Red flags

  • Litigation declared, 2 cases
  • 4 complaints at MahaRERA
  • Completion date moved by 66 months
  • 3 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jun 2027Possession promisedmoved 66 months from the original
1 of 11Construction stages donefurthest along: Basement (if any), 80%
61 of 93Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

Lifescapes Glory is a Residential / Group Housing project by Om Shanti Developers in Parel, 400012, registered with MahaRERA as P51900003605 on 5 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 66 months from the original filing. 32 of the 93 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameLifescapes Glory
  • TypeResidential / Group Housing
  • Location
    • Dr. Shirodkar Road
    • Parel
    • 400012
  • Pincode400012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900003605
  • ReraGenie IDRG-MH-24310

Builder

  • NameOm Shanti Developers
  • Entity typePartnership
  • PartnersChings Realties Private Limited, Kunjal Realties Private Limited

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed121 files

Current status

34%32 of 93 units booked
43.7%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lifescapes GloryNA291793093

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

Lifescapes Glory: 56% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)80%
Plinth80%
Stilt Floor80%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered85

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,393 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MCGMABCD-400001Mumbai City

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI5983.18
Proposed, not sanctioned5,973 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGrant Road, Mumbai-7
Estimated costRs 206.99 cr
Cost incurredRs 90.37 cr
Work done43.66%
BuildingWingEstimatedIncurred
Lifescapes GloryNARs 103.50 crRs 45.19 cr
-NARs 103.50 crRs 45.19 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S. Design Group
ArchitectDesign Group
EngineerM/s Mahimtura Consultant Pvt. Ltd.
EngineerSuresh Appa Patil
Chartered AccountantAnil Kumar Yadav
Chartered AccountantAnand Yadav
PartnerRole in project
Om Shanti Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900011121Dec 2021 → Dec 2022

Reason as filed by the promoterDue to covid slowdown, sales and construction were hampered. However, we have restarted the construction work and already completed construction of 13 out of 21 floors. We have also attached the revalidated CC for your perusal. Kindly allow us an extension of one year to enable us to complete the project. Thank you.

EXT51900013703Dec 2021 → Dec 2024

Reason as filed by the promoterThe Plot is owned by MCGM Estate with a reservation of School on it. We have completed the structure of School and internal finishing shall be completed within 6 months. The Project Lifescapes Glory is getting a additional FSI uner new DCPR 2034 guidelines and hence with the consent of Allottees, we are requesting the additional timeline till 31/12/2024

EA24072502180Dec 2021 → Jun 2027

Reason as filed by the promoterWe are seeking an extension for the completion of the project Lifescapes Glory under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016. The completion of the project Lifescapes Glory has not been achieved within the earlier proposed completion date of 31.12.2024. The delay is attributable to several unavoidable circumstances beyond our control. Firstly, during the COVID-19 pandemic and the subsequent lockdowns, the project faced significant disruptions due to a shortage of both labour and construction materials. These supply chain issues severely impacted the progress of o

Litigation declared2

CaseCourtStatus
CC12500510/2025Maharashtra Real Estate AuthorityOngoing
CC12500512/2025Maharashtra Real Estate AuthorityOngoing

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC006000000196273SUSHAMA VIJAY PARANJPE, MADHURA VIJAY PARANJPE, SHIVANGI ROHAN THAKKAR NEE SHIVANGI VIJAY PARANJPEOM SHANTI DEVELOPERS, ATUL BHUPATRAI GANDHI, BHARTI UMESH KANANI20/03/2021
CC12500510TUSHAR SHINGTEOm Shanti Developers14/02/2025
CC12500512SHILPA SHINGTEOm Shanti Developers14/02/2025
CC12600553Shubhangi Raj NarkarOm Shanti Developers01/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Glory_ Form 1 -Q-4_ 25-26.pdf7 May 2026
Withdrawal Update Form 2File: FORM 2_ITC_Q4 25-26.pdf7 May 2026
Withdrawal Update Form 3File: RERA_Form 3_Glory_Q4 FY 25-26.pdf7 May 2026
Withdrawal Update Form 1File: Glory_Form 1 Q3_ FY 25-26.pdf7 Mar 2026
Withdrawal Update Form 2File: FORM 2_Glory_Q3 FY 25-26.pdf7 Mar 2026
Withdrawal Update Form 3File: RERA_Form 3_Glory_Q3 FY 25-26.pdf7 Mar 2026
Withdrawal Update Form 1File: Glory_ Form 1 Q2_ FY 25-26.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2_ITC_Q2 FY 25-26.pdf16 Jan 2026
Withdrawal Update Form 3File: RERA_Form 3_Glory_Q2 FY 25-26.pdf16 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A_Glory_FY 24-25_Signed.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Glory FY 24-25.pdf5 Dec 2025
Withdrawal Update Form 1File: Form 1 Glory_Q1_ FY 25-26.pdf27 Nov 2025
Withdrawal Update Form 2File: FORM 2_Glory_Q1 FY 25-26.pdf27 Nov 2025
Withdrawal Update Form 3File: RERA Form 3 Glory Q1 FY 25-26.pdf27 Nov 2025
Form 1File: Glory_ Form 1 -Q-4 _FY 24-25.pdf16 Oct 2025
Form 2File: FORM 2 - Glory - Q4 FY 24-25.pdf16 Oct 2025
Form 3File: RERA_Form 3_ITC Glory_Q4 FY 24-25.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: SID_Glory_Q4 FY 24-25.pdf16 Oct 2025
Form 1File: Glory_ Form 1 -Q-3 _24-25.pdf24 Jul 2025
Form 2File: FORM 2_Glory_Q3 FY 24-25.pdf24 Jul 2025
Form 3File: RERA Form 3 Glory Q3 FY 24-25.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sales Inventory Disclosure_Glory_Q3 FY 24-25.pdf24 Jul 2025
Form 1File: Glory_ Form 1 -Q-2 _24-25-.pdf24 Jul 2025
Form 2File: FORM 2 - ITC - Q2 24-25.pdf24 Jul 2025
Form 3File: Lifescapes Glory_Form 3_Q2-FY 24-25.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Glory_Inventory Disclosure_Q2 FY 24-25.pdf24 Jul 2025
Form 1File: Glory_ Form 1 -Q-1 - 24-25-.pdf24 Jul 2025
Form 2File: FORM 2 - ITC - Q1 24-25.pdf24 Jul 2025
Form 3File: Form 3-ITC Glory-Q 1-FY 24-25.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Glory_Inventory Disclosure_Q1 FY 24-25.pdf24 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q4 24-25.pdf23 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 -Q-4 _24-25-.pdf22 May 2025
Certificates of CA (Form 3)File: RERA_Form 3_ITC Glory_Q4 FY 24-25.pdf21 May 2025
Disclosure of sold/ booked inventoryFile: SID_Glory_Q4 FY 24-25.pdf21 May 2025
Disclosure of sold/ booked inventoryFile: Sales Inventory Disclosure_Glory_Q3 FY 24-25.pdf15 Feb 2025
Certificates of CA (Form 3)File: RERA Form 3 Glory Q3 FY 24-25.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_Glory_Q3 FY 24-25.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 -Q-3 _24-25.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q2 24-25.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Glory_Inventory Disclosure_Q1 FY 24-25.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: Glory_Inventory Disclosure_Q2 FY 24-25.pdf6 Jan 2025
Certificates of CA (Form 3)File: Form 3-ITC Glory-Q 1-FY 24-25.pdf2 Jan 2025
Certificates of CA (Form 3)File: Form 3-Lifescapes Glory-Q 2-FY 24-25.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-ITC Glory-FY 23-24.pdf2 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 -Q-1 - 24-25-.pdf21 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 -Q-2 _24-25-.pdf21 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q1 24-25.pdf21 Dec 2024
Home Buyer /Allottee Grievance Redressal CellFile: Appointment Letter - GRO - Glory.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: ITC Glory_Inventory Disclosure_Q4 FY 23-24.pdf16 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 -Q-4 - 23-24.pdf26 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q4 23-24.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - ITC - 2023-2024.pdf26 Jun 2024
Certificates of CA (Form 3)File: FORM-3-LIFESCAPES GLORY-Q 4-2023-24.pdf10 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 -Q-3 - 23-24.pdf19 Mar 2024
Disclosure of sold/ booked inventoryFile: Glory_Inventory Disclosure_Q3 FY 23-24.pdf13 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q3 23-24.pdf6 Mar 2024
Disclosure of sold/ booked inventoryFile: Glory_Inventory Disclosure_Q3 FY 23-24.pdf6 Mar 2024
Certificates of CA (Form 3)File: RERA_Form 3_ITC Glory_Q3 FY 23-24.pdf6 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q2 23-24.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 - Q-2 - 23-24.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Glory 2023-24.pdf20 Jan 2024
Certificates of CA (Form 3)File: FORM 3-Lifescapes Glory-Q 2.pdf20 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q1 23-24.pdf4 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Glory Q1 2023-2024.pdf27 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1_Q1_FY 23-24.pdf6 Dec 2023
Certificates of CA (Form 3)File: FORM 3-LIFESCAPES GLORY-Q 1 F Y2023-24.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Inventory Disclosure - Lifescapes Glory FY 22-23 Q4.pdf9 Aug 2023
Certificates of CA (Form 3)File: LIFESCAPES Glory_FY 22-23_Q 1.pdf3 Aug 2023
Certificates of CA (Form 3)File: RERA_Form 3_ITC Glory_Q3 FY 22-23.pdf3 Aug 2023
Certificates of CA (Form 3)File: FORM 3-LIFESCAPES GLORY-Q 4 - FY 22-23.pdf3 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-ITC GLORY-2022-23.pdf3 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q1 22-23.pdf2 Aug 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q4 22-23.pdf2 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - ITC - 2022-2023.pdf2 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 - Q-1 - 22-23.pdf31 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 - Q-3 - 22-23.pdf31 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Glory_ Form 1 - Q-4 - 22-23.pdf31 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Glory Form 5.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Glory Form 5.pdf24 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - ITC - Q3 22-23.pdf2 Mar 2023

Keep Lifescapes Glory on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Parel

2 kmLifescapes GloryCompleted 28Lapsed / revoked 12Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: Om Shanti Developers

Om Shanti Developers has 1 registration on MahaRERA, including Lifescapes Glory. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Lifescapes Glory is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lifescapes Glory?

The registered promoter entity is Om Shanti Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lifescapes Glory?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lifescapes Glory?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lifescapes Glory?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lifescapes Glory?

The professionals named in the filing: Architect: M/S. Design Group; Architect: Design Group; Engineer: M/s Mahimtura Consultant Pvt. Ltd.; Engineer: Suresh Appa Patil; Chartered Accountant: Anil Kumar Yadav; Chartered Accountant: Anand Yadav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lifescapes Glory?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lifescapes Glory. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lifescapes Glory to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.