ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / LEO GROUP HOUSING COMPLEX

Registration lapsed No litigation declared Residential / Group Housing project

LEO GROUP HOUSING COMPLEX

By SIR GEORGE P JOSEPH

RG-MH-92786 · RERA P51800008538 · Last updated on MahaRERA portal: 31 Jul 2017

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 88 months past the filed date
  • 16 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2019Possession promised88 months past this date
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 88%
16Complaints at MahaRERAon this registration
Jump to the 24 documents Report an error

LEO GROUP HOUSING COMPLEX is a Residential / Group Housing project by SIR GEORGE P JOSEPH in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008538 on 19 Aug 2017. Possession was promised by 30 Jun 2019 and is now 88 months past that date. 16 complaints are on record with the regulator.

At a glance

Project

  • NameLEO GROUP HOUSING COMPLEX
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008538
  • ReraGenie IDRG-MH-92786

Builder

  • NameSIR GEORGE P JOSEPH
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

88 months past promisethis monthRegisteredAug 2017PromisedJun 2019

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2019
  • Revised completionNone
  • Buildings2 building records
  • Documents filed24 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LEO GROUP HOUSING COMPLEX C WINGNA110000
LEO GROUP HOUSING COMPLEX D WINGNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 31 Jul 2017, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 88%.

LEO GROUP HOUSING COMPLEX C WING61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
LEO GROUP HOUSING COMPLEX D WING61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Jul 2017, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes60%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered18
Open Space32
BuildingClosed/CoveredOpen SpaceTotal
LEO GROUP HOUSING COMPLEX C WING91625
LEO GROUP HOUSING COMPLEX D WING91625

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,614 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4823.4
Proposed, not sanctioned4,533 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJheel Darshan Mhada Complex A S Marg Powai76

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilip B. Jayawant
EngineerV. V. Joshi
PartnerRole in project
SIR GEORGE P JOSEPH-

Litigation declared10

CaseCourtStatus
49/2017High Court Mumbai Small Cause Court at MumbaiPENDING
542/2020HIgh Court of BombayPENDING
1458/2020Bombay City Civil CourtPENDING
289/2014Honble Divisional Joint Registrar Coop Society Mumbai DivisionPENDING
1109/2019Bombay City Civil CourtPENDING
2114/2019Bombay City Civil CourtPENDING
2495/2019Bombay City Civil CourtPENDING
2494/2019Bombay City Civil CourtPENDING
2113/2019Bombay City Civil CourtPENDING
2115/2019Bombay City Civil CourtPENDING

Complaints filed with MahaRERA16

Case no.ComplainantRespondentFiled
CC006000000196187SAMEER DHONDU MODAKSIR GEORGE P JOSEPH21/03/2021
CC006000000196188NIVEDITA JAYWANT PATILSIR GEORGE P JOSEPH21/03/2021
CC006000000196192ARCHANA GANESHKUMAR NEIKHARSIR GEORGE P. JOSEPH19/03/2021
CC006000000196194VIJAY RAMA GAWASSIR GEORGE P. JOSEPH14/03/2021
CC006000000196196SACHIN TUKARAM PATILSIR GEORGE P. JOSEPH05/06/2021
CC006000000196197VIRESH KASHINATH SAWANTSIR GEORGE P. JOSEPH14/03/2021
CC006000000193038Madhvendra Bhalchandra TripathiDr. Sir George P Joseph20/01/2021
CC12400293Ravi Motilal SiyalSIR GEORGE P JOSEPH01/10/2024
CC12503124Virendra Vijay KadamSIR GEORGE P JOSEPH04/09/2025
CC12503135Prakash Bhikaji PawarSIR GEORGE P JOSEPH05/09/2025
CC12503125Mahesh Prabhakar MayekarSIR GEORGE P JOSEPH04/09/2025
CC12503156Ravindra Kumar SahniSIR GEORGE P JOSEPH07/09/2025
CC12503140Chandrakant Arjun GavadeSIR GEORGE P JOSEPH06/09/2025
CC12501827Deepak Parshuram PagamSIR GEORGE P JOSEPH03/06/2025
CC12503123Sushil Jayawant RaneSIR GEORGE P JOSEPH04/09/2025
CC12503224Harshali Hemant ParabSIR GEORGE P JOSEPH12/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed24

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: IOD.pdf31 Jul 2017
Layout approvalFile: AMENDED PLAN-5.pdf31 Jul 2017
Layout approvalFile: AMENDED PLAN-4.pdf31 Jul 2017
Layout approvalFile: AMENDED PLAN-1.pdf31 Jul 2017
Layout approvalFile: AMENDED PLAN-2.pdf31 Jul 2017
Layout approvalFile: AMENDED PLAN-3.pdf31 Jul 2017
Layout approvalFile: AMENDED-6.pdf31 Jul 2017
PAN CardFile: PAN CARD.pdf31 Jul 2017
Copy of the legal title reportFile: TITLE REPORT.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED PLAN-1.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED PLAN-2.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED PLAN-3.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED PLAN-4.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED PLAN-5.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: AMENDED-6.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf31 Jul 2017
Declaration in FORM BFile: affadavit cum declaration.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form-3 G F Builder (1).pdf31 Jul 2017
Proforma of Allotment letterFile: Allotment Letter of Leo Group.pdf31 Jul 2017
Proforma of Allotment letterFile: compresspdf_SOxcPX22.pdf31 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LEO GROUP HOUSING COMPLEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmLEO GROUP HOUSING COMPLECompleted 48Lapsed / revoked 25Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: SIR GEORGE P JOSEPH

Sir George P Joseph has 2 registrations on MahaRERA, including Leo Heights and LEO GROUP HOUSING COMPLEX. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that LEO GROUP HOUSING COMPLEX shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if LEO GROUP HOUSING COMPLEX is delayed beyond 30 Jun 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LEO GROUP HOUSING COMPLEX?

The registered promoter entity is SIR GEORGE P JOSEPH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LEO GROUP HOUSING COMPLEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LEO GROUP HOUSING COMPLEX?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LEO GROUP HOUSING COMPLEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LEO GROUP HOUSING COMPLEX?

The professionals named in the filing: Architect: Dilip B. Jayawant; Engineer: V. V. Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LEO GROUP HOUSING COMPLEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LEO GROUP HOUSING COMPLEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LEO GROUP HOUSING COMPLEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.