (OC)

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000397468SAGAR MANOHAR NARKARJAY ASSOCIATES12/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed184

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 184 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 FINAL.pdf2 Mar 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 for December 2025.pdf2 Mar 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 FINAL.pdf2 Mar 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 for December 2025.pdf2 Mar 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 Final.pdf2 Mar 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 for December 2025.pdf2 Mar 2026
Form 1File: Form 1 September 2017.pdf27 Oct 2025
Form 2File: Form 2 September 2017.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga September 2017.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2017.pdf27 Oct 2025
Form 1File: Form 1 December 2017.pdf27 Oct 2025
Form 2File: Form 2 December 2017.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga December 2017.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2017.pdf27 Oct 2025
Form 1File: Form 1 March 2018.pdf27 Oct 2025
Form 2File: Form 2 March 2018.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga March 2018.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2018.pdf27 Oct 2025
Form 1File: Form 1 June 2018.pdf27 Oct 2025
Form 2File: Form 2 June 2018.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga June 2018.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2018.pdf27 Oct 2025
Form 1File: Form 1 September 2018.pdf27 Oct 2025
Form 2File: Form 2 September 2018.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga September 2018.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2018.pdf27 Oct 2025
Form 1File: Form 1 December 2018.pdf27 Oct 2025
Form 2File: Form 2 December 2018.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga December 2018.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2018.pdf27 Oct 2025
Form 1File: Form 1 March 2019.pdf27 Oct 2025
Form 2File: Form 2 March 2019.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga March 2019.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2019.pdf27 Oct 2025
Form 1File: Form 1 June 2019.pdf27 Oct 2025
Form 2File: Form 2 June 2019.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga June 2019.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2019.pdf27 Oct 2025
Form 1File: Form 1 September 2019.pdf27 Oct 2025
Form 2File: Form 2 September 2019.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga September 2019.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2019.pdf27 Oct 2025
Form 1File: Form 1 December 2019.pdf27 Oct 2025
Form 2File: Form 2 December 2019.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga December 2019.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2019.pdf27 Oct 2025
Form 1File: Form 1 March 2020.pdf27 Oct 2025
Form 2File: Form 2 March 2020.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga March 2020.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2020.pdf27 Oct 2025
Form 1File: Form 1 June 2020.pdf27 Oct 2025
Form 2File: Form 2 June 2020.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga June 2020.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2020.pdf27 Oct 2025
Form 1File: Form 1 September 2020.pdf27 Oct 2025
Form 2File: Form 2 September 2020.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga September 2020.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2020.pdf27 Oct 2025
Form 1File: Form 1 December 2020.pdf27 Oct 2025
Form 2File: Form 2 December 2020.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga December 2020.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2020.pdf27 Oct 2025
Form 1File: Form 1 March 2021.pdf27 Oct 2025
Form 2File: Form 2 March 2021.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga March 2021.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 March 2021.pdf27 Oct 2025
Form 1File: Form 1 June 2021.pdf27 Oct 2025
Form 2File: Form 2 June 2021.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga June 2021.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 June 2021.pdf27 Oct 2025
Form 1File: Form 1 September 2021.pdf27 Oct 2025
Form 2File: Form 2 September 2021.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga September 2021.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 September 2021.pdf27 Oct 2025
Form 1File: Form 1 December 2021.pdf27 Oct 2025
Form 2File: Form 2 December 2021.pdf27 Oct 2025
Form 3File: Form 3 RERA_Lijjat Ganga December 2021.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 December 2021.pdf27 Oct 2025
Form 1File: Form 1 March 2022.pdf27 Oct 2025
Form 2File: Form 2 March 2022.pdf27 Oct 2025

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 91 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lijjat Ganga on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sane Guruji Nagar6,700+ in Mumbai Suburban

2 kmLijjat GangaCompleted 101Lapsed / revoked 85Other 124Dot size: filed unitsN

Filed coordinates, straight-line distance. 310 registered projects within 2 km.

Builder: Jay Associates

Jay Associates has 1 registration on MahaRERA, including Lijjat Ganga. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Lijjat Ganga is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lijjat Ganga?

The registered promoter entity is Jay Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lijjat Ganga?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lijjat Ganga?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lijjat Ganga?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lijjat Ganga?

The professionals named in the filing: Architect: MG Ranade; Architect: S Architect; Engineer: Epicon Consultants Pvt Ltd; Engineer: TriStar Engineering Consultants; Engineer: Qamrul Hasan; Chartered Accountant: Umang Dedhia & Co Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lijjat Ganga?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lijjat Ganga. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lijjat Ganga to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.