Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
LENKAR S MAJESTIQ is a Residential / Group Housing project by KBSL PROPERTIES in Nashik, Maharashtra, registered with MahaRERA as P51600053872 on 8 Dec 2023. Possession is promised by 31 Dec 2028. 12 of the 116 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameLENKAR S MAJESTIQ
- TypeResidential / Group Housing
- Location
- MUMBAI NASHIK AGRA HIGHWAY
- DWARKA
- Nashik (M Corp.)
- Nashik
- 422011
- Pincode422011
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600053872
- ReraGenie IDRG-MH-65408
Builder
- NameKBSL PROPERTIES
- Entity typePartnership
- PartnersANILKUMAR PUNAMCHAND KHIVANSARA, RONAK MAHESH SHAH, KANTILAL KANAHYALAL LAHOTI, BHUSHAN ANILKUMAR KHIVANSARA, PARESH MANGALDAS SEJPAL, BHARAT WAGHJI RUPAREL, NANDAKISHOR BALARAMJI SARADA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Dec 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed114 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LENKAR S MAJESTIQ A WING | NA | 9 | 9 | 1 | 59 | 60 |
| LENKAR S MAJESTIQ B WING | NA | 9 | 0 | 28 | 0 | 28 |
| LENKAR S MAJESTIQ C WING | NA | 9 | 0 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 95%.
LENKAR S MAJESTIQ A WING69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LENKAR S MAJESTIQ B WING69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
LENKAR S MAJESTIQ C WING71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed115
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| LENKAR S MAJESTIQ A WING | 35 | 19 | 54 |
| LENKAR S MAJESTIQ B WING | 35 | 4 | 39 |
| LENKAR S MAJESTIQ C WING | 15 | 7 | 22 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHASHIKALA GANPAT LENKAR | Nashik | Nashik |
| AJIT GANPAT LENKAR | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| LENKAR S MAJESTIQ A WING | NA | Rs 14.50 cr | Rs 9.40 cr |
| LENKAR S MAJESTIQ B WING | NA | Rs 7.75 cr | Rs 6.45 cr |
| LENKAR S MAJESTIQ C WING | NA | Rs 7.08 cr | Rs 6.50 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ROHAN BABANRAO GHUGE BABANRAO GHUGE |
| Engineer | BABANRAO Y GHUGE BABARAO Y |
| Chartered Accountant | SANKET SANGALE S SANGALE |
| Chartered Accountant | MAHESH SHAH P SHAH |
| Partner | Role in project |
|---|---|
| KBSL PROPERTIES | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500080 | Ram G | KBSL PROPERTIES | 11/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 6 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A .pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: From 1 compressed.pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: From 2 compressed.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: From 3 compressed.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: From 1.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: From 2.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 _compressed.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: A certificate KBSL(1).pdf | 4 Dec 2025 |
| Withdrawal Update Form 1File: A certificate KBSL(1).pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: E certificate KBSL.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: E certificate KBSL.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 KBSL Signed_compressed.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 KBSL Signed_compressed.pdf | 4 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 KBSL Properties .pdf | 16 Oct 2025 |
| Form 1File: Architect Certificate_compressed.pdf | 25 Sep 2025 |
| Form 2File: Enginer Certificate_compressed.pdf | 25 Sep 2025 |
| Form 3File: FROM NO 3.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: kbsl Sold unsold_compressed.pdf | 25 Sep 2025 |
| Form 1File: Architect Certificate.pdf | 25 Sep 2025 |
| Form 2File: Engineer Certificate.pdf | 25 Sep 2025 |
| Form 3File: C A Certificate.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 25 Sep 2025 |
| Form 1File: Architect Certificate FY 24-25 (Q1).pdf | 25 Sep 2025 |
| Form 2File: Engineer Certificate FY 24-25 (Q1).pdf | 25 Sep 2025 |
| Form 3File: Form 3 FY 24-25 (Q1).pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold - KBSL.pdf | 25 Sep 2025 |
| Form 1File: kbsl A cert.pdf | 25 Sep 2025 |
| Form 2File: KBSL E cert.pdf | 25 Sep 2025 |
| Form 3File: KBSL From 3.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Kbsl Sold Inventory.pdf | 25 Sep 2025 |
| Form 1File: A certificate KBSL.pdf | 25 Sep 2025 |
| Form 2File: E Certificate KBSL.pdf | 25 Sep 2025 |
| Form 3File: KBSL Properties form 3_compressed.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory KBSL.pdf | 25 Sep 2025 |
| Form 1File: A certificate KBSL.pdf | 25 Sep 2025 |
| Form 2File: E certificate KBSL.pdf | 25 Sep 2025 |
| Form 3File: Form 3 KBSL Properties _compressed.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory KBSL..pdf | 25 Sep 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KBSL Properties form 3_compressed.pdf | 19 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A certificate KBSL.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E Certificate KBSL.pdf | 7 May 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Inventory KBSL.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: kbsl A cert.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KBSL From 3_compressed.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KBSL E cert.pdf | 30 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Kbsl Sold Inventory.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engieering.pdf | 27 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate, KBSL Properties.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KBSL CA Certificate 30_09_2024_compressed.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory for RERA for Majestiq.pdf | 23 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Annual Report on Statement of Accounts.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FY 24-25 (Q1).pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 24-25 (Q1).pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - KBSL.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 (Q1)_compressed.pdf | 17 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: KBSL - Declaration cum Undertaking.pdf | 19 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_compressed.pdf | 27 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Siddhivinayak Bank account declaration.pdf | 27 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate.pdf | 1 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 29 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 29 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances.pdf | 22 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrances.pdf | 22 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf | 22 Apr 2024 |
| Other - FinanceFile: Kbsl Mortgage Deed1.pdf | 4 Mar 2024 |
| Other - FinanceFile: Kbsl Mortgage Deed2.pdf | 4 Mar 2024 |
| Other - FinanceFile: Kbsl Mortgage Deed3.pdf | 4 Mar 2024 |
| Other - FinanceFile: Kbsl Mortgage Deed4.pdf | 4 Mar 2024 |
| Other - FinanceFile: Kbsl Mortgage Deed5.pdf | 4 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginer Certificate_compressed.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: kbsl Sold unsold_compressed.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - KBSL.pdf | 20 Jan 2024 |
| Copy of the legal title reportFile: Kbsl Adv Title Search .pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kbsl CA CERTIFICATE_compressed.pdf | 23 Nov 2023 |
| Proforma of Agreement for saleFile: draft.pdf | 23 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: kbsl Agreement to sale_compressed-1-12.pdf | 23 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: kbsl Agreement to sale_compressed-13-23.pdf | 23 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: kbsl rera encumbrance Finance.pdf | 4 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep LENKAR S MAJESTIQ on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DWARKA4,100+ in Nashik
Filed coordinates, straight-line distance. 334 registered projects within 2 km.
Anandvan Housing Complex
Ravi Mahajan Buildcon LLP
SHREEJI INFINIA
SHREEJI LIFE SPACE
Waterways
Sanklecha Construction Private Limited
Shreejis Gujral Arcade
SHREEJI LIFE SPACE
VRAJ METROPOLIS SOUTH
SHREE INFRA SPACE
ALEEF BREEZE APARTMENT
KHATIB BUILDERS AND DEVELOPERS
See every Nashik project, with the district possession charts
Builder: KBSL PROPERTIES
KBSL PROPERTIES has 1 registration on MahaRERA, including LENKAR S MAJESTIQ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if LENKAR S MAJESTIQ is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of LENKAR S MAJESTIQ?
The registered promoter entity is KBSL PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in LENKAR S MAJESTIQ?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against LENKAR S MAJESTIQ?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for LENKAR S MAJESTIQ?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at LENKAR S MAJESTIQ?
The professionals named in the filing: Architect: ROHAN BABANRAO GHUGE BABANRAO GHUGE; Engineer: BABANRAO Y GHUGE BABARAO Y; Chartered Accountant: SANKET SANGALE S SANGALE; Chartered Accountant: MAHESH SHAH P SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LENKAR S MAJESTIQ?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback