Registration lapsed No litigation declared Residential / Group Housing project

Lifescapes Siddhant

By Meridian Construction Pvt. Ltd.

RG-MH-03307 · RERA P51900020887 · Last updated on MahaRERA portal: 10 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Lifescapes Siddhant is a Residential / Group Housing project by Meridian Construction Pvt. Ltd. in Mumbai City, Maharashtra, registered with MahaRERA as P51900020887 on 16 May 2019. Possession was promised by 31 Jul 2025 and is now 15 months past that date. The completion date has moved by 7 months from the original filing.

At a glance

Project

  • NameLifescapes Siddhant
  • TypeResidential / Group Housing
  • Location
    • Falkland Road
    • Khetwadi
    • Mumbai City
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900020887
  • ReraGenie IDRG-MH-03307

Builder

  • NameMeridian Construction Pvt. Ltd.
  • Entity typeCompany
  • DirectorManav Harresh Mehta
  • Declared earlier projects1 →

Key dates

15 months past promisethis monthRegisteredMay 2019First promiseDec 2024Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 May 2019
  • Promised completion31 Jul 2025
  • Revised completionRevised to 31 Jul 2025 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed117 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lifescapes SiddhantNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Lifescapes Siddhant: 57% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,696 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13961.78
Proposed, not sanctioned11,462 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhetwadi Mumbai - 4

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs Degign Group
PartnerRole in project
Meridian Construction Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900025687Dec 2024 → Jul 2025

Reason as filed by the promoterWe request a short extension of 7 months upto 31st July, 2025 for the completion of the Lifescapes Siddhant project. Since, last 2 months we have worked in a fast paced manner and achieved faster completion of the Time Line. We hereby revised our plan of action and are now seeking an extension to complete the project by 31st July, 2025. The primary reason for this request is, our commitment to ensuring the project is completed with the highest standards of quality and safety. To meet the new target date, we have taken proactive measures by increasing the efficiency and worked in dynamic level

Litigation declared1

CaseCourtStatus
2572/2016City Civil Court MumbaiMatter is posted for written statement

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Siddhant _Form 1 -Q-1_ 25-26.pdf10 Oct 2025
Form 2File: FORM 2 - Siddhant - Q1 25-26.pdf10 Oct 2025
Form 3File: RERA_Form 3_Siddhant_Q1 FY 25-26.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Siddhant Inventory Disclosure_Q1 FY 25-26.pdf10 Oct 2025
Form 1File: Siddhant _Form 1 -Q-4 _24-25..pdf4 Jun 2025
Form 2File: FORM 2 - Siddhant - Q4 24-25.pdf4 Jun 2025
Form 3File: RERA_Form 3_Siddhant_Q4 FY 24-25.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Siddhant Inventory Disclosure - Q-4 2024-25.pdf4 Jun 2025
Other - TechnicalFile: Siddhant_Estimated Timeline_28022025.pdf12 Mar 2025
Declaration in FORM BFile: Form B_Siddhant.pdf11 Mar 2025
Certificates of CA (Form 3)File: RERA_Form 3_Siddhant_Q3 FY 24-25.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: Siddhant Inventory Disclosure_Q3 FY 24-25.pdf6 Feb 2025
Declaration about Commencement CertificateFile: Format D - Declaration about CC_Siddhant.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q3 24-25.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-3 24-25.pdf20 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 2430529_FurtherCC_signed.pdf27 Dec 2024
Declaration in FORM BFile: Form B Declaration_Siddhant.pdf21 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC revalidation_Siddhant.pdf21 Dec 2024
Certificates of CA (Form 3)File: RERA Form 3 Siddhant Q1 FY 24-25.pdf20 Dec 2024
Certificates of CA (Form 3)File: RERA Form 3 Siddhant Q2 FY 24-25.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Lifescapes Siddhant FY 24-25 Q 2.pdf20 Dec 2024
Disclosure of sold/ booked inventoryFile: Siddhant Inventory Discloure Q2_FY 24-25.pdf20 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration Rera Bank Account_Siddhant.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int in other Org_ Manav.pdf20 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int in other Org_Damini.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-1 24-25.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-2 24-25-.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q1 24-25.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Siddhant_Inventory Disclosure Q1 FY 24-25.pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Siddhant - 2023-2024.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Siddhant-FY 23 24.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-4 23-24.pdf12 Dec 2024
Certificates of CA (Form 3)File: Form 3 Lifescapes Siddhant Q4 FY 23-24.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q4 23-24.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Siddhant Disclosure Q4 23-24.pdf12 Dec 2024
Home Buyer /Allottee Grievance Redressal CellFile: Appointment Letter - GRO - Siddhant.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Siddhant Disclosure Q3 FY 23-24.pdf22 Mar 2024
Certificates of CA (Form 3)File: Siddhant_Form 3_Q3 FY 23-24.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-3 23-24.pdf19 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q3 23-24.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-2 23-24 sign.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q2 23-24.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: Siddhant_Inventory Disclosure_Q2 FY 23-24.pdf12 Mar 2024
Certificates of CA (Form 3)File: FORM 3-Lifescapes Siddhant-Q 2.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q1 23-24.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1_Q1_FY 23-24.pdf28 Dec 2023
Disclosure of sold/ booked inventoryFile: Siddhant Disclosure Q1 23-24.pdf28 Dec 2023
Certificates of CA (Form 3)File: FORM 3-LIFESCAPES SIDDHANT-Q 1.pdf28 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_Siddhant_FY 22 23.pdf19 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure - Lifescapes Siddhant - Q3.pdf12 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclore Siddhant 31_03_2023 - Q4.pdf12 Dec 2023
Certificates of CA (Form 3)File: FORM 3-LIFESCAPES SIDDHANT-Q 4.pdf12 Dec 2023
Building plan approvalFile: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 6.pdf26 Sep 2023
Building plan approvalFile: Lifescapes Siffhant_Approved Plan_20-09-2023 Part1.pdf26 Sep 2023
Building plan approvalFile: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 2.pdf26 Sep 2023
Building plan approvalFile: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 3.pdf26 Sep 2023
Building plan approvalFile: Lifescapes Siffhant_Approved Plan_20-09-2023 part 4.pdf26 Sep 2023
Building plan approvalFile: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 5.pdf26 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siffhant_Approved Plan_20-09-2023 Part1.pdf26 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 2.pdf26 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 3.pdf26 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siffhant_Approved Plan_20-09-2023 part 4.pdf26 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 5.pdf26 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siffhant_Approved Plan_20-09-2023 Part 6.pdf26 Sep 2023
Building plan approvalFile: Lifescapes Siddhant_Amended _IOD_20_09_2023.pdf21 Sep 2023
Building Plan Approval (IOD)File: Lifescapes Siddhant_Amended _IOD_20_09_2023.pdf21 Sep 2023
Certificates of CA (Form 3)File: LIFESCAPES Siddhant_FY 22-23_Q 1.pdf3 Aug 2023
Certificates of CA (Form 3)File: RERA_Form 3_Siddhant_Q3 FY 22-23.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-1 22-23.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-2 22-23.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-3 22-23.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhant _Form 1 -Q-4 22-23.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q1 22-23.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q2 22-23.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q4 22-23.pdf2 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Siddhant - 2022-2023.pdf2 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC upto 23 floor dated 24052023.pdf26 May 2023
Certificates of CA (Form 3)File: Lifescapes Siddhant FY 22 23 Q2.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Lifescapes Siddhant Form 5.pdf24 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Siddhant - Q3 22-23.pdf2 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Lifescapes HariharP51900014987KhetwadiJan 2018CompletedDec 2018Dec 2018

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one moved by 7 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is among them

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lifescapes Siddhant on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khetwadi780+ in Mumbai City

2 kmLifescapes SiddhantCompleted 34Lapsed / revoked 39Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 176 registered projects within 2 km.

Builder: Meridian Construction Pvt. Ltd.

Meridian Construction Pvt. Ltd. has 1 registration on MahaRERA, including Lifescapes Siddhant. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What does it mean that Lifescapes Siddhant shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Lifescapes Siddhant is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lifescapes Siddhant?

The registered promoter entity is Meridian Construction Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lifescapes Siddhant?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lifescapes Siddhant?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lifescapes Siddhant?

The professionals named in the filing: Architect: Ms Degign Group. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lifescapes Siddhant?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lifescapes Siddhant. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lifescapes Siddhant to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.