Red flags

  • Rs 8.30 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

LAXMI LEELA ARHUM is a Residential / Group Housing project by LAXMI LEELA CONSTRUCTIONS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078714 on 7 Jan 2025. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameLAXMI LEELA ARHUM
  • TypeResidential / Group Housing
  • Location
    • JAWAHAR NAGAR ROAD NO 12
    • GOREGAON WEST
    • Goregaon
    • Borivali
    • Mumbai Suburban
    • 400062
  • Pincode400062
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078714
  • ReraGenie IDRG-MH-23402

Builder

  • NameLAXMI LEELA CONSTRUCTIONS LLP
  • Entity typePartnership
  • Designated PartnersDHAIRYA PRAVINKUMAR KOTHARI, PRAVIN KUMAR AASULALJI KOTHARI
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jan 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

50.8%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LAXMI LEELA ARHUMNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

LAXMI LEELA ARHUM: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered20
Open Space5

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area497 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 8.30 crore
CERSAI search filedYes
Declared on13 Jul 2026
LandownerVillageDistrict
LAXMI LEELA CONSTRUCTIONS LLPGoregaonMumbai Suburban
SHEETAL APARTMENT CHSLGoregaonMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1791.65
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGRD FLOOR SHOP NO 02 06 B WING GALAXY HEIGHT MAIN LINK RD BANGUR NAGAR GOREGAON WEST DIST MUMBAI MUMBAI MAHARASHTRA 400104
Estimated costRs 18.81 cr
Cost incurredRs 9.56 cr
Work done50.84%
BuildingWingEstimatedIncurred
-NARs 10.71 crRs 6.41 cr
LAXMI LEELA ARHUMNARs 8.11 crRs 3.16 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDAKSH ABHAY HIRANI
EngineerDIVYESH KOTHARI
Chartered AccountantSANJAY BAJRANGLAL SHARMA
Chartered AccountantPRANAY PUNAMIYA AND CO.
Chartered AccountantZUBIN HARIA AND ASSOCIATES
PartnerRole in project
LAXMI LEELA CONSTRUCTIONS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_Architect Certificate_Laxmi Leela Arhum_Q4_2025-26.pdf20 May 2026
Withdrawal Update Form 2File: Form 2_Engineer Certificate_Q4_2025-26_Laxmi Leela Construction.pdf20 May 2026
Withdrawal Update Form 3File: Form-3_Laxmi Leela Arhum_Q4_25-26_compressed.pdf20 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate_Laxmi Leela Arhum_Q3_2025-26.pdf10 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate_Laxmi Leela Arhum_Q3_2025-26.pdf10 Mar 2026
Withdrawal Update Form 2File: form2_Engineer Certificate_Laxmi Leela Arhum_Q3_2025-26.pdf10 Mar 2026
Withdrawal Update Form 2File: form2_Engineer Certificate_Laxmi Leela Arhum_Q3_2025-26.pdf10 Mar 2026
Withdrawal Update Form 3File: Form-3_Laxmi Leela Arhum_Q3_25-26.pdf10 Mar 2026
Withdrawal Update Form 3File: Form-3_Laxmi Leela Arhum_Q3_25-26.pdf10 Mar 2026
Form 5 (FY 2024-2025)File: Form 5_ C A Certificate_ 2024-225_ laxmi leela Arhum.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1_Work Completion _Letter Laxmi Arhum_QTR 2 2025-26.pdf14 Nov 2025
Withdrawal Update Form 2File: FORM 2_LAXMI LEELA ARHUM_Q2.pdf14 Nov 2025
Withdrawal Update Form 3File: FORM 3_Laxmi Leela Arhum_Q2_2025-26.pdf14 Nov 2025
Form 1File: Form 1 Work Completion Letter Laxmi Arhum.pdf10 Oct 2025
Form 2File: Form 2 Laxmi Arhum Q4_001.pdf10 Oct 2025
Form 3File: FORM 3_LAXMI LEELA ARHUM_Q4.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: Unit sold unsold_Laxmi Leela Arhum.pdf10 Oct 2025
Withdrawal Update Form 1File: FORM 1Work Completion _Letter Laxmi Arhum_QTR 1 2025-26.pdf10 Oct 2025
Withdrawal Update Form 2File: form 2_002.pdf10 Oct 2025
Withdrawal Update Form 3File: form -03.pdf10 Oct 2025
Building plan approvalFile: 1ST PAGE FULL CC.pdf30 Aug 2025
Building plan approvalFile: 2ND PAGE FULL CC.pdf30 Aug 2025
Building plan approvalFile: 3RD PAGE FULL CC.pdf30 Aug 2025
Building plan approvalFile: 2482993Amendletter_signed.pdf30 Aug 2025
Commencement certificateFile: 2488370_FurtherCC_signed Arhum (1).pdf29 Aug 2025
Layout approvalFile: 1ST PAGE FULL CC.pdf29 Aug 2025
Building plan approvalFile: 2ND PAGE FULL CC.pdf29 Aug 2025
Building plan approvalFile: 3RD PAGE FULL CC.pdf29 Aug 2025
Withdrawal Update Form 1File: FORM 1Work Completion _Letter Laxmi Arhum_QTR 1 2025-26.pdf29 Aug 2025
Withdrawal Update Form 2File: form 2_002.pdf29 Aug 2025
Withdrawal Update Form 3File: form -03.pdf29 Aug 2025
Building plan approvalFile: 2482993Amendletter_signed.pdf24 Jul 2025
Building plan approvalFile: 1st PAGE AMENDMENT PLAN 24072025 compressed (1).pdf24 Jul 2025
Building plan approvalFile: 2nd PAGE AMENDMENT PLAN 24072025 compressed.pdf24 Jul 2025
Building plan approvalFile: 3rd PAGE AMENDMENT PLAN 24072025 compressed.pdf24 Jul 2025
Details of encumbrances concerned to FinanceFile: Encumbrances_Laxmi Arhum_aditya birla.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Work Completion Letter Laxmi Arhum.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_LAXMI LEELA ARHUM_Q4.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Laxmi Arhum Q4_001.pdf22 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrances_Laxmi Arhum_aditya birla.pdf22 Apr 2025
Proforma of Agreement for saleFile: AGREEMENT_Laxmi ARHUM_ABHF.pdf22 Apr 2025
Other - LegalFile: CERSAI REPORT LLA.pdf24 Dec 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE NEW.pdf24 Dec 2024
Other - LegalFile: APPROVED PLAN.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 CA Certificate FY 24-25 Regn - V2.pdf17 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B SEPERATE BANK ACCOUNT LAXMI LEELA ARHUM.pdf16 Dec 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCRUMBANCES SHEETAL001.pdf20 Nov 2024
CERSAI detailsFile: CERSAI SEARCH REPORT NEW.pdf20 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A FOR SEPERATE BANK ACCOUNT.pdf20 Nov 2024
Details of encumbrances concerned to LegalFile: FINANCE ENCRUMBANCES SHEETAL001.pdf20 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED UNSECURED FINANCE (2).pdf20 Nov 2024
Other - TechnicalFile: Annexure A Declaration cum undertaking.pdf19 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST OF OTHER REAL ESTATE D K.pdf19 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST OF OTHER REAL ESTATE PRIYANK.pdf19 Nov 2024
Building plan approvalFile: IOD Plan Final.pdf15 Nov 2024
Building plan approvalFile: 2442775_IOD_signed.pdf15 Nov 2024
Layout approvalFile: IOD Plan Final.pdf15 Nov 2024
Copy of Layout Approval (in case of layout)File: IOD Plan Final.pdf15 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: SHEETAL PLINTH CC.pdf15 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2442775_IOD_signed.pdf15 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Plan Final.pdf15 Nov 2024
Other - LegalFile: Jawahar Nagar NOC for Redevelopment.pdf15 Nov 2024
Copy of the legal title reportFile: TITLE_compressed.pdf14 Nov 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf12 Nov 2024
Deviation Report with respect to Allotment letterFile: No Division in Allotment Letter as per RERA.pdf12 Nov 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf12 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A INTEREST IN OTHER REAL ESTATE001.pdf12 Nov 2024
Disclosure for secured/unsecured finance availed for the projectFile: FINANCE ENCRUMBANCES SHEETAL001.pdf12 Nov 2024
Proforma of Allotment letterFile: Allotment.pdf9 Nov 2024
Declaration in FORM BFile: Form B_001_compressed.pdf9 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 ( Sheetal).pdf9 Nov 2024
Declaration about Commencement CertificateFile: FORMAT D FOR LAXMI LEELA ARHUM001.pdf9 Nov 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION IN AGREEMENT FOR LAXMI LEELA ARHUM001_compressed.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2024
PAN CardFile: PAN LAXMI LEELA CONSTRUCTION LLP.pdf6 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Laxmi Callistaplot no 283 Jawahr Nagar Road No 3Goregaon West Mumabi 40010290CompletedSep 2019Late, Feb 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI LEELA ARHUM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON WEST6,700+ in Mumbai Suburban

2 kmLAXMI LEELA ARHUMCompleted 132Lapsed / revoked 70Abeyance 1Other 139Dot size: filed unitsN

Filed coordinates, straight-line distance. 342 registered projects within 2 km.

Builder: LAXMI LEELA CONSTRUCTIONS LLP

LAXMI LEELA CONSTRUCTIONS LLP has 1 registration on MahaRERA, including LAXMI LEELA ARHUM. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LAXMI LEELA ARHUM is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI LEELA ARHUM?

The registered promoter entity is LAXMI LEELA CONSTRUCTIONS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI LEELA ARHUM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI LEELA ARHUM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI LEELA ARHUM?

The professionals named in the filing: Architect: DAKSH ABHAY HIRANI; Engineer: DIVYESH KOTHARI; Chartered Accountant: SANJAY BAJRANGLAL SHARMA; Chartered Accountant: PRANAY PUNAMIYA AND CO.; Chartered Accountant: ZUBIN HARIA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI LEELA ARHUM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI LEELA ARHUM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI LEELA ARHUM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.