Home / Browse projects / Lifescapes Mirage

Completed No litigation declared Residential / Group Housing project

Lifescapes Mirage

By Rohan Developers Pvt. Ltd.

RG-MH-10388 · RERA P51900001725 · Last updated on MahaRERA portal: 28 Dec 2018

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 3 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Mar 2018Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 21 documents Report an error

Lifescapes Mirage is a Residential / Group Housing project by Rohan Developers Pvt. Ltd. in 400016, registered with MahaRERA as P51900001725 on 29 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2018. The completion date has moved by 3 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameLifescapes Mirage
  • TypeResidential / Group Housing
  • Location
    • 400016
  • Pincode400016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900001725
  • ReraGenie IDRG-MH-10388

Builder

  • NameRohan Developers Pvt. Ltd.
  • Entity typeCompany
  • Managing DirectorHarresh Navnitrai Mehta
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseDec 2017Revised toMar 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion31 Mar 2018
  • Revised completionRevised to 31 Mar 2018 (originally 31 Dec 2017)
  • Buildings1 building record
  • Documents filed21 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lifescapes MirageNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Dec 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Lifescapes Mirage: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Dec 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered70

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,335 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5407.97
Proposed, not sanctioned5,153 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMoulana Shaukat Ali Road, Grant Road , Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. 1 Architectural Consultants
ArchitectM/s. Design Group
EngineerMr. Nikhil Shanghvi
PartnerRole in project
Rohan Developers Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900000015Dec 2017 → Mar 2018

Reason as filed by the promoterProject is complete in all regards with Occupation Certificate of entire building excluding 2 flats on the topmost floor of sale portion, due to compliance issues. However, the 2 flats mentioned have not been sold/allotted to anyone as on date. The full O.C. for the building will be acquired at the earliest.

Litigation declared3

CaseCourtStatus
2690/2016City Civil Court at MumbaiFor reply
4105016/SS/2016 /2016Metropolitan Magistrate Shindewadi DadarNot Heard
4105017/SS/2016 /2016Metropolitan Magistrate Shindewadi DadarNot Heard

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000012524Mukesh Surji MaruRohan Mehta21/12/2017
CC006000000161273Pramod LeleRohan Developers Pvt. Ltd.05/11/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed21

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 5)File: Lifescapes Mirage.pdf28 Dec 2018
Certificates of Architect (Form 4)File: Form -4 - Mirage.pdf28 Dec 2018
OtherFile: OC_Narayn Baug.pdf5 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Narayan Baug.pdf31 May 2018
OtherFile: Mirage OC Certificate.pdf15 Dec 2017
Building plan approvalFile: Amended_ 18-02-2015_Sheet1.pdf24 Jul 2017
Details of encumbrancesFile: Mirage - Encumbarances merged.pdf24 Jul 2017
Building Plan Approval (IOD)File: Amended_ 18-02-2015_Sheet1.pdf24 Jul 2017
Declaration in FORM BFile: Form B - Mirage.pdf24 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mirage - Architects Certificate.pdf24 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mirage Engineer Certificate.pdf24 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - Lifescapes Mirage.pdf24 Jul 2017
Proforma of Allotment letterFile: Sale agreement and Allotment letter.pdf24 Jul 2017
OtherFile: Proposed 20th floor.pdf24 Jul 2017
Layout approvalFile: Mirage-Declaration for no layout.pdf23 Jul 2017
Copy of Layout Approval (in case of layout)File: Mirage-Declaration for no layout.pdf23 Jul 2017
Building plan approvalFile: Approval Letter.pdf15 Jul 2017
Building Plan Approval (IOD)File: Approval Letter.pdf15 Jul 2017
PAN CardFile: RDPL PAN Card.pdf12 Jul 2017
Copy of the legal title reportFile: Title Certificate Mirage.pdf12 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf12 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Lifescapes AashianaNepean Sea Road41CompletedDec 2014Late, Jun 2016

Keep Lifescapes Mirage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

Builder: Rohan Developers Pvt. Ltd.

Rohan Developers Pvt. Ltd. has 5 registrations on MahaRERA, including Lifescapes Mirage and 7 Hughes. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Lifescapes Mirage is delayed beyond 31 Mar 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lifescapes Mirage?

The registered promoter entity is Rohan Developers Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lifescapes Mirage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lifescapes Mirage?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lifescapes Mirage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lifescapes Mirage?

The professionals named in the filing: Architect: M/s. 1 Architectural Consultants; Architect: M/s. Design Group; Engineer: Mr. Nikhil Shanghvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lifescapes Mirage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lifescapes Mirage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lifescapes Mirage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.