Home / Browse projects / Lifescapes Mirage
Lifescapes Mirage
RG-MH-10388 · RERA P51900001725 · Last updated on MahaRERA portal: 28 Dec 2018
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 3 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lifescapes Mirage is a Residential / Group Housing project by Rohan Developers Pvt. Ltd. in 400016, registered with MahaRERA as P51900001725 on 29 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2018. The completion date has moved by 3 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameLifescapes Mirage
- TypeResidential / Group Housing
- Location
- 400016
- Pincode400016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900001725
- ReraGenie IDRG-MH-10388
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on29 Jul 2017
- Promised completion31 Mar 2018
- Revised completionRevised to 31 Mar 2018 (originally 31 Dec 2017)
- Buildings1 building record
- Documents filed21 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Lifescapes Mirage | NA | 26 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Dec 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Lifescapes Mirage: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Dec 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed70
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s. 1 Architectural Consultants |
| Architect | M/s. Design Group |
| Engineer | Mr. Nikhil Shanghvi |
| Partner | Role in project |
|---|---|
| Rohan Developers Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject is complete in all regards with Occupation Certificate of entire building excluding 2 flats on the topmost floor of sale portion, due to compliance issues. However, the 2 flats mentioned have not been sold/allotted to anyone as on date. The full O.C. for the building will be acquired at the earliest.
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 2690/2016 | City Civil Court at Mumbai | For reply |
| 4105016/SS/2016 /2016 | Metropolitan Magistrate Shindewadi Dadar | Not Heard |
| 4105017/SS/2016 /2016 | Metropolitan Magistrate Shindewadi Dadar | Not Heard |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000012524 | Mukesh Surji Maru | Rohan Mehta | 21/12/2017 |
| CC006000000161273 | Pramod Lele | Rohan Developers Pvt. Ltd. | 05/11/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed21
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 5)File: Lifescapes Mirage.pdf | 28 Dec 2018 |
| Certificates of Architect (Form 4)File: Form -4 - Mirage.pdf | 28 Dec 2018 |
| OtherFile: OC_Narayn Baug.pdf | 5 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Narayan Baug.pdf | 31 May 2018 |
| OtherFile: Mirage OC Certificate.pdf | 15 Dec 2017 |
| Building plan approvalFile: Amended_ 18-02-2015_Sheet1.pdf | 24 Jul 2017 |
| Details of encumbrancesFile: Mirage - Encumbarances merged.pdf | 24 Jul 2017 |
| Building Plan Approval (IOD)File: Amended_ 18-02-2015_Sheet1.pdf | 24 Jul 2017 |
| Declaration in FORM BFile: Form B - Mirage.pdf | 24 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Mirage - Architects Certificate.pdf | 24 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mirage Engineer Certificate.pdf | 24 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate - Lifescapes Mirage.pdf | 24 Jul 2017 |
| Proforma of Allotment letterFile: Sale agreement and Allotment letter.pdf | 24 Jul 2017 |
| OtherFile: Proposed 20th floor.pdf | 24 Jul 2017 |
| Layout approvalFile: Mirage-Declaration for no layout.pdf | 23 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Mirage-Declaration for no layout.pdf | 23 Jul 2017 |
| Building plan approvalFile: Approval Letter.pdf | 15 Jul 2017 |
| Building Plan Approval (IOD)File: Approval Letter.pdf | 15 Jul 2017 |
| PAN CardFile: RDPL PAN Card.pdf | 12 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate Mirage.pdf | 12 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 12 Jul 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Lifescapes Aashiana | Nepean Sea Road | 41 | Completed | Dec 2014 | Late, Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 21 filed documents as one ZIP, foldered, with a manifest
Keep Lifescapes Mirage on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near this project
Island Cove
LH Residential Housing Private Limited
Midtown Bay
Rising Sun Impex Private Limited
Island Cove Tower 4
LH Residential Housing Private Limited, Sh
Bayline Residences
HRUB Infra Projects Pvt Ltd
VITALIS
SURAJ ESTATE DEVELOPERS LTD
Suraj One Business Bay
ICONIC PROPERTY DEVELOPERS PVT LTD
Builder: Rohan Developers Pvt. Ltd.
Rohan Developers Pvt. Ltd. has 5 registrations on MahaRERA, including Lifescapes Mirage and 7 Hughes. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record.
Frequently asked questions
What are my rights if Lifescapes Mirage is delayed beyond 31 Mar 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lifescapes Mirage?
The registered promoter entity is Rohan Developers Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lifescapes Mirage?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Lifescapes Mirage?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Lifescapes Mirage?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lifescapes Mirage?
The professionals named in the filing: Architect: M/s. 1 Architectural Consultants; Architect: M/s. Design Group; Engineer: Mr. Nikhil Shanghvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lifescapes Mirage?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback