Home / Browse projects / Ratnagiri, Maharashtra / Lakshminarayan Residency

Completed No litigation declared Residential / Group Housing project

Lakshminarayan Residency

By M/s Phatak Developers

RG-MH-28973 · RERA P52800027427 · Last updated on MahaRERA portal: 9 Nov 2023

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Lakshminarayan Residency is a Residential / Group Housing project by M/s Phatak Developers in Ratnagiri, Maharashtra, registered with MahaRERA as P52800027427 on 10 Dec 2020. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameLakshminarayan Residency
  • TypeResidential / Group Housing
  • Location
    • Lakshminarayan mandir
    • Dattanagar
    • Jalgaon
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800027427
  • ReraGenie IDRG-MH-28973

Builder

  • NameM/s Phatak Developers
  • Entity typePartnership
  • PartnersANAND SHRIDHAR PHATAK, SNEHA AKSHAY PHATAK
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2020PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Dec 2020
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lakshminarayan ResidencyNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Lakshminarayan Residency: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered6
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area650 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Phatak DevelopersJalgaon Ratnagiri

Approvals and building plan

Permissible FSI779.96
Proposed, not sanctioned780 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDapoli

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPushkar Pradhan
EngineerJogaesh Madhukar Sadvilkar
Chartered AccountantShreyas Kakirde
PartnerRole in project
M/s Phatak Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52800017717Jun 2022 → Jan 2023

Reason as filed by the promoterWe unable to complete the project within original due date due to non availability of building material & some financial & technical Issues. We have not applied earlier extension, Hence we request to extend the date of completion of the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Feb 2023

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-Lakshminarayan Residency.pdf9 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- Lakshminarayan 2020-21.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Lakshminarayan 2021-22.pdf31 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Lakshminarayan 2022-23.pdf31 Oct 2023
Declaration in FORM BFile: Form B-Lakshminarayan Resize.pdf21 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory Lakshminarayan 30-9-2023.pdf21 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT DECLARATION.pdf9 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Lakshminarayan March 2021.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Lakshminarayan March 2022.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Lakshminarayan March 2023.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory Lakshminarayan.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lakshminarayan March 2021.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Lakshminarayan June 2021.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lakshminarayan Sep 2021.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Lakshminarayan Dec 2021.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lakshminarayan March 2022.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lakshminarayan June 2022.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Lakshminarayan Sep 2022.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Lakshminarayan Dec 2022.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Lakshminarayan March 2023.pdf6 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Lakshminarayan March 2021.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Lakshminarayan June 2021.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakshminarayan Sept 2021.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakshminarayan Dec 2021.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakshminarayan March 2022.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakshminarayan June 2022.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakdhminarayan Sept 2022.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakshminarayan Dec 2022.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Lakshminarayan March 2023.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Lakshminarayan March 2021.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayan June 2021.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminayan Sept 2021.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayan Dec 2021.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayn March 2022.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayan June 2022.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayan Sept 2022.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayan Dec 2022.pdf1 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Lakshminarayan March 2023.pdf1 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation with respect to Allotment Letter.pdf1 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation with respect to Agreement for sale.pdf1 Oct 2023
Details of encumbrances concerned to FinanceFile: Declaration to Legal.pdf17 May 2023
Details of encumbrances concerned to LegalFile: Declaration to Legal.pdf17 May 2023
CERSAI detailsFile: Cersai Report.pdf15 May 2023
Proforma of Agreement for saleFile: lakshminarayan sathekhat.pdf4 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 For Upload New.pdf23 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 For Upload New.pdf23 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Laxmi Narayan OC.pdf4 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: LAXMINARAYAN RESIDENCY FORM 4.pdf5 Aug 2022
Details of encumbrancesFile: Maharashtra Real Estate Regulatory Authority-converted.pdf6 Dec 2020
Declaration in FORM BFile: form B builder-compressed.pdf6 Dec 2020
Proforma of Allotment letterFile: laksminarayan Sample Agreement_compressed-merged.pdf6 Dec 2020
Building plan approvalFile: Lakshminarayan building plan.pdf1 Dec 2020
Layout approvalFile: Lakshminarayan building plan.pdf1 Dec 2020
PAN CardFile: aks basic docs.pdf1 Dec 2020
Copy of the legal title reportFile: Lakshminarayan search.pdf1 Dec 2020
Copy of Layout Approval (in case of layout)File: Lakshminarayan building plan.pdf1 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: Lakshminarayan building plan.pdf1 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: Lakshmi Narayan NA order.pdf1 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHATAK CAPITAL FORM 1 CERTIFICATE-min.pdf1 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Lakshminarayan Engineer certificate.pdf1 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Lakshmi Narayan CA report.pdf1 Dec 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Padmashree GruhsankulNandanvan nagar At po Jalgaon Tal Dapoli9CompletedJun 2015May 2015
Varadashree GruhSankulAt Brahmanwadi Po Jalgaon Tal Dapoli DIst Ratnagiri16CompletedOct 2014Sep 2014

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Lakshminarayan Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dattanagar1,100+ in Ratnagiri

2 kmLakshminarayan ResidencyCompleted 9Lapsed / revoked 5Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: M/s Phatak Developers

M/s Phatak Developers has 4 registrations on MahaRERA, including Phatak Capital and Lakshminarayan Residency. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Lakshminarayan Residency is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lakshminarayan Residency?

The registered promoter entity is M/s Phatak Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lakshminarayan Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lakshminarayan Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lakshminarayan Residency?

The professionals named in the filing: Architect: Pushkar Pradhan; Engineer: Jogaesh Madhukar Sadvilkar; Chartered Accountant: Shreyas Kakirde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lakshminarayan Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lakshminarayan Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lakshminarayan Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.