ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Laxminarayan SRA CHS Ltd

Registered No litigation declared Residential / Group Housing project

Laxminarayan SRA CHS Ltd

By Shree S S Developers Private Limited

RG-MH-60892 · RERA P51800018454 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 75.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
30 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 95%
248 of 474Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

Laxminarayan SRA CHS Ltd is a Residential / Group Housing project by Shree S S Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018454 on 1 Nov 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 226 of the 474 units on this registration are recorded sold or booked, and 30 of 55 construction stages are filed complete.

At a glance

Project

  • NameLaxminarayan SRA CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • Kokan nagar road
    • Bhandup west
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800018454
  • ReraGenie IDRG-MH-60892

Builder

  • NameShree S S Developers Private Limited
  • Entity typeCompany
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredNov 2018First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Nov 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings5 building records
  • Documents filed92 files

Current status

48%226 of 474 units booked
97.4%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AsterNA272279483
BegoniaNA272214414158
Laxmi narayan SRA CHS LtdNA272211910129
DaffodilsNA27221004104
Comp Building no 2NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

Aster71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Begonia71%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Laxmi narayan SRA CHS Ltd91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Daffodils91%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Comp Building no 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5
BuildingClosed/CoveredTotal
Aster11
Begonia11
Laxmi narayan SRA CHS Ltd11
Daffodils11
Comp Building no 211

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,324 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 75.00 crore
Declared on20 Mar 2026

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI14934.9
Proposed, not sanctioned11,949 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr Floor Filix Bldg Opp Asian Paints LBS Marg Bhandup west Mumbai-78
Estimated costRs 75.32 cr
Cost incurredRs 73.36 cr
Work done97.4%
BuildingWingEstimatedIncurred
AsterNARs 23.25 crRs 22.45 cr
BegoniaNARs 23.25 crRs 22.45 cr
Laxmi narayan SRA CHS LtdNARs 15.32 crRs 15.32 cr
DaffodilsNARs 12.50 crRs 12.50 cr
-NARs 1.00 crRs 65.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign crest Axiom
EngineerVinayak Chopdekar & Associates
EngineerMicrotech Construction
Chartered AccountantVijay Sawant
Chartered AccountantA N K S & Co.
Chartered AccountantKetan Mistry
PartnerRole in project
Shree S S Developers Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA05012619297Dec 2025 → Dec 2026

Reason as filed by the promoterOut of the four buildings forming part of the project, two buildings namely Laxmi Narayan SRA CHS Ltd. and Daffodils have been fully completed, and the Occupancy Certificates (OC) for the same have already been obtained. Copies of the Occupancy Certificates are attached herewith for ready reference. With respect to the remaining two buildings, namely Aster and Begonia, the construction work is actively in progress. The internal finishing and allied works for these buildings have been completed up to approximately 75% as on date. The delay in completion of the balance construction is attributab

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Aug 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: LN - Form 2A.pdf27 Jul 2026
Withdrawal Update Form 1File: Form 1 LN.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 LN_Compressed.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 LN Q1 FY 26-27 signed_compressed.pdf20 Jul 2026
Withdrawal Update Form 1File: LN Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 LN.pdf20 Apr 2026
Withdrawal Update Form 3File: LN Form 3_Signed_Compressed V1.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1 Q3 of FY 25-26.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 of Q3 of FY 25-26 compressed.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 of FY 25-26 signed - Copy.pdf20 Jan 2026
Withdrawal Update Form 1File: LN Form 1.pdf5 Jan 2026
Withdrawal Update Form 2File: LN Form 2 compressed.pdf5 Jan 2026
Withdrawal Update Form 3File: LN Form 3 Q2 FY 25-26 _V1_Compressed.pdf5 Jan 2026
Form 1File: LN Form 1.pdf20 Oct 2025
Form 2File: LN Form 2 compressed.pdf20 Oct 2025
Form 3File: LN Form 3 Q2 FY 25-26 _V1_Compressed.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: LN Disclosure of Sold Inventory.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Laxmi narayan Signed.pdf29 Sep 2025
Form 1File: Form-1 30_06_2025 PDF Laxmi.pdf18 Jul 2025
Form 2File: Laxminarayan Rera 30-06-2025_1.pdf18 Jul 2025
Form 3File: Laxmi Narayan Form 3_V1_Compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold.pdf18 Jul 2025
Form 2A (FY 2024-2025)File: LN - Form 2A - 31032025.pdf26 Jun 2025
Form 2A (FY 2021-2022)File: Form 2A - 31-03-2022.pdf13 Jun 2025
Form 2A (FY 2020-2021)File: Form 2A - 31-03-2021.pdf13 Jun 2025
Form 2A (FY 2022-2023)File: Form 2A - 31-03-2023.pdf13 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A - 31-03-2024.pdf13 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 - 31-03-2024.pdf13 Jun 2025
Form 1File: LN Form-1 30_06_2024 pdf.pdf12 Jun 2025
Form 2File: LN FORM 2 30_06_2024.pdf12 Jun 2025
Form 3File: Form 3 30_06_2024_compressed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q1.pdf12 Jun 2025
Form 1File: LN Form-1 30_09_2024 pdf.pdf12 Jun 2025
Form 2File: LN FORM 2 30_09_2024_compressed.pdf12 Jun 2025
Form 3File: LN - Form 3 30_09_2024_compressed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Q2.pdf12 Jun 2025
Form 1File: LN Form-1 31_12_2024 pdf.pdf12 Jun 2025
Form 2File: LN FORM 2 31_12_2024.pdf12 Jun 2025
Form 3File: Form 3 31_12_2024_compressed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q3.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q4.pdf12 Jun 2025
Form 1File: LN Form-1 31_03_2025 pdf.pdf12 Jun 2025
Form 2File: LN FORM 2 31_03_2025_compressed.pdf12 Jun 2025
Form 3File: LN Form 3 31_03_2025_compressed.pdf12 Jun 2025
Form 1File: Form-1 30_06_2023.pdf12 Jun 2025
Form 2File: Form 2 30-06-2023.pdf12 Jun 2025
Form 3File: LN - Form 3 30-06-2023_compressed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q1 FY 23-24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q2 FY 23-24.pdf12 Jun 2025
Form 1File: Form-1 30_09_2023.pdf12 Jun 2025
Form 2File: Form 2 30-09-2023_compressed.pdf12 Jun 2025
Form 3File: LN - Form 3 30-09-2023_compressed.pdf12 Jun 2025
Form 1File: Form-1 31_12_2023.pdf12 Jun 2025
Form 2File: Form 2 30-12-2023.pdf12 Jun 2025
Form 3File: LN - Form 3 31-12-2023_compressed.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q3 FY 23-24.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4 FY 23-24.pdf12 Jun 2025
Form 1File: Form-1 31_03_2024 pdf.pdf12 Jun 2025
Form 2File: Form 2 31-03-2024.pdf12 Jun 2025
Form 3File: LN - Form 3 31-03-2024_compressed.pdf12 Jun 2025
Form 5 (FY 2019-2020)File: Form 5 - 31-03-2020.pdf12 Jun 2025
Form 5 (FY 2022-2023)File: Form 5 - 31-03-2023.pdf12 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 2020-21.pdf24 Apr 2023
Certificates of CA (Form 5)File: Form 5 2020-21.pdf24 Apr 2023
Certificates of CA (Form 5)File: Form-5 2021-22.pdf24 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf24 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 new.pdf20 Oct 2022
Certificates of CA (Form 3)File: Form - 3 new.pdf20 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect certificate.pdf10 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certifcate.pdf10 Jan 2022
Certificates of CA (Form 3)File: Form-3 Chartered account Certificate.pdf10 Jan 2022
Certificates of CA (Form 3)File: Form-2 Engineer Certifcate.pdf10 Jan 2022
Certificates of CA (Form 3)File: Form 3.pdf19 Apr 2021
PAN CardFile: Pancard - 19092020.pdf23 Nov 2020
PAN CardFile: Pancard.pdf23 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Further CC LN.pdf23 Nov 2020
Proforma of Allotment letterFile: Master Copy - RERA AGREEMENT -Shree S S Developers Pvt ltd.pdf23 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: cc of laxminarayan project.pdf30 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: cc of laxminarayan project.pdf30 Oct 2018

How this compares with Mumbai Suburban

48%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Laxminarayan SRA CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup west6,700+ in Mumbai Suburban

Builder: Shree S S Developers Private Limited

Shree S S Developers Private Limited has 5 registrations on MahaRERA, including SHREE SAMARTH GALAXY SRA CHS LTD and VISHNUBHUVAN CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Laxminarayan SRA CHS Ltd is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Laxminarayan SRA CHS Ltd?

The registered promoter entity is Shree S S Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Laxminarayan SRA CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Laxminarayan SRA CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Laxminarayan SRA CHS Ltd?

The professionals named in the filing: Architect: Design crest Axiom; Engineer: Vinayak Chopdekar & Associates; Engineer: Microtech Construction; Chartered Accountant: Vijay Sawant; Chartered Accountant: A N K S & Co.; Chartered Accountant: Ketan Mistry. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Laxminarayan SRA CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Laxminarayan SRA CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Laxminarayan SRA CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.