Home / Browse projects / Raigarh, Maharashtra / LAXMI POOJA

Registration lapsed No litigation declared Residential / Group Housing project

LAXMI POOJA

By Shraddha Enterprises

RG-MH-29685 · RERA P52000029103 · Last updated on MahaRERA portal: 20 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 25 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Sep 2024Possession promised25 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

LAXMI POOJA is a Residential / Group Housing project by Shraddha Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000029103 on 26 Apr 2021. Possession was promised by 30 Sep 2024 and is now 25 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameLAXMI POOJA
  • TypeResidential / Group Housing
  • Location
    • Survey No 17
    • Hissa No. 3
    • Bhopele
    • Bopele
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • RERA no.P52000029103
  • ReraGenie IDRG-MH-29685

Builder

  • NameShraddha Enterprises
  • Entity typePartnership
  • PartnersNarendra Patel, Smit Patel
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

25 months past promisethis monthRegisteredApr 2021First promiseSep 2022Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 Apr 2021
  • Promised completion30 Sep 2024
  • Revised completionRevised to 30 Sep 2024 (originally 30 Sep 2022)
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 2NA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building No 2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,022 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Maruti Pandurang GhateNeralRaigarh

Approvals and building plan

Permissible FSI1763.45
Proposed, not sanctioned1,763 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHARGHAR, NAVI MUMBAI 410210

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKaushal Jadia
EngineerSamarth Agarwal
Chartered AccountantRitesh Patel
Chartered AccountantPatel Senghani and Parvadiya
PartnerRole in project
Shraddha Enterprises-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017625Sep 2022 → Sep 2024

Reason as filed by the promoterThe project is entirely completed and the application has already been submitted to the concerned department for receiving Occupancy Certificate in the month of March-2023. Awaiting for the receipt of O.C. so that we can give possession to the respective buyers.

EXT52000012454Sep 2022 → Sep 2023

Reason as filed by the promoterThe one of the main reason for extension request is recent amendment made in Building plan vide commencement certificate received from Zilla Adhikari department, Raigad - Alibaug dated 04/02/2022 wherein additional FSI was approved and subsequently extra units are required to be built. This requires time to complete the same. Further, the construction was halted due to sudden increase in the raw material prices on account of Ukraine-Russia war in March-2022 and in the first quarter of F.Y.2021-22 due to COVID-19 pandemic.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: From-4.pdf20 Jan 2025
Other - TechnicalFile: OC LAXMI PUJA_compressed.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 _AUDIT_LAXMI_23-24.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Laxmi Pooja --- EC 15-04-24.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3_Q4_23-24.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Shraddha_Circular No 29 Sold Unsold Invetory.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Oct 2023
Declaration in FORM BFile: Form B_Maruti.pdf3 Oct 2023
Declaration in FORM BFile: Form B_Shraddha.pdf3 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Assurance Letter form 2A.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold InvetorY.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold InvetorY.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold InvetorY.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _AUDIT_LAXMI_22-23_Sign.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 (for RERA) DATED (1).pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1( 11-04-2023).pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Laxmi Pooja EC 11-04-23.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Shradhha-31-03-23.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Laxmi Pooja EC 03-01-23 with DSC.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Shraddha Ent Q3.pdf20 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Ent Q3.pdf20 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - Shraddha_Singed.pdf20 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 _AUDIT_LAXMI_21-22_Sign.pdf30 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Signed_compressed.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Signed_compressed.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory_Signed.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Signed_compressed.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold unsold inventory(1).pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf7 Apr 2022
Layout approvalFile: Building Layout_Revised.pdf2 Apr 2022
Building plan approvalFile: Building Plan_1_Revised.pdf2 Apr 2022
Building plan approvalFile: Building Plan_2_Revised.pdf2 Apr 2022
Copy of Layout Approval (in case of layout)File: Building Layout_Revised.pdf2 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_1_Revised.pdf2 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan_2_Revised.pdf2 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: AMENDED_CC_4-2-22_compressed.pdf2 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Signed.pdf2 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Signed.pdf2 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Shraddha Amended_compressed.pdf2 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 shraddha_Signed.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shraddha_Compress.pdf7 Jan 2022
CERSAI detailsFile: Cersai.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory list.pdf7 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 _Q2_Compress.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2-A.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory list.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shraddha ENt.pdf17 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shraddha Ent.pdf17 Aug 2021
Declaration about Commencement CertificateFile: Shraddha Ent DECLARATION CC.pdf15 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Form-1 (SNo17 Bhopele) as on 30-06-2021.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shraddha Ent Form 2A.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: Shraddha ent sold unsold.pdf15 Aug 2021
Copy of the legal title reportFile: Title 17-3 (23-04-21)-Comp.pdf23 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (S No17 Bhopele) rev Final.pdf3 Apr 2021
Proforma of Allotment letterFile: Draft Sale Deed.pdf3 Apr 2021
Layout approvalFile: Jumbo_20210312_0003-Layout.PDF23 Mar 2021
Building plan approvalFile: Jumbo_20210312_0004.PDF23 Mar 2021
Building plan approvalFile: Jumbo_20210312_0005.PDF23 Mar 2021
Building plan approvalFile: Jumbo_20210312_0002.PDF23 Mar 2021
PAN CardFile: Shraddha Enterprises_Pan.pdf23 Mar 2021
Details of encumbrancesFile: Non Encumerances certificate.pdf23 Mar 2021

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 24 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI POOJA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhopele5,900+ in Raigarh

Builder: Shraddha Enterprises

Shraddha Enterprises has 2 registrations on MahaRERA, including LAXMI POOJA and SHHRADDHA AVENUE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that LAXMI POOJA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if LAXMI POOJA is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI POOJA?

The registered promoter entity is Shraddha Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI POOJA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI POOJA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI POOJA?

The professionals named in the filing: Architect: Kaushal Jadia; Engineer: Samarth Agarwal; Chartered Accountant: Ritesh Patel; Chartered Accountant: Patel Senghani and Parvadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI POOJA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI POOJA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI POOJA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.